States › Indiana

Miami Central Trail

Rail-trail in Indiana

Runs through Bunker Hill · Miami County

Conditions now

Loading the weather near Bunker Hill…

Forecast by the National Weather Service for Bunker Hill · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
5.0 mi 8.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East 800 South mile 1.7 directions to trailhead 1
  2. Parking at East 950 S mile 5 directions to trailhead 2
  3. Parking at East 950 S mile 5 directions to trailhead 3
  4. Parking at East 950 S mile 5 directions to trailhead 4
Miami Central Trail drawn on the 1951 USGS topographic map of Bunker Hill, Indiana
Then: the 1951 USGS Bunker Hill sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Miami Central Trail, known as the MAC Trail, is a paved trail of about 5 miles in Miami County, Indiana, on a historic rail corridor between Bunker Hill and McGrawsville. It is part of the Nickel Plate Trail system: Nickel Plate Trail, Inc. counts it as a 5.5-mile MAC connection alongside its 41.4-mile trail from Kokomo to Rochester. The trail held its grand opening at Bunker Hill Town Park on April 25, 2026, and is part of the Great American Rail-Trail.

Land for the trail came through Indiana's Bicentennial Nature Trust program. One project bought about 65 acres in Miami County to extend the Nickel Plate Trail by 6.5 miles, west from Bunker Hill to the Grissom Air Museum along US 31 and east to McGrawsville past the Maconaquah school complex, as a step toward joining the Nickel Plate Trail and the Cardinal Greenway, the state's two longest rail-trails. A second Nature Trust project acquired about 1 mile of former rail corridor, 35 acres in Miami County, extending the Nickel Plate toward the Cardinal Greenway and leaving a gap of less than 2 miles between them.

From Bunker Hill Town Park the trail runs southeast past Maconaquah High School to McGrawsville on a gentle route open to walkers and cyclists. OpenStreetMap maps it as an asphalt path about 5 miles long, with parking near East 800 South and at East 950 South.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kokomo 3 WSW, 23.1 km from the trail's middle, 2 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323749627381848277655038
Low °F171928385060626053423223
Precipitation, in32.43.24.34.75.24.73.93.73.23.32.9
Snow, in10.69.85.20.7000000.11.56.2
Old maps

USGS topographic maps of the trail's middle go back to the 1951 Bunker Hill sheet (1:24,000); the 1963 Bunker Hill sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. IBC: Nickel Plate Trail Expansion – Bicentennial Nature Trust — IN.gov · government source · checked Oct 15, 2026
    Supports: acquisition of about 65 acres in Miami County to extend the Nickel Plate Trail 6.5 miles west from Bunker Hill to the Grissom Air Museum along US 31 and east to McGrawsville past the Maconaquah school complex; step toward connecting the Nickel Plate and the Cardinal Greenway, Indiana's two longest rail trails
  3. IBC: Nickel Plate Trail Extension - Bicentennial Nature Trust — IN.gov · government source · checked Oct 15, 2026
    Supports: about 1 mile of former rail corridor, 35 acres, in Miami County; gap of less than 2 miles to the Cardinal Greenway
  4. The MAC Trail Is Officially Open! — Nickel Plate Trail · organization · checked Oct 15, 2026
    Supports: Miami Central (MAC) Trail name; grand opening April 25, 2026; Bunker Hill Town Park to McGrawsville; part of the Nickel Plate Trail system; 5-mile paved trail open to walkers and cyclists; historic rail corridor southeast from Bunker Hill past Maconaquah High School; Great American Rail-Trail; Town of Bunker Hill
  5. Nickel Plate Trail — home page · organization · checked Oct 15, 2026
    Supports: 41.4 miles Kokomo to Rochester plus 5.5-mile MAC connection
  6. Miami Central Trail (way 1417232718) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: asphalt surface, short name MAC Trail; mapped length about 5 miles; parking near East 800 South and East 950 South

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.