States › California

Marsh Creek Trail

Greenway in California · OpenStreetMap relation

Runs through Oakley and Brentwood · Contra Costa County

Conditions now

Loading the weather near Brentwood…

Forecast by the National Weather Service for Brentwood · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
9.1 mi 14.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Sand Creek Road mile 3.3 directions to trailhead 1
  2. Parking at Creekside Way mile 6.3 directions to trailhead 2
  3. Parking at East Cypress Road mile 7.1 directions to trailhead 3
bigbreak-20090514-ipjones-26 (opens in a new tab)
bigbreak-20090514-ipjones-26 · Photo: East Bay Regional Park District · Public domain (California public record) · Flickr

About this trail

The Marsh Creek Trail, which the East Bay Regional Park District calls the Marsh Creek Regional Trail, is a paved multi-use trail in easternmost Contra Costa County that winds along Marsh Creek through farmland between Oakley and Brentwood. The district manages it. It is a creekside trail, not a rail-trail. When completed it is planned to be 14 miles long, linking the Delta with the wooded foothills of Morgan Territory Regional Preserve and Round Valley Regional Preserve east of Mount Diablo.

The district's figures for the existing trail differ. Its trail page gives about 6.5 miles from Creekside Park in Brentwood to the Delta shore at Big Break, while its trail map describes a trail of more than 8 miles from Big Break south to Concord Avenue in Brentwood. This record, named after an OpenStreetMap route relation, maps about 9 miles including short side connections, from Big Break in Oakley south through Brentwood. The district lists the Cypress Staging Area as a trailhead, and community parks and greenbelts along the way give access to the trail.

The trail is flat and paved, and the district says it presents no slope difficulties for wheelchair users. Bicycles and e-bikes are allowed, along with dogs and horses. The trail is open from 5 a.m. to 10 p.m. unless otherwise posted.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Tracy Pumping Plt, 20.3 km from the trail's middle, 2 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566267738088939289796657
Low °F404447505559626260544640
Precipitation, in2.52.31.60.80.50.1000.10.71.32.4
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Brentwood sheet (1:31,680); the 1954 Brentwood sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Jul 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9710831, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Marsh Creek Trail — East Bay Regional Park District · organization · checked Oct 15, 2026
    Supports: paved multi-use trail about 6.5 miles from Creekside Park in Brentwood to the Delta shore at Big Break, planned 14 miles linking to Morgan Territory and Round Valley, flat with no slope difficulties for wheelchairs, bikes and e-bikes, dogs and horses allowed, Cypress Staging Area, hours 5 a.m. to 10 p.m.
  3. Delta de Anza and Marsh Creek Regional (South) Trails Map — East Bay Regional Park District (PDF, revised 2025) · organization · checked Oct 15, 2026
    Supports: trail in easternmost Contra Costa County along Marsh Creek through farmland, more than 8 miles from Big Break south to Concord Avenue in Brentwood, 14 miles when completed connecting the Delta with Morgan Territory and Round Valley east of Mt. Diablo State Park, access from community parks and greenbelts, multi-use paved trail for hikers, horses and bikes
  4. Marsh Creek Trail (relation 9710831) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: record name and mapped extent from Big Break in Oakley south through Brentwood

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.