Marion Road Trail
Greenway in Minnesota
Runs through Rochester · Olmsted County
Conditions now
Loading the weather near Rochester…
Forecast by the National Weather Service for Rochester · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 3 1/2 Street Southeast mile 0 directions to trailhead 1
- Parking at 8 1/2 Street Southeast mile 0.3 directions to trailhead 2
- Parking at 15th Avenue Southeast mile 0.5 directions to trailhead 3
- Parking at 15th Avenue Southeast mile 0.6 directions to trailhead 4
- Parking at 11th Street Southeast mile 0.7 directions to trailhead 5
- Parking at North Frontage Road mile 0.7 directions to trailhead 6
- Parking at North Frontage Road mile 0.7 directions to trailhead 7
- Parking at 12th Street Southeast mile 0.8 directions to trailhead 8
- Parking at Marion Road Southeast mile 1.5 directions to trailhead 9
- Parking at Park Lane Southeast mile 1.6 directions to trailhead 10
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Marion Road Trail is a paved sidepath along Marion Road Southeast in Rochester, Minnesota. TrailLink, which calls it the Marion Road Bike Path, describes an asphalt path of 1.5 miles between 12th Street SE and 20th Street SE, open to bicycling, inline skating and walking; this record maps about 2.3 miles, from near 4th Street SE south to 20th Street SE.
The path passes the Bear Creek park corridor. The City of Rochester's park and trail map for Bear Creek shows Marion Road running past Bear Creek Park and McQuillan Field, both with parking, and a 3.1-mile trail loop along Bear Creek and 11th Avenue SE. TrailLink gives parking at the northern end of the bike path in Bear Creek Park, 1237 Marion Road SE, and says that together with the Bear Creek Trail and the path along 20th Street the Marion Road path forms a loop for off-road travel between Smetka Park and Bear Creek Park. TrailLink describes the roadside stretch as less scenic than the wooded Bear Creek corridor but an important connection for residents.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Byron 4north, 18.8 km from the trail's middle, 7 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 23 27 40 55 68 78 81 79 72 58 42 28 Low °F 4 6 20 32 44 54 58 55 47 34 23 11 Precipitation, in 1 1.1 2.1 3.6 4.3 5.3 4.6 4.8 3.5 2.4 1.9 1.3 Snow, in 8.8 9.6 8.8 1.2 0.6 0 0 0 0 0.1 2.8 12.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1935 Rochester sheet (1:48,000); the 1953 Saint Paul sheet (1:250,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Bear Creek Trail within 0.2 mi · 3.6 mi, paved
- Civic Center Trail 0.4 mi away · 2.6 mi, paved
- Zumbro River Trail 0.7 mi away · 2.2 mi, paved
- John Wellner Memorial Trail 0.9 mi away · 3.3 mi, paved
- Viola Road Path 1.2 mi away · 2.1 mi, paved
- Zumbro River Trail South 1.3 mi away · 3.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Bear Creek (L12) - Rochester Park & Trail System map, City of Rochester · government source · checked Oct 15, 2026 Supports: Marion Road past Bear Creek Park and McQuillan Field, parking at both, 3.1-mile trail loop along Bear Creek and 11th Avenue SE
- Marion Road Bike Path - TrailLink · web · checked Oct 15, 2026 Supports: name Marion Road Bike Path, 1.5 miles, asphalt, 12th St. SE to 20th St. SE, biking, inline skating and walking, parking at Bear Creek Park at 1237 Marion Road SE, loop with the Bear Creek Trail and 20th Street path between Smetka Park and Bear Creek Park, less scenic than the Bear Creek corridor
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.