States › Michigan

Mid Michigan Community Pathway

Greenway in Michigan

Runs through Mount Pleasant, Union Township (Isabella County), Lincoln Township (Isabella County), Coe Township, Emerson Township and Ithaca · Isabella and Gratiot counties

Conditions now

Loading the weather near St. Louis…

Forecast by the National Weather Service for St. Louis · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
13.8 mi 22.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Mission Road mile 4.7 directions to trailhead 1
  2. Parking at East Deerfield Road mile 6.4 directions to trailhead 2
  3. car parking restrooms directions to car parking
  4. truck parking restrooms directions to truck parking
Ithaca, along the trail (opens in a new tab)
Ithaca, along the trail · Photo: rossograph · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Mid-Michigan Community Pathways Group, a collaboration of local, state and tribal entities, set out in an October 2013 action plan a goal of about 40 miles (64 km) of paved, non-motorized path between Ithaca and Clare, divided into six segments. The plan describes the Mt. Pleasant to Shepherd segment as about 6.8 miles (10.9 km) along South Mission Road and Blanchard Road, and the segment connecting the Alma and St. Louis area to Ithaca as about 16.3 miles (26.2 km), running south along US-127 to Washington Road in Ithaca. A race listing announced a ribbon cutting and grand opening of the Shepherd to Mt. Pleasant trail for August 1, 2018. The City of Ithaca's recreation page lists a 6.2-mile (10 km) bike path along US-127 between Ithaca and Alma.

The line in this record has two separate pieces in Isabella and Gratiot counties, together about 13.8 miles (22.2 km). The western piece runs about 7.2 miles (11.6 km) from East Blanchard Road near Shepherd to South Crawford Road at Mount Pleasant. The eastern piece runs about 6.6 miles (10.6 km) along US-127 from East Washington Road in Ithaca north to East Lincoln Road in Emerson Township. OpenStreetMap tags the mapped ways as asphalt cycleways, named Mid-Michigan Community Pathway on one and Mid Michigan Community Pathway on another.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Alma, 16 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F293243566878828073604634
Low °F151523344656595850393022
Precipitation, in2.21.82.13.53.73.63.33.72.73.22.72
Snow, in10.79.95.42.1000000.32.78.2
Old maps

USGS topographic maps of the trail's middle go back to the 1930 Shepherd sheet (1:48,000); the 1954 Midland sheet (1:250,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Mid-Michigan Community Pathways Group Action Plan (October 2013) — East Michigan Council of Governments · organization · checked Oct 31, 2026
    Supports: group is a collaboration of local, state and tribal entities; goal of a paved, non-motorized path network of about 40 miles between Ithaca and Clare; six segments; Mt. Pleasant to Shepherd segment (Segment C) about 6.8 miles along S. Mission Road and Blanchard Road; Alma/St. Louis area to Ithaca segment (Segment A) about 16.3 miles, running south along US-127 to Washington Road in Ithaca
  3. Mid Michigan Community Pathways Ribbon Cutting 5K Run/Walk — RunSignup · web · checked Oct 31, 2026
    Supports: event on August 1, 2018 to celebrate the ribbon cutting and grand opening of the Shepherd to Mt. Pleasant trail
  4. Ithaca Area Recreation — City of Ithaca · web · checked Oct 31, 2026
    Supports: a parallel bike path of 6.2 miles runs along US-127 between Ithaca and Alma
  5. Mid-Michigan Community Pathway — OpenStreetMap way 435220342 · web · checked Oct 31, 2026
    Supports: a mapped way of the eastern piece (north of Ithaca): highway=cycleway, surface=asphalt, name Mid-Michigan Community Pathway
  6. Mid Michigan Community Pathway — OpenStreetMap way 1182313355 · web · checked Oct 31, 2026
    Supports: a mapped way of the western piece (between Shepherd and Mount Pleasant): highway=cycleway, surface=asphalt, name Mid Michigan Community Pathway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.