States › Texas

Maxwell Creek Trail

Greenway in Texas

Runs through Richardson, Plano and Murphy · Collin County

Conditions now

Loading the weather near Plano…

Forecast by the National Weather Service for Plano · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Maxwell Creek Trail (opens in a new tab)
Photo: ndelregno · CC BY-SA 4.0 · Mapillary

About this trail

Maxwell Creek Trail is the name OpenStreetMap gives to an off-street path of about 2.3 miles in Collin County, Texas, where the cities of Richardson, Plano and Murphy meet. The path was first traced on the map from a 2007 road import and was redrawn as a bicycle and foot path in 2019; a mapper added the name Maxwell Creek Trail in December 2025. No city page that could be read uses that name for this stretch.

The record's map line runs east to west in two pieces, mostly beneath a 138-kilovolt power line through residential neighborhoods. Starting in Richardson, it passes through a Plano neighborhood, crosses Brand Road and South Murphy Road, and reaches South Maxwell Creek Road in Murphy. OpenStreetMap lists it as a cycleway that is also open to walkers, without a surface type.

The City of Murphy uses the same name for trail work near the line's eastern end. Between August and November 2024 it built 700 feet of 10-foot-wide concrete and asphalt trail along South Maxwell Creek Road, with a low-water crossing over a double 8-by-8-foot box culvert, at an estimated cost of $520,000. The city registered that project with the Texas Department of Licensing and Regulation under the facility name Maxwell Creek Trail, also known as the Bunny Run Trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lavon Dam, 12.6 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545865738088929387776556
Low °F343846536370737366554536
Precipitation, in2.62.73.53.74.74.11.92.13.14.43.43.5
Snow, in000000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1924 Mc Kinney 4-d sheet (1:48,000); the 1959 Wylie sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Maxwell Creek Trail (opens in a new tab)
  1. 360° view 1 of 3, photo by ndelregno
  2. 360° view 2 of 3, photo by ndelregno
  3. 360° view 3 of 3, photo by ndelregno
360° panorama · Photo: ndelregno · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Murphy Sidewalk Project T-1 (TABS2024021162) — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: facility name Maxwell Creek Trail aka Bunny Run Trail, South Maxwell Creek Road, owner City of Murphy, August to November 2024, 700 LF of 10-foot concrete and asphalt trail, low-water crossing with double 8x8 box culvert, $520,000 estimate
  3. Maxwell Creek Trail (way 15176056) history — OpenStreetMap · web · checked Oct 15, 2026
    Supports: 2007 TIGER road import, cycleway open to walkers since 2019, name added December 2025, no surface tag, crosses Brand Road and South Murphy Road
  4. Maxwell Creek Trail (way 1457174804) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: eastern piece reaching South Maxwell Creek Road in Murphy
  5. Power line (way 1362027683) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: 138 kV power line along the path

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.