Manhan Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Northampton and Easthampton Town · Hampshire County
Conditions now
Loading the weather near Easthampton…
Forecast by the National Weather Service for Easthampton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Manhan Rail Trail is a rails-to-trails paved recreational trail and non-motorized commuter route located in the lower Connecticut River Valley of Massachusetts in the town of Easthampton. The 6-mile-long (9.7 km) trail, completed in 2003, is part of the larger New Haven and Northampton Canal Greenway that would extend from New Haven, Connecticut, to Northampton, Massachusetts. The trail, named after the Manhan River which it parallels, utilizes the bed of the former New Haven and Northampton Railroad, which served the industrial towns of the lower Pioneer Valley from the mid-19th century until 1992. It begins at the Northampton-Easthampton line near Route 5 and ends at Coleman Road, just over the Southampton town line. A spur connecting the Manhan Rail Trail to the Northampton Rail Trail System opened in 2010. There are plans to extend the route south through Southampton via the Southampton Greenway and eventually to Westfield to connect with the Columbia Greenway Rail Trail.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Trailhead at Coleman Road mile 0 directions to trailhead 1
- Parking at Pleasant Street mile 2.3 directions to trailhead 2
- Parking at Pleasant Street mile 2.4 directions to trailhead 3
- Parking at Pleasant Street mile 2.5 directions to trailhead 4
- Parking at Pleasant Street mile 2.5 directions to trailhead 5
- Parking at Pleasant Street mile 2.5 directions to trailhead 6
- Parking at Pleasant Street mile 2.5 directions to trailhead 7
- Parking at Oneill Street mile 3.3 directions to trailhead 8
- Parking at Easthampton Road mile 4 directions to trailhead 9
- Parking at West Street mile 5.8 directions to trailhead 10
- Parking at West Street mile 5.8 directions to trailhead 11
- Parking at West Street mile 5.9 directions to trailhead 12
- Parking at West Street mile 6 directions to trailhead 13
- Parking at Clark Avenue mile 6 directions to trailhead 14
- Round House Lot mile 6.1 directions to Round House Lot
- Parking at Clark Avenue mile 6.1 directions to trailhead 16
- Parking at New South Street mile 6.1 directions to trailhead 17
- Parking at Crafts Avenue mile 6.2 directions to trailhead 18
- Parking at Round House Plaza mile 6.2 directions to trailhead 19
- Parking at Round House Plaza mile 6.2 directions to trailhead 20
- Parking at Conz Street mile 6.2 directions to trailhead 21
- Parking at Old South Street mile 6.2 directions to trailhead 22
- Parking at Crafts Avenue mile 6.2 directions to trailhead 23
- Parking at Round House Plaza mile 6.2 directions to trailhead 24
- Hampton Avenue Lot mile 6.3 directions to Hampton Avenue Lot
- Old South Street Lot mile 6.3 directions to Old South Street Lot
- Parking at Old South Street mile 6.3 directions to trailhead 27
- Parking at Old South Street mile 6.3 directions to trailhead 28
- Union Station Lot mile 6.5 directions to Union Station Lot
- Strong Avenue Lot mile 6.6 · restrooms directions to Strong Avenue Lot
- Parking at Strong Avenue mile 6.6 · restrooms directions to trailhead 31
- Parking at Hawley Street mile 6.6 directions to trailhead 32
- Parking at Hawley Street mile 6.6 directions to trailhead 33
- Market Square Parking mile 6.7 directions to Market Square Parking
- Spoleto Parking mile 6.7 directions to Spoleto Parking
- Parking at John Mygland Road mile 6.7 directions to trailhead 36
- Parking at John Mygland Road mile 6.7 directions to trailhead 37
- Parking at Merrick Lane mile 6.7 directions to trailhead 38
- Joe's Cafe parking mile 6.8 directions to Joe's Cafe parking
- Market Square Parking mile 6.8 directions to Market Square Parking
- Parking at Merrick Lane mile 6.8 directions to trailhead 41
- Parking at King Street mile 6.8 directions to trailhead 42
- Parking at Merrick Lane mile 6.8 directions to trailhead 43
- Parking at King Street mile 6.8 directions to trailhead 44
- Parking at Merrick Lane mile 6.8 directions to trailhead 45
- Parking at King Street mile 6.8 directions to trailhead 46
- Parking at King Street mile 6.8 directions to trailhead 47
- Parking at Edwards Square mile 6.9 directions to trailhead 48
- Parking at King Street mile 6.9 directions to trailhead 49
- Parking at Market Street mile 6.9 directions to trailhead 50
- Parking at King Street mile 6.9 directions to trailhead 51
- Parking at King Street mile 6.9 directions to trailhead 52
- Parking at King Street mile 6.9 directions to trailhead 53
- Parking at King Street mile 6.9 directions to trailhead 54
- Parking at Edwards Square mile 7 directions to trailhead 55
- Parking at King Street mile 7.2 directions to trailhead 56
- Manhan Rail Trail Parking directions to Manhan Rail Trail Parking
- Parking directions to trailhead 58
- Parking directions to trailhead 59
- Parking directions to trailhead 60
- Parking directions to trailhead 61
- Parking at East Street directions to trailhead 62
- Parking directions to trailhead 63
- Parking at North Street directions to trailhead 64
- Parking at North Street directions to trailhead 65
Plan your visit
- National Recreation TrailDesignated in 2020 National Recreation Trails database
- By trainAmtrak: Northampton, MA (NHT) under 0.1 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Manhan Rail Trail is a paved multi-use trail in Easthampton, Massachusetts, with connections north into Northampton and south into Southampton. It uses the bed of the former New Haven and Northampton Railroad, which served Easthampton's mills; in 1974 the Penn Central, successor to the New Haven, still had more than 4,000 cars a year terminating in the town. The Pioneer Valley Railroad filed in 1992 to abandon about five miles of corridor in Easthampton. Town Meeting voted in 1995 to acquire it, the town had the corridor and the tracks were removed by 1999, and the trail was built in 2003 and 2004, with a grand opening on June 19, 2004.
The City of Easthampton owns the trail, and a Manhan Rail Trail Committee appointed by the mayor manages it; the Friends of the Manhan Rail Trail, a nonprofit, supports its maintenance and improvement. An extension to the Northampton section opened in 2010, and in 2011 the trail was extended south to Coleman Road in Southampton. A spur runs from downtown Easthampton to Route 5. At Northampton the trail meets the west end of the Norwottuck Rail Trail and the Northampton Bikeway. The route mapped here measures 9.5 miles, including the spur and connecting paths in Northampton. The trail was certified as a National Recreation Trail on October 23, 2020.
The main trail is about six miles long. In 2025 Easthampton repaired 109 locations along it, with crack sealing, asphalt and trench repairs and root barriers, paid for by a $330,000 MassTrails grant, a $100,000 city match and a $10,000 donation from the Friends; sections closed during the work. To the south, Southampton bought its part of the former railroad in December 2022 and is designing a 3.1-mile path from Coleman Road to College Highway (Route 10), part of the New Haven and Northampton Canal Greenway, with construction scheduled for July 2028.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 54% of this route as a trail on former railroad right-of-way.
- Shade
47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Amherst, 14.7 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 45 58 70 78 83 82 74 62 50 39 Low °F 14 15 24 34 45 55 60 58 50 39 29 21 Precipitation, in 3.4 2.9 3.5 3.8 3.7 4.5 4.1 4.1 4.6 4.7 3.4 3.9 Snow, in 8.1 11 7.3 1 0 0 0 0 0 0 1.6 7.5 - Wildlife refuges
Passes beside Silvio O. Conte National Fish and Wildlife Refuge.
- On the National Register
- Northampton State Hospital, Northampton · historic district, listed 1994 · nomination file for Northampton State Hospital
- Northampton Downtown Historic District, Northampton · historic district, listed 1976 · nomination file for Northampton Downtown Historic District
- Northampton Downtown Historic District (Boundary Increase), Northampton · historic district, listed 1985 · nomination file for Northampton Downtown Historic District (Boundary Increase)
- Pomeroy Terrace Historic District, Northampton · historic district, listed 2018
- Old maps
USGS topographic maps of the trail's middle go back to the 1885 Northampton sheet (1:62,500); the 1948 Easthampton sheet (1:24,000) shows the area at mid-century. Browse all 22 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Manhan Rail Trail
- FacebookThe Manhan Rail Trail (Facebook)
- RedditSearch Reddit: r/massachusetts
Nearby trails
- Mass Central Rail Trail within 0.2 mi · 70.4 mi, paved
- Russell Street Shared Use Paths 2.5 mi away · 3.8 mi, paved
- Northampton Bikeway 4.1 mi away · 0.7 mi, paved
- Trolley Bed 4.9 mi away · 0.9 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9710651, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Manhan Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q16894590, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Norwottuck Rail Trail — Mass.gov (Department of Conservation and Recreation) · government source · checked Oct 13, 2026 Supports: west end of the Norwottuck Rail Trail connects with the Northampton Bikeway and the Manhan Rail Trail to Easthampton
- Manhan Rail Trail — National Recreation Trails database · organization · checked Oct 13, 2026 Supports: owned by the City of Easthampton, managed by the Manhan Rail Trail Committee appointed by the mayor, paved six-mile path, spur from downtown to Route 5, certified as a National Recreation Trail October 23, 2020
- About Us — Friends of the Manhan Rail Trail · organization · checked Oct 13, 2026 Supports: Friends group is a nonprofit supporting maintenance and improvement, Easthampton mills and railroads, Penn Central over 4,000 cars a year in 1974, Pioneer Valley Railroad abandonment filing 1992 for about five miles, Town Meeting 1995, corridor acquired and tracks removed by 1999, built 2003–2004, grand opening June 19, 2004, Northampton extension 2010, Coleman Road extension 2011
- Manhan Rail Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: former New Haven and Northampton Railroad bed, paved, Northampton, Easthampton and Southampton, Coleman Road southern end
- Around the Hamptons: Repairs planned for Manhan Rail Trail — Daily Hampshire Gazette (April 25, 2025) · press · checked Oct 13, 2026 Supports: six-mile trail, 2025 repairs at 109 locations, crack sealing, trench and asphalt repairs, root barriers, $330,000 MassTrails grant, $100,000 city match, $10,000 Friends donation, sections closed during construction
- Southampton Greenway project gaining steam with new state grant — Daily Hampshire Gazette (October 30, 2025) · press · checked Oct 13, 2026 Supports: Southampton bought its section in December 2022, 3.1-mile path from Coleman Road to College Highway (Route 10), part of the New Haven and Northampton Canal Greenway, construction slated for July 2028
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.


