Middle Fork Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Blowing Rock · Watauga County
Conditions now
Loading the weather near Blowing Rock…
Forecast by the National Weather Service for Blowing Rock · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Payne Branch Road mile 0 directions to trailhead 1
- Parking at Niley Cook Road mile 0.5 directions to trailhead 2
- Parking at Flame Azalea Drive mile 0.8 directions to trailhead 3
- Parking at Tweetsie Railroad Lane mile 1.4 directions to trailhead 4
- Parking at Tweetsie Railroad Lane mile 1.5 directions to trailhead 5
- Parking at Tweetsie Railroad Lane mile 1.5 directions to trailhead 6
- Parking at Mystery Hill Lane mile 2 directions to trailhead 7
- Parking at Shoppes on the Parkway Road mile 4.3 directions to trailhead 8
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Middle Fork Greenway is a pedestrian and cycling greenway under construction along the Middle Fork of the New River and the US 321 corridor between Boone and Blowing Rock, North Carolina. It is a Blue Ridge Conservancy project, led with High Country Pathways in partnership with the Town of Blowing Rock, the Town of Boone and Watauga County. When finished it is planned to run 6.5 miles and connect with the Boone Greenway, the Blue Ridge Parkway, the Mountains-to-Sea Trail, Tweetsie Railroad and Mystery Hill. It is being built segment by segment as land, engineering and funding come together, mostly as 10-foot asphalt with some natural-surface stretches at first.
The 321 Trailhead, with 27 parking spaces, bike racks and two bridges, was about to open in December 2021; from there the trail runs north to a small access on Niley Cook Road. A bridge at Tweetsie Railroad was installed in July 2024, and in August 2025 a ribbon-cutting opened the underpass at Tweetsie, linking two continuous miles of trail. Our map record covers about 2.2 miles in OpenStreetMap, mostly this central section from the Tweetsie area north to Niley Cook Road, with gravel stretches, tunnels and bridges, plus a separate short piece near Blowing Rock.
In November 2025 the conservancy reported that a 1.2-mile Blowing Rock segment, starting at the Welcome to Blowing Rock sign trailhead, was taking shape on easements donated to the town, funded by a federal lands access grant and state money. Construction of Angler Park, with trail, bridges and trailhead parking, was scheduled to begin in spring 2026. Walking, jogging, cycling, rollerblading and skateboarding are allowed; motor vehicles other than wheelchairs are not.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boone 1 SE, 5.3 km from the trail's middle, 67 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 41 45 52 62 69 76 79 78 72 63 53 45 Low °F 22 24 29 37 46 54 58 56 50 39 30 25 Precipitation, in 4.4 3.6 4.8 5.5 5.5 5.6 5.1 5.6 5.7 4.7 4.4 4.2 Snow, in 6.6 6.7 4.8 1 0 0 0 0 0 0.3 1 5.2 - On the National Register
- East Tennessee & Western North Carolina Railroad Locomotive No. 12, Blowing Rock · structure, listed 1992 · nomination file for East Tennessee & Western North Carolina Railroad Locomotive No. 12
- Flat Top Estate, Blowing Rock · historic district, listed 2013
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Cranberry sheet (1:125,000); the 1959 Boone sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMiddle Fork Greenway — Blue Ridge Conservancy
Nearby trails
- Boone Greenway 1.0 mi away · 2.8 mi, paved
- Lee & Vivian Reynolds Greenway 1.4 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20021607, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Middle Fork Greenway — Blue Ridge Conservancy · organization · checked Oct 16, 2026 Supports: Blue Ridge Conservancy project with the towns of Blowing Rock and Boone and Watauga County; 6.5 miles planned; connections to the Boone Greenway, Blue Ridge Parkway, Mountains-to-Sea Trail, Tweetsie and Mystery Hill; built segment by segment; 10-foot asphalt with some natural surface; allowed activities; no motorized vehicles other than wheelchairs
- Middle Fork Greenway (MFG page) — Blue Ridge Conservancy · organization · checked Oct 16, 2026 Supports: pedestrian and cycling greenway along the Middle Fork River and US 321 corridor; led by Blue Ridge Conservancy and High Country Pathways
- The Trail of Two Bridges - Progress on the Middle Fork Greenway — Blue Ridge Conservancy (December 7, 2021) · organization · checked Oct 16, 2026 Supports: 321 Trailhead opening soon; 27 parking spaces, bike racks, two bridges; trail north to a parking access on Niley Cook Road
- Middle Fork Greenway Hosts a Ribbon-Cutting for the Tweetsie Railroad Bridge and Tunnel Murals — Blue Ridge Conservancy (August 26, 2025) · organization · checked Oct 16, 2026 Supports: bridge installed late July 2024; underpass at Tweetsie opened, connecting two continuous miles; Angler Park with trail, bridges and trailhead parking, phase one construction scheduled for spring 2026
- Blowing Rock Segment of Middle Fork Greenway Beginning to Take Shape — Blue Ridge Conservancy (November 19, 2025) · organization · checked Oct 16, 2026 Supports: 1.2-mile Blowing Rock segment from the Welcome to Blowing Rock sign trailhead; easements donated to the Town of Blowing Rock; Eastern Federal Lands Access Program grant and state funding
- Middle Fork Greenway — OpenStreetMap relation 20021607 · web · checked Oct 16, 2026 Supports: mapped length about 2.2 miles; central section from the Tweetsie area north to Niley Cook Road; gravel stretches, tunnels and bridges; separate short piece near Blowing Rock
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.