Metropolitan Branch Trail
Rail-trail in District of Columbia · OpenStreetMap relation
Runs through Washington
Conditions now
Loading the weather near Washington…
Forecast by the National Weather Service for Washington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Metropolitan Branch Trail is a partially-built American rail trail between the transit center in Silver Spring, Maryland, and Union Station in the District of Columbia. When completed, it will run for 8 miles (13 km): one in Maryland and seven in Washington, D.C. The trail parallels Metrorail and CSX tracks along a right-of-way opened in 1873 as the Baltimore and Ohio Railroad (B&O)'s Metropolitan Branch.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Capitol NE Court mile 0 directions to trailhead 1
- Parking at F Street Northeast mile 0 · restrooms · water directions to trailhead 2
- Parking at F Street Northeast mile 0.1 directions to trailhead 3
- Parking at Union Station Drive Northeast mile 0.1 · restrooms directions to trailhead 4
- Parking at K Street Northeast mile 0.4 directions to trailhead 5
- Parking at K Street Northeast mile 0.4 directions to trailhead 6
- Parking at L Street Northeast mile 0.5 directions to trailhead 7
- Parking at M Street Northeast mile 0.6 directions to trailhead 8
- Parking at R Street Northeast mile 1.1 · water directions to trailhead 9
- Parking at Randolph Place Northeast mile 1.2 · water directions to trailhead 10
- Parking at Randolph Place Northeast mile 1.2 · water directions to trailhead 11
- Parking at Randolph Place Northeast mile 1.2 · water directions to trailhead 12
- Parking at 5th Street Northeast mile 1.4 directions to trailhead 13
- Parking at 5th Street Northeast mile 1.5 directions to trailhead 14
- Parking at 5th Street Northeast mile 1.5 directions to trailhead 15
- Parking at 5th Street Northeast mile 1.5 directions to trailhead 16
- Parking at V Street Northeast mile 1.6 directions to trailhead 17
- Parking at V Street Northeast mile 1.6 directions to trailhead 18
- Parking at W Street Northeast mile 1.7 directions to trailhead 19
- Parking at Washington Place Northeast mile 1.7 directions to trailhead 20
- Parking at Rhode Island Avenue Northeast mile 1.7 directions to trailhead 21
- Parking at Rhode Island Avenue Northeast mile 1.8 directions to trailhead 22
- Parking at Rhode Island Avenue Northeast mile 1.8 directions to trailhead 23
- Parking at Rhode Island Avenue Northeast mile 1.9 · water directions to trailhead 24
- Parking at Channing Place Northeast mile 1.9 · water directions to trailhead 25
- Parking at Channing Place Northeast mile 1.9 · water directions to trailhead 26
- Parking at Edgewood Street Northeast mile 2 directions to trailhead 27
- Parking at Reed Street Northeast mile 2 directions to trailhead 28
- Parking at Franklin Street Northeast mile 2.1 directions to trailhead 29
- Parking at Edgewood Street Northeast mile 2.1 directions to trailhead 30
- Parking at Reed Street Northeast mile 2.1 directions to trailhead 31
- Parking at Edgewood Street Northeast mile 2.1 directions to trailhead 32
- Parking at 7th Street Northeast mile 2.2 directions to trailhead 33
- Parking at Franklin Street Northeast mile 2.2 directions to trailhead 34
- Parking at 8th Street Northeast mile 2.2 directions to trailhead 35
- Parking at 8th Street Northeast mile 2.3 directions to trailhead 36
- Parking at Kearny Street Northeast mile 2.5 directions to trailhead 37
- Parking at 8th Street Northeast mile 2.5 directions to trailhead 38
- Parking at Michigan Avenue Northeast mile 2.6 directions to trailhead 39
- Parking at Monroe Street Northeast mile 2.6 directions to trailhead 40
- Parking at 8th Street Northeast mile 2.6 directions to trailhead 41
- Parking at John McCormack Road mile 2.7 directions to trailhead 42
- Pangborn Lot mile 2.8 directions to Pangborn Lot
- Parking at Thea Bowman Drive mile 3 directions to trailhead 44
- Residence Halls Lot mile 3.1 directions to Residence Halls Lot
- Parking at 7th Street Northeast mile 3.1 directions to trailhead 46
- Parking at Brookland Avenue Northeast mile 3.4 directions to trailhead 47
- Parking at Brookland Avenue Northeast mile 3.5 directions to trailhead 48
- Parking at 6th Street Northeast mile 3.7 directions to trailhead 49
- Fort Totten Metro Station Parking mile 4.2 directions to Fort Totten Metro Station Parking
- Parking at Ingraham Street mile 4.3 directions to trailhead 51
- Parking at Ingraham Street mile 4.3 directions to trailhead 52
- Parking at 1st Place Northeast mile 4.3 directions to trailhead 53
- Parking at 1st Place Northeast mile 4.3 directions to trailhead 54
- Parking at Riggs Road Northeast mile 4.4 directions to trailhead 55
- Parking at Riggs Road Northeast mile 4.5 directions to trailhead 56
- Parking at Blair Road Northwest mile 5 directions to trailhead 57
- Parking at Blair Road Northwest mile 5 directions to trailhead 58
- Parking at Oglethorpe Street Northwest mile 5 directions to trailhead 59
- Parking at Blair Road Northwest mile 5 directions to trailhead 60
- Parking at Kansas Avenue Northwest mile 5.1 directions to trailhead 61
- Parking at Blair Road Northwest mile 5.1 directions to trailhead 62
- Parking at Peabody Street Northwest mile 5.1 directions to trailhead 63
- Parking at Blair Road Northwest mile 5.2 directions to trailhead 64
- Parking at Blair Road Northwest mile 5.2 directions to trailhead 65
- Parking at Chillum Place Northwest mile 5.3 directions to trailhead 66
- Parking at Blair Road Northwest mile 5.3 directions to trailhead 67
- Parking at Chillum Place Northwest mile 5.4 directions to trailhead 68
- Parking at Sandy Spring Road Northwest mile 5.6 directions to trailhead 69
- Parking at Sandy Spring Road Northwest mile 5.6 directions to trailhead 70
- Parking at Whittier Street Northwest mile 5.7 directions to trailhead 71
- Parking at Van Buren Street Northwest mile 5.7 directions to trailhead 72
- Parking at Vine Street Northwest mile 5.9 directions to trailhead 73
- Parking at Vine Street Northwest mile 5.9 directions to trailhead 74
- Parking at Vine Street Northwest mile 5.9 directions to trailhead 75
- Parking at Vine Street Northwest mile 5.9 directions to trailhead 76
Plan your visit
- By trainAmtrak: Washington, DC (WAS) under 0.1 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Metropolitan Branch Trail (MBT) is a paved multi-use trail in Washington, D.C., running from Union Station north toward Silver Spring, Maryland, beside Metrorail and CSX tracks on the right-of-way of the Baltimore and Ohio Railroad's Metropolitan Branch, opened in 1873. The District Department of Transportation (DDOT) builds the D.C. portion; when complete the trail will run 8 miles, seven in the District and one in Maryland, and it is part of the East Coast Greenway. Patrick Hare of Brookland conceived the trail in 1988. The first piece, nearly a mile along John McCormack Road near Catholic University, was completed in November 1998 and was named a Millennium Legacy Trail in 1999, and the core 1.5 miles from New York Avenue to Franklin Street opened in May 2010.
From Union Station the route follows a curb-protected two-way bike lane on 1st Street NE, rises onto a raised section built with the NoMa–Gallaudet U Metro station, crosses Alethia Tanner Park between Q and R Streets, and passes the Rhode Island Avenue pedestrian bridge to the Rhode Island Avenue Metro station before reaching Brookland. An 11-foot-wide, 0.8-mile section from Brookland to Fort Totten opened in June 2022, built with WMATA and the National Park Service at a cost of $12.9 million. The Fort Totten–Takoma section was dedicated on November 12, 2025 at Whittier Street and Blair Road NW. The remaining gap in the District, between Takoma and Piney Branch Road, was scheduled to follow.
The trail is paved throughout, and the two newest sections have LED lighting, wayfinding signs and stormwater facilities and keep riders away from vehicle traffic; the Brookland–Fort Totten section also has security cameras. A connection to Florida and New York Avenues runs through the 202 Florida Avenue building, which opened in 2024 with a bike lobby and stairs to Florida Avenue. DDOT counted more than 1,500 daily users in 2022.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Natl Arboretum Dc, 3.6 km from the trail's middle, 34 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 45 48 56 68 77 85 90 88 82 70 58 49 Low °F 28 30 36 46 57 66 71 69 62 49 39 32 Precipitation, in 3 2.8 4 3.4 4.3 4.6 4.6 3.7 4.1 4.2 3.2 3.7 Snow, in 4.7 2.3 1.4 0 0 0 0 0 0 0 0 1.3 - On the National Register
- L'Enfant Plan of the City of Washington, District of Columbia, Washington · structure, listed 1997 · nomination file for L'Enfant Plan of the City of Washington, District of Columbia
- Glenwood Cemetery, Washington · historic district, listed 2017
- Takoma Park Historic District, Washington · historic district, listed 1983 · nomination file for Takoma Park Historic District
- Capitol Hill Historic District (Boundary Increase II), Washington · historic district, listed 2015
- Capitol Hill Historic District, Washington · historic district, listed 1976 · nomination file for Capitol Hill Historic District
- Civil War Monuments in Washington, DC, Washington · object, listed 1978 · nomination file for Civil War Monuments in Washington, DC
- American Revolution Statuary, Washington · object, listed 1978 · nomination file for American Revolution Statuary
- Old maps
USGS topographic maps of the trail's middle go back to the 1899 Patuxent sheet (1:125,000); the 1956 Washington East sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- In 2024 a volunteer group put temporary jug water stations along the trail in warm months, and two riders said they had used them, one during a long run. r/bikedc, Jan 2024 · r/washingtondc, Apr 2024
- Riders in January 2024 reported icy stretches after back-to-back storms; one walked a bike over ice in places and another nearly fell on a run. r/washingtondc, Jan 2024
- Riders in May 2025 described a low spot near Alethia Tanner Park that floods in rain and stays wet for a while; one said they filed a 311 drainage request. r/bikedc, May 2025
- Riders in 2024 and 2025 named crowding as the main hazard at commute hours and on nice days; one still preferred the trail to riding streets because it has no cars. r/washingtondc, Apr 2024 · r/washingtondc, Nov 2025
32 Reddit threads about this trail, Jan 2024 to Oct 2026
- Where can I report infrastructure damage? r/bikedc · May 2025 · 23 comments
- Melting is not an effective snow policy r/washingtondc · Jan 2024 · 189 comments
- Why water jugs appeared on the Met Branch Trail r/washingtondc · Apr 2024 · 25 comments
- Some kids/teens threw a rock at my head on the MBT today r/washingtondc · Nov 2025 · 85 comments
- Trail Lobby Opens in NoMa r/washingtondc · Mar 2024 · 23 comments
- 2024 Drinking Water Stations on Met Branch Trail r/bikedc · Jan 2024 · 17 comments
- Are these new? Metropolitan Branch Trail r/bikedc · Oct 2025 · 46 comments
- MBT in Takoma connection r/bikedc · Nov 2025 · 12 comments
- What's up with the MBT? r/washingtondc · Oct 2026 · 14 comments
- Metropolitan Branch Trail Closure for Resurfacing Between Brookland and Fort Totten r/bikedc · Oct 2026 · 18 comments
- Shot with an air soft gun by teens on the Metropolitan Branch Trail near NOMA r/washingtondc · May 2026 · 17 comments
- Takoma to Piney Branch MBT plans r/bikedc · May 2026 · 8 comments
- Question: Where Does Metropolitan Branch trail start and end? r/washingtondc · Apr 2026 · 25 comments
- My Favorite Convoluted MBT-SCT-ART Loop r/bikedc · Mar 2026 · 27 comments
- Let'sseriously talk about the "teen issue r/washingtondc · Mar 2026 · 696 comments
- Best Bike shops in the city for quick tuneups? r/washingtondc · Mar 2026 · 20 comments
- Trails that are clear? r/washingtondc · Feb 2026 · 5 comments
- Accessible walking trails in DC / MD r/washingtondc · Dec 2025 · 19 comments
- I am tired of the harassment on the MBT, and I want to know how we can organize to stop this mess. r/washingtondc · Aug 2025 · 403 comments
- PSA: kids shooting fireworks at pedestrians on MBT. r/washingtondc · Jul 2025 · 2 comments
- Air Quality Concerns - Metropolitan Branch Trail r/washingtondc · May 2025 · 10 comments
- Apartments with Bike Amenities r/bikedc · Mar 2025 · 18 comments
- Two Days w/ 11 Year Old Daughter r/washingtondc · Dec 2024 · 41 comments
- Smoke plume invades Met Branch Trail r/washingtondc · Oct 2024 · 1 comments
- Route suggestions needed: Bloomingdale to Riverdale r/bikedc · Sep 2024 · 14 comments
- Recommendations for Dinner and Bars/Breweries r/washingtondc · Aug 2024 · 7 comments
- Paris, not a modern bike in sight r/bikecommuting · May 2024 · 212 comments
- Is Fort Totten worth living in for cheap rent and only 10 min walk to Metro r/washingtondc · May 2024 · 115 comments
- General tips and route planning advice for a newbie DC biker? r/bikedc · Mar 2024 · 28 comments
- People attempting to boulder the wall next to Amtrak and MARC train tracks r/washingtondc · Feb 2024 · 165 comments
- No motorized vehicles on MBT… except r/washingtondc · Feb 2024 · 80 comments
- Good Places to ride for someone getting back into biking r/bikedc · Feb 2024 · 21 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of Met Branch Trail
- Agency noticesMetropolitan Branch Trail (DDOT)
- RedditSearch Reddit: r/washingtondc
Nearby trails
- 4th Street Southwest Cycleway 0.9 mi away · 1.7 mi, paved
- Sligo Creek Trail 1.1 mi away · 8.5 mi, paved · Maryland
- Rock Creek Trail 1.3 mi away · 9.3 mi, paved
- Northwest Branch Trail 1.6 mi away · 7.2 mi, paved · Maryland
- Anacostia Riverwalk Trail 1.7 mi away · 17.0 mi, paved
- Rock Creek Hiker/Biker Trail 2.2 mi away · 13.5 mi, paved · Maryland
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 7135288, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Metropolitan Branch Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q6825016, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Mayor Bowser Celebrates the Extension of Metropolitan Branch Trail From Brookland to Fort Totten — DDOT (June 18, 2022) · government source · checked Oct 14, 2026 Supports: 0.8-mile, 11-foot-wide Brookland–Fort Totten section, WMATA and NPS agreements, $12.9 million, LED lighting, more than 1,500 daily users, former B&O Metropolitan Branch, 8-mile trail from Silver Spring to Union Station
- Mayor Bowser to Cut the Ribbon on New Fort Totten–Takoma Segment of the Metropolitan Branch Trail — Mayor's Office of Community Affairs (November 12, 2025) · government source · checked Oct 14, 2026 Supports: Fort Totten–Takoma segment completed, ceremony November 12, 2025 at Whittier Street and Blair Road NW, LED lighting, wayfinding, separation from traffic, Takoma–Piney Branch section as the final D.C. gap
- Metropolitan Branch Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: right-of-way opened 1873, Metrorail and CSX tracks, 7 miles in D.C. and 1 in Maryland, East Coast Greenway, conceived 1988 by Patrick Hare, John McCormack Road segment November 1998, Millennium Legacy Trail 1999, New York Avenue–Franklin Street opening May 2010, 1st Street NE protected lane, NoMa raised section, Alethia Tanner Park, Rhode Island Avenue bridge
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.