States › Colorado

McCulloch Trail

Greenway in Colorado

Runs through Pueblo West · Pueblo County

Conditions now

Loading the weather near Pueblo West…

Forecast by the National Weather Service for Pueblo West · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.0 mi 4.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North McCulloch Boulevard mile 0 directions to trailhead 1
  2. Parking at North McCulloch Boulevard mile 2.8 directions to trailhead 2
Pueblo West, along the trail (opens in a new tab)
Pueblo West, along the trail · Photo: Jeffrey Beall · CC BY 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The McCulloch Trail is a paved path of about 3 miles in Pueblo West, Colorado, running along North McCulloch Boulevard. Its name and route come from OpenStreetMap, which maps it as an asphalt cycleway open to walkers; no manager page found names it.

The trail record on this site runs about 3 miles from southwest to northeast beside the boulevard, and OpenStreetMap notes roadside parking along North McCulloch Boulevard at both ends. It is a single mapped path rather than a network, and no source found gives its construction date, its manager or winter maintenance.

Pueblo West is served by the Pueblo West Metropolitan District, whose officials said in 2025 that state and federal funding had brought the district's network to 28 miles of trails, with further projects drawn from a parks master plan approved in 2024.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pueblo Rsvr, 9.3 km from the trail's middle, 52 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F474959667687929082695647
Low °F182028364656626051382719
Precipitation, in0.30.30.91.71.71.21.92.10.80.80.50.3
Snow, in2.42.51.90.6000001.433
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Pueblo sheet (1:125,000); the 1961 Northwest Pueblo sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. OpenStreetMap way named McCulloch Trail · web · checked Oct 17, 2026
    Supports: name, asphalt cycleway, foot access, route along North McCulloch Boulevard, parking at both ends
  3. Civil Municipal, November 2025, p. 151 — Business View Magazine · web · checked Oct 17, 2026
    Supports: Pueblo West district at 28 miles of trails with state and federal funding, parks master plan approved in 2024

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.