Marblehead Rail Trail
Rail-trail in Massachusetts
Runs through Marblehead · Essex County
Conditions now
Loading the weather near Marblehead…
Forecast by the National Weather Service for Marblehead · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Community Road mile 0.7 directions to trailhead 1
- Parking at West Shore Drive mile 2.5 directions to trailhead 2
(opens in a new tab) About this trail
The Marblehead Rail Trail is a rail trail in Marblehead, Massachusetts, mapped here as about 3.4 miles; the town counts 4.5 miles of trail within its borders. It follows former Eastern Railroad corridors: a branch line to Marblehead opened on December 10, 1839, and a Swampscott branch was added in 1873 to allow direct rides between Marblehead and Boston. Rail service ended in the late 1950s, and the corridor has been used for walking and biking since. The Marblehead Conservancy describes the rail bed as a utility corridor that also serves pedestrians and bicyclists. The town's Community Development and Planning Department leads work on the trail.
On a map the trail forms a Y lying on its side. From the junction near Bessom Street and Round House Road, one branch runs to Lafayette Street (Route 114) at the Salem line, where it meets the 1.8-mile Salem Bike Path; the other runs past Pleasant Street and Marblehead High School to Seaview Avenue at the Swampscott town limits. The Salem branch passes the Hawthorn Pond, Wyman Woods and Lead Mills conservation areas; the trail has eight street crossings and abuts four conservation areas in all.
TrailLink lists asphalt, dirt, gravel and sand surfaces. Under a Rail Trail Master Plan to improve the whole corridor, the town plans to widen the path to 11 feet for two-way bicycle traffic, improve drainage and formalize neighborhood connections. A 650-foot section between Smith and Pleasant streets, widened to 11 feet, resurfaced with crushed aggregate and made accessible, was celebrated with a ribbon cutting on August 26, 2025; it cost $143,395, paid with a $60,000 MassTrails grant and federal ARPA funds, of which the town has allocated $1.4 million to the trail. Design of the Swampscott and Salem branches was expected to be complete by fall 2027.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Marblehead, 1.3 km from the trail's middle, 16 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 38 44 55 65 74 80 79 72 61 51 42 Low °F 18 20 26 36 45 54 61 60 53 42 33 24 Precipitation, in 3.8 3.5 4.7 4.3 3.5 4.1 3.5 3.2 3.6 5 4.2 4.7 Snow, in 13.3 8.5 7.5 1.5 0 0 0 0 0 0.1 0.8 7.4 - On the National Register
- Seaside Park, Marblehead · site, listed 2011 · nomination file for Seaside Park
- Old maps
USGS topographic maps of the trail's middle go back to the 1892 Boston Bay sheet (1:62,500); the 1956 Marblehead South sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Nearby trails
- Mayor Anthony Salvo Bike Path within 0.2 mi · 1.7 mi, paved
- Northern Strand Community Trail 3.2 mi away · 11.7 mi, paved
- Independence Greenway 4.0 mi away · 4.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eastern Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: Marblehead branch opened December 10, 1839; Marblehead Rail Trail among converted sections
- Marblehead residents give feedback at Rail Trail site walk — Marblehead Current (August 23, 2025) · organization · checked Oct 13, 2026 Supports: Swampscott branch added 1873, rail service ended late 1950s, walking and biking since, Community Development and Planning Department, planned 11-foot widening for two-way bicycle traffic, drainage, neighborhood connections
- Rail Trail ribbon cutting marks milestone in years-long project — Marblehead Current (September 2, 2025) · organization · checked Oct 13, 2026 Supports: 4.5 miles in town, master plan, 650-foot Smith–Pleasant section, 11 feet, crushed aggregate, ADA, August 26 ribbon cutting, $143,395 cost, $60,000 MassTrails grant and ARPA, $1.4 million ARPA allocation, branch names and limits, eight street crossings, four conservation areas, design by fall 2027
- Wyman Woods and Harbor Glade — Marblehead Conservancy · organization · checked Oct 13, 2026 Supports: rail bed as a utility corridor serving pedestrians and bicyclists, passes through Wyman Woods and Lead Mills conservation areas
- Marblehead Rail-Trail — TrailLink · web · checked Oct 13, 2026 Supports: Y shape, endpoints at Lafayette St, Bessom St & Round House Rd and Seaview Ave, Salem Bike Path connection (1.8 miles), Pleasant Street and Marblehead High School, Hawthorn Pond conservation area, surfaces
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
