States › Illinois

MCT Silver Creek Trail

Greenway in Illinois

Runs through Troy · Madison County

Conditions now

Loading the weather near Troy…

Forecast by the National Weather Service for Troy · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.6 mi 2.5 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West US Highway 40 mile 0.2 directions to trailhead 1
MCT Silver Creek Trail drawn on the 1954 USGS topographic map of Collinsville, Illinois
Then: the 1954 USGS Collinsville sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The MCT Silver Creek Trail is a Madison County Transit trail in Troy, Illinois, part of the MCT Trails system, the more than 137 miles of bikeways the transit district builds and maintains in Madison County. MCT lists it as 1.4 miles of asphalt running parallel to US 40 between Sherbourne Avenue and Formosa Road. It starts at the MCT Troy Park & Ride lot at Main Street and US 40, which serves as its parking, and connects to the City of Troy's shared-use path network, giving access to Tri-Township Park.

The trail is being built in phases. The second, a 4,300-foot extension from Spring Valley Road to Formosa Road, opened with a ribbon cutting on October 8, 2021; an Illinois Department of Natural Resources bicycle path grant paid for it, Oates Associates designed it and Keller Construction built it. MCT said then that it hoped eventually to connect the trail to the MCT Goshen Trail, the spine of its network. An MCT capital projects summary posted in December 2022 lists a signature trail bridge over US 40 to connect Troy to the MCT Trails system and an extension of the trail from Troy to St. Jacob and Highland.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Belleville Siu Rsch, 22.4 km from the trail's middle, 35 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434959717987908983735846
Low °F242836465664686557473728
Precipitation, in2.62.23.44.954.643.93.43.13.62.6
Snow, in3.43.3100000000.62.9
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Belleville sheet (1:62,500); the 1954 Collinsville sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. MCT Silver Creek Trail — MCT Trails (Madison County Transit) · organization · checked Oct 17, 2026
    Supports: 1.4 miles, asphalt; parallel to US 40 between Sherbourne Avenue and Formosa Road in Troy; starts at the MCT Troy Park & Ride lot; parking at the Park & Ride; Tri-Township Park; connects to Troy's shared use path network
  3. Local officials celebrate MCT Silver Creek Trail extension — Madison County Transit press release (October 8, 2021) · organization · checked Oct 17, 2026
    Supports: 4,300-foot extension from Spring Valley Road to Formosa Road; second phase of a multiphase project beginning at the Troy Park & Ride at Main Street and US 40; ribbon cutting October 8, 2021; IDNR State of Illinois Bicycle Path Grant; Oates Associates designer; Keller Construction contractor; hope to connect to the MCT Goshen Trail, the spine of the network; MCT maintains more than 137 miles of bikeways
  4. MCT Trails Capital Projects — Madison County Transit (December 2022) · organization · checked Oct 17, 2026
    Supports: signature trail bridge over US 40 to connect Troy to the MCT Trails system; extension of the MCT Silver Creek Trail from Troy to St. Jacob and Highland
  5. OpenStreetMap way 1082970632 (MCT Silver Creek Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: cycleway designated for bicycles and pedestrians; mapped length about 1.55 miles (trail record, 2.5 km)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.