Massachusetts Central Rail Trail
Rail-trail in Massachusetts
Runs through Sterling · Worcester County
Conditions now
Loading the weather near South Lancaster…
Forecast by the National Weather Service for South Lancaster · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Gates Road mile 0 directions to trailhead 1
- Parking at George Hannum Street directions to trailhead 2
(opens in a new tab) About this trail
This record maps about 1.8 miles of the Mass Central Rail Trail, nearly all of it the Sterling Spur in Sterling, Massachusetts: a crushed-stone path of about 1.6 miles that runs south from the shared parking lot of the Cider Mill Shops, between West Waushacum Pond and The Quag, to Gates Road, where parking is across the road. The spur follows the Fitchburg and Worcester rail line, opened in 1850, whose causeway across West Waushacum Lake created The Quag. A gap of about 3.5 miles separates it from the next section in West Boylston. The record also includes about 0.1 mile in Ware. The Mass Central Rail Trail is planned to run 104 miles from Northampton to Boston.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
75% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fitchburg Municipal Airport, 15.5 km from the trail's middle, 31 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 45 58 70 78 83 82 74 62 50 40 Low °F 16 17 25 35 46 56 62 60 51 40 30 22 Precipitation, in 2.6 2.8 3.8 3.8 3.6 4.1 3.5 3.4 4 4.5 3.6 3.7 - On the National Register
- Belchertown State School, Belchertown · historic district, listed 1994 · nomination file for Belchertown State School
- Sterling Center Historic District, Sterling · historic district, listed 1988 · nomination file for Sterling Center Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1885 Worcester sheet (1:62,500); the 1950 Sterling sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMass Central Rail Trail
- Trail organizationWachusett Greenways
Nearby trails
- Mass Central Rail Trail within 0.2 mi · 70.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Railroad Driven History of the MCRT's Sterling Spur — Wachusett Greenways Newsletter, July 2015 · organization · checked Oct 13, 2026 Supports: Sterling section of the MCRT and its name Sterling Spur, Fitchburg and Worcester line opened 1850, causeway across West Waushacum Lake creating the Quag, northern parking at the Sterling Cider Mill
- Home — MassCentralRailTrail · organization · checked Oct 13, 2026 Supports: MCRT planned at 104 miles from Northampton to Boston
- Mass Central Rail Trail — TrailLink · web · checked Oct 13, 2026 Supports: crushed-stone surface, start at the Cider Mill Shops lot, 1.3 + 0.3 miles to Gates Road, berm between West Waushacum Pond and The Quag, parking across Gates Road, 3.5-mile gap to the West Boylston section
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.