States › Michigan

Marquette Greenway

Greenway in Michigan · OpenStreetMap relation

Runs through Grand Beach, New Buffalo Township and New Buffalo · Berrien County

Conditions now

Loading the weather near Grand Beach…

Forecast by the National Weather Service for Grand Beach · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.6 mi 4.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Merchant Street mile 2.5 directions to trailhead 1

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

New Buffalo, along the trail (opens in a new tab)
New Buffalo, along the trail · Photo: Kevin Dooley · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

This record is the Michigan section of the Marquette Greenway, a planned shared-use path of about 58 miles along the south shore of Lake Michigan from Calumet Park in Chicago to downtown New Buffalo, Michigan, connecting three states. Earlier sections were built in Illinois and Indiana; this is the first section completed in Michigan. The Southwest Michigan Planning Commission leads funding and construction of the Michigan portion, with the City of New Buffalo, New Buffalo Township, the Berrien County Road Department, Grand Beach Village, the Michigan Department of Transportation and Friends of Berrien County Trails. The route mapped here is about 2.6 miles.

Volunteers started the Michigan project in 2015. The first phase, a 3-mile paved trail in New Buffalo and New Buffalo Township, was built over about a year beginning in spring 2024 and opened with a ribbon-cutting on April 25, 2025. The 10-foot-wide path follows the Amtrak tracks along part of U.S. 12 south of New Buffalo, on an easement from Amtrak secured for New Buffalo Township, and includes a boardwalk. The trailhead at Smith and Mechanic streets in downtown New Buffalo has parking, a picnic area and a bike repair station. Funding came from the Pokagon Fund, the city and township, MDOT's federal Transportation Alternatives Program, the Michigan Natural Resources Trust Fund, USDA Rural Development, the Berrien Community Foundation and more than 200 individuals; Friends of Berrien County Trails raised over $400,000.

In April 2025 the second Michigan phase, along Grand Beach Road to the Indiana state line, was expected to be finished in 2026. Work also continues on a connection north from New Buffalo toward the Red Arrow Trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Laporte, 19.2 km from the trail's middle, 59 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313546597079828074624836
Low °F172029395060646355443324
Precipitation, in32.52.73.84.34.444.23.44.13.22.9
Snow, in23167.11.1000000.2413.8
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Chicago sheet (1:250,000); the 1957 Chicago sheet (1:250,000) shows the area at mid-century. Browse all 4 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19785699, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Marquette Greenway – SWMPC (Southwest Michigan Planning Commission) · organization · checked Oct 15, 2026
    Supports: SWMPC leads funding and construction of the Michigan portion; 58-mile greenway from Calumet Park in Chicago to downtown New Buffalo through three states; project team; Pokagon Fund as first grant provider; Friends of Berrien County Trails raised over $400,000
  3. First Michigan section of Marquette Greenway completed – Rural Innovation Exchange (Second Wave Media), April 17, 2025 · web · checked Oct 15, 2026
    Supports: first Michigan section in New Buffalo and New Buffalo Township finished; ribbon-cutting April 25, 2025; earlier sections in Illinois and Indiana; 3-mile paved trail; trailhead at Smith and Mechanic streets with parking, picnic area, bike repair station; volunteers started in 2015; 10-foot-wide path along the Amtrak tracks beside U.S. 12 south of New Buffalo on an Amtrak easement; boardwalk; funders; year-long construction begun the previous spring; Phase II along Grand Beach Road to the Indiana line expected in 2026; connection north toward the Red Arrow Trail
  4. Relation: Marquette Greenway (19785699) - OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped route length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.