Meadow River Trail
Rail-trail in West Virginia · OpenStreetMap relation
In Fayette and Greenbrier counties
Conditions now
Loading the weather near Hico…
Forecast by the National Weather Service for Hico · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Trail Parking mile 9.5 directions to Trail Parking
- Nallen Trailhead Parking mile 12.3 directions to Nallen Trailhead Parking
(opens in a new tab) About this trail
The Meadow River Trail, also called the Meadow River Rail Trail, is a crushed-stone rail-trail along the Meadow River in Fayette and Greenbrier counties, West Virginia, between the community of Nallen and the town of Rainelle. It follows a CSX spur line built in 1907 to serve the Meadow River Lumber Company. CSX abandoned the line in 2008, and the Fayette and Greenbrier County Commissions bought the corridor, about 24 miles from Rainelle to Glade Creek below Nallen, on terms that limit it to nonmotorized trail use. Matt Ford of the Greenbrier Environmental Group in Lewisburg coordinates the project.
Construction of Phase I began in 2014. The June 2016 flood washed out trail and half of the Russellville bridge, and the state Department of Environmental Protection's abandoned mine program later granted $1.8 million through the Greenbrier County Commission for a section starting in Rainelle. The first 9 miles, from Nallen to the Meadow River Bridge, opened in October 2023. Phase III added about 9 miles to reach Rainelle, and in June 2026 WOAY reported the Rainelle trailhead open, with the trail running more than 18 miles between Nallen and Rainelle.
From the Nallen trailhead off WV 41, the trail runs along the western border of Fayette County, crosses the Russellville Bridge into Greenbrier County, and follows the river's east bank to Snake Island Road in Rainelle. The largest parking areas are at Nallen and Rainelle, with smaller ones at the Russellville trailhead and on the Fayette County side of the Russellville Bridge. The surface is gravel at railroad grade; there are no restrooms or campsites, cell service is limited between trailheads, and land beyond the 66-foot corridor is private. An extension downstream from Nallen toward the Gauley River National Recreation Area is planned. This record maps 16.6 miles from Nallen upriver; the Rainelle end is mapped separately as the Meadow River Rail Trail.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as an out-of-service rail line, naming the line New River and Sewell Valley.
- Shade
79% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mt Nebo 1 S, 13.4 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 43 50 64 72 78 81 80 75 64 52 43 Low °F 19 22 27 37 46 54 58 57 50 38 30 24 Precipitation, in 4.2 3.6 4.9 4.8 5.6 5.7 6.1 4.6 4.3 3.7 3.6 4.2 Snow, in 21.1 14.8 12.8 3.2 0 0 0 0 0 2 1.8 11.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Nicholas sheet (1:125,000); the 1969 Winona sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Feb 2024 to Aug 2024
- Visiting soon. Hiking/biking recommendations Summerville area r/WestVirginia · Aug 2024 · 6 comments
- Easy hiking trails in southern WV? r/WestVirginia · Feb 2024 · 4 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMeadow River Rail Trail
- FacebookMeadow River Rail Trail (Facebook)
- RedditSearch Reddit: r/WestVirginia
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10270923, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Meadow River Rail-Trail — West Virginia Rails-to-Trails Council · organization · checked Oct 14, 2026 Supports: former CSX spur built in 1907 serving a lumber company; Fayette and Greenbrier counties; route from Nallen along western border of Fayette County, across Russellville Bridge into Greenbrier County, east bank to Snake Island Road; trestle is one of two Meadow River crossings; Nallen trailhead reached via WV 41; trail manager contact Matt Ford, Greenbrier Environmental Group, Lewisburg
- Meadow River Rail Trail Opens — West Virginia Rails-to-Trails Council · organization · checked Oct 14, 2026 Supports: 9 miles from Nallen to the Meadow River Bridge opened; next phase to Rainelle
- MRRT History — Meadow River Rail Trail · web · checked Oct 14, 2026 Supports: Meadow River Lumber Company using river and railroad; CSX abandonment in 2008; county commissions' purchase; Phase I construction from 2014; 2016 flood washout; Phase I opening October 13, 2023; transition to Phase III toward Rainelle
- Frequently Asked Questions — Meadow River Rail Trail · web · checked Oct 14, 2026 Supports: county commissions own about 24 miles from Rainelle to Glade Creek downstream of Nallen; land-banking purchase limited to nonmotorized trail use; trail complete between Rainelle and Nallen; plans to extend downstream from Nallen; gravel/aggregate surface at railroad grade; no restrooms or camping; parking at Nallen, Rainelle, Russellville trailhead and Fayette side of Russellville Bridge; limited cell service; 66-foot corridor with private land beyond
- MRRT Plans and Partnerships — Meadow River Rail Trail · web · checked Oct 14, 2026 Supports: Phase III adds 9 miles to connect to Rainelle; potential expansion to the Gauley River National Recreation Area
- Local Walking Trail Continuing Path To Completion — West Virginia Daily News · web · checked Oct 14, 2026 Supports: 2016 flood took out half of the Russellville bridge; Matt Ford as project coordinator; $1.8 million DEP Abandoned Mine Reclamation grant through the Greenbrier County Commission
- Meadow River Rail Trail Has Renewed Momentum — West Virginia Daily News · web · checked Oct 14, 2026 Supports: $1.8 million DEP abandoned mine grant to the Greenbrier County Commission for a section starting in Rainelle; Matt Ford, president of the Greenbrier Environmental Group and project coordinator
- Rainelle trailhead on the Meadow River Rail Trail is now open — WOAY-TV · web · checked Oct 14, 2026 Supports: Rainelle trailhead open (published June 12, 2026); trail connects Nallen and Rainelle trailheads over more than 18 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.