Mascoma River Greenway
Rail-trail in New Hampshire · OpenStreetMap relation
Runs through Lebanon · Grafton County
Conditions now
Loading the weather near Lebanon…
Forecast by the National Weather Service for Lebanon · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Miracle Mile mile 0.2 directions to trailhead 1
- Parking mile 0.4 directions to trailhead 2
- Parking mile 0.6 directions to trailhead 3
- Parking at Mascoma Street mile 1.5 directions to trailhead 4
- Parking at Mechanic Street mile 1.6 directions to trailhead 5
- Parking at Alice Peck Day Drive mile 1.6 directions to trailhead 6
- Parking at Mascoma Street mile 1.6 directions to trailhead 7
- Parking at Mascoma Street mile 1.6 directions to trailhead 8
- Parking at Mechanic Street mile 1.7 directions to trailhead 9
- Parking at Mechanic Street mile 2.1 directions to trailhead 10
- Parking at Hanover Street mile 2.3 directions to trailhead 11
- Parking at Mascoma Street mile 2.3 directions to trailhead 12
- Parking at Taylor Street mile 2.4 directions to trailhead 13
- Parking at Hanover Street mile 2.4 directions to trailhead 14
- Parking at Court Street mile 2.4 directions to trailhead 15
- Parking at Court Street mile 2.4 directions to trailhead 16
Plan your visit
- By trainAmtrak: White River Junction, VT (WRJ) 1.4 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Mascoma River Greenway is a paved multi-use path of about 2.4 miles in Lebanon, New Hampshire, on a former railroad corridor along the Mascoma River between downtown Lebanon and West Lebanon. It begins where the 57.6-mile Northern Rail Trail ends in downtown Lebanon and carries that route west toward West Lebanon. The corridor belongs to the State of New Hampshire. It was built by the Northern Railroad, which opened from Concord to West Lebanon in 1847, with Daniel Webster speaking at the ribbon-cutting in Lebanon, and which became part of the Boston and Maine system by 1890.
Volunteers led by Frank Gould began work after the state offered use of the east-west railroad bed and, working with the city's Recreation and Parks department, raised more than $2.3 million for construction and paving. The 2.3-mile trail designed by Stantec was completed in 2018 and runs from the intersection of Mascoma, Mechanic and High streets downtown to Glen Road near Riverside Park in West Lebanon, ending about 800 feet short of the top of Glen Road. It passes through a long tunnel under downtown decorated with murals by local artists and crosses the Mascoma River on its own bridge.
The Lebanon Recreation and Parks Department manages the path, which is wide and level and suitable for walking, cycling and wheelchairs. About a third of the way along it crosses a busy road without traffic signals. Parking is on either side of the overpass bridge by Slayton Hill Road, off Mechanic and Mascoma streets, and behind City Hall downtown. In June 2026 the city was negotiating the design of a $2.9 million extension adding 1.3 miles of paved trail to Route 12A, mostly funded by a state transportation grant, with construction expected in 2028.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Mascoma River Greenway and Northern Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
61% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lebanon Municipal Airport, 2.9 km from the trail's middle, 26 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 34 43 57 70 78 83 81 73 60 47 36 Low °F 9 11 21 32 44 52 58 56 49 37 28 18 Precipitation, in 2.3 2.1 2.7 3 3.3 3.8 4 3.6 3.4 4 3 2.8 - On the National Register
- Colburn Park Historic District, Lebanon · historic district, listed 1986 · nomination file for Colburn Park Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1906 Hanover sheet (1:62,500); the 1959 Hanover sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationThe Mascoma River Greenway (active 2026)
- Agency noticesLebanon Recreation & Parks Department
Nearby trails
- Northern Rail Trail 0.2 mi away · 58.0 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9728456, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Northern Railroad (New Hampshire) — Wikipedia · organization · checked Oct 13, 2026 Supports: opened Concord to West Lebanon in 1847, Daniel Webster at the Lebanon ribbon-cutting, part of the Boston and Maine by 1890
- Lebanon plans to extend Mascoma River Greenway to Route 12A — Valley News (June 23, 2026) · press · checked Oct 13, 2026 Supports: 2.5-mile paved greenway ending about 800 feet short of the top of Glen Road, state ownership of the corridor, Stantec design, $2.9 million 1.3-mile extension to Route 12A, NHDOT grant, construction likely 2028
- NH to hold hearing in Lebanon on 10-Year transportation priorities — Valley News (September 4, 2023) · press · checked Oct 13, 2026 Supports: 2.3-mile greenway completed in 2018 from West Lebanon (Glen Road near Riverside Park) to the Mascoma, Mechanic and High streets intersection
- Lebanon Seeks Input on Greenway Plans — Valley News (March 28, 2016) · press · checked Oct 13, 2026 Supports: Frank Gould and volunteers, state offer of the east-west railroad bed, work with Recreation and Parks, more than $2.3 million raised, trail begins where the Northern Rail Trail ends
- Mascoma River Greenway — Trail Finder · web · checked Oct 13, 2026 Supports: paved, wide and level former railway, 57.6-mile Northern Rail Trail, mural tunnel, river bridge, busy road crossing, parking by the Slayton Hill overpass and behind City Hall, Lebanon Recreation & Parks as trail manager
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.