States › Michigan

M-5 to I-275 Metro Trail Connector

Greenway in Michigan · OpenStreetMap relation

Runs through Novi · Oakland County

Conditions now

Loading the weather near Novi…

Forecast by the National Weather Service for Novi · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Meadowbrook Road mile 0.2 directions to trailhead 1
  2. Parking at West 12 Mile Road mile 0.7 directions to trailhead 2
  3. Parking at West 12 Mile Road mile 0.7 directions to trailhead 3
  4. North Parking Lot mile 1 directions to North Parking Lot
  5. Parking at Main Parking Entry mile 1 directions to trailhead 5
  6. Parking at West 13 Mile Road mile 2 directions to trailhead 6
  7. Parking at West 13 Mile Road mile 2 directions to trailhead 7
  8. Parking at Lenox Park Drive mile 2.1 directions to trailhead 8
  9. Parking at West 13 Mile Road mile 2.1 directions to trailhead 9
Novi, along the trail (opens in a new tab)
Novi, along the trail · Photo: Dwight Burdette · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The M-5 to I-275 Metro Trail Connector, which the City of Novi calls the Metro Connector Trail, is a 10-foot-wide path along the east side of Meadowbrook Road in Novi, Michigan. It links two trails owned by the Michigan Department of Transportation: the I-275 Metro Trail and the M-5 Metro Trail. In August 2010 an MDOT spokeswoman said plans called for using Meadowbrook and 13 Mile to connect the M-5 path to the I-275 trail, which ended at Meadowbrook in Novi.

Novi planned the connector in two phases. Phase I was 0.7 mile from the end of the I-275 pathway just south of I-96 to the north side of Twelve Mile Road, giving the city its first non-motorized crossing of I-96. Phase II was 1.6 miles on Meadowbrook from Twelve Mile to Thirteen Mile Road and along the south side of Thirteen Mile Road to M-5. A city memo records a $741,200 federal Transportation Alternatives Program grant awarded through SEMCOG for Phase I. With a local match of $185,300, it funded a construction budget of $926,500, and MDOT administered the federally funded project.

TrailLink lists the Metro Connector Trail at 2.5 miles of asphalt, running south from 13 Mile Road along Meadowbrook past Meadowbrook Elementary and Michigan State University's Tollgate Farm and Education Center, with no dedicated parking. The map line here covers about 2.3 miles along Meadowbrook Road between I-96 and 13 Mile Road. The M-5 Metro Trail continues north and connects to the Michigan Air Line Trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Farmington, 8.6 km from the trail's middle, 72 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303444576878838174604735
Low °F161624344656605951403022
Precipitation, in2.31.82.133.63.33.23.23.42.62.52
Snow, in9.810.64.71.50000002.37.1
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Pontiac sheet (1:62,500); the 1952 Walled Lake sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12405468, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Memorandum: Metro Connector Trail Phase I Grant Award — City of Novi, Department of Public Services · government source · checked Oct 15, 2026
    Supports: Metro Connector Trail name, 10-foot width, east side of Meadowbrook, Phase I 0.7 mile from I-275 pathway terminus south of I-96 to Twelve Mile, Phase II 1.6 miles to Thirteen Mile and along Thirteen Mile to M-5, link between two MDOT-owned trails, first non-motorized crossing of I-96 in Novi, $741,200 TAP grant via SEMCOG, $185,300 local match, $926,500 budget, MDOT administration
  3. MDOT brings Metro Trail to I-275 — Metromode, August 12, 2010 · web · checked Oct 15, 2026
    Supports: MDOT plan to use Meadowbrook and 13 Mile to connect the M-5 path to the I-275 trail, which ended at Meadowbrook in Novi
  4. Metro Connector Trail | Michigan Trails — TrailLink · web · checked Oct 15, 2026
    Supports: 2.5 miles, asphalt, begins at 13 Mile Road and runs south on Meadowbrook, Meadowbrook Elementary, MSU Tollgate Farm and Education Center, no dedicated parking, M-5 Metro Trail connects to the Michigan Air Line Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.