States › California

Lynch Creek Trail

Greenway in California

Runs through Petaluma · Sonoma County

Conditions now

Loading the weather near Petaluma…

Forecast by the National Weather Service for Petaluma · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Petaluma Boulevard North mile 0 · water directions to trailhead 1
  2. Parking at North McDowell Boulevard mile 1.3 directions to trailhead 2
Lynch Creek, beside the trail (opens in a new tab)
Lynch Creek, beside the trail · Photo: Stepheng3 · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Lynch Creek Trail is a paved bicycle and pedestrian path along Lynch Creek in Petaluma, Sonoma County, California. Caltrans has described it as a popular bike and pedestrian route, and TrailLink, which counts it among the Petaluma Trails, describes a paved path beside the creek, lined with trees and with a view of Sonoma Mountain.

This record maps about 1.9 miles. The path starts at Petaluma Boulevard North and North Water Street on the edge of downtown, runs northeast along the creek, passes under U.S. Highway 101 just north of the East Washington Street interchange, crosses North McDowell Boulevard, and ends among residential streets near Sleepy Hollow Lane on the city's east side. OpenStreetMap shows parking near the Petaluma Boulevard North and North McDowell Boulevard crossings.

In September 2020 Caltrans closed the trail overnight on both sides of the Highway 101 undercrossing so crews could remove equipment used to widen the freeway bridge, part of the Marin Sonoma Narrows project adding carpool lanes between Lakeville Highway and Corona Road. In November 2020 the city closed the trail between Water and Lakeville streets for up to a week for emergency repair of a sanitary sewer force main.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: January and March to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Petaluma Airport, 2.5 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586164687278818182766658
Low °F394042444750525351484238
Precipitation, in4.85.23.31.70.90.300.10.11.32.75.2
Snow, in000000000000
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1916 Santa Rosa sheet (1:62,500); the 1954 Cotati sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Overnight Closure of Bike Trail in Petaluma (September 4, 2020) — Caltrans District 4 · government source · checked Oct 16, 2026
    Supports: popular bike and pedestrian route, Highway 101 undercrossing just north of the East Washington Street interchange, overnight closure on both sides to remove bridge-widening equipment, Marin Sonoma Narrows carpool-lane project between Lakeville Highway and Corona Road
  3. Lynch Creek Trail Closed For Emergency Sewer Work (November 23, 2020) — Petaluma Patch · press · checked Oct 16, 2026
    Supports: November 2020 city closure between Water and Lakeville streets for up to a week, Public Works and Utilities Department repair of a sanitary sewer force main
  4. Petaluma Trails — TrailLink · web · checked Oct 16, 2026
    Supports: paved path alongside Lynch Creek, trees along its banks, view of Sonoma Mountain, inclusion in the Petaluma Trails
  5. OpenStreetMap ways named Lynch Creek Trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: mapped extent of about 1.9 miles from Petaluma Boulevard North and North Water Street to residential streets near Sleepy Hollow Lane, crossing of North McDowell Boulevard, parking near trail crossings

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.