States › Arkansas

Midtown Corridor Trail

Greenway in Arkansas

Runs through Fayetteville · Washington County

Conditions now

Loading the weather near Fayetteville…

Forecast by the National Weather Service for Fayetteville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Midtown Corridor Trail (opens in a new tab)
Photo: jpinar · CC BY-SA 4.0 · Mapillary

About this trail

The Midtown Corridor Trail is a lit concrete shared-use path in Fayetteville, Arkansas, built by the City of Fayetteville along sections of Porter Road, Deane Street, Sycamore Street and Poplar Street. It adds east-west connectivity in a city where hilly terrain makes such links difficult, and the corridor is mostly flat.

The route connects to the Razorback Greenway and, on Poplar Street, runs on the north side past Woodland School, which was the eastern end at the time of a 2024 report. Later phases were to cross College Avenue, with a new signal at Poplar. The project also covers curbs, storm drainage, lighting, sidewalks and bus shelters, and construction was expected to run through 2025.

OpenStreetMap maps the trail as a concrete cycleway designated for bicycles and pedestrians, and it is the source of the name used here. The record measures about 1.4 miles.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April, June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Fayetteville Exp Stn, 1.8 km from the trail's middle, 1 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F465159697684898981715950
Low °F273038475666696860483830
Precipitation, in2.62.33.74.564.73.63.44.5442.9
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Fayetteville sheet (1:125,000); the 1958 Fayetteville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Midtown Corridor disrupts traffic for promise of equitable transportation — KUAF · web · checked Oct 18, 2026
    Supports: city-run project; streets; Razorback Greenway link; Poplar Street route and Woodland School end; later phases; construction through 2025; flat terrain and connectivity
  3. OpenStreetMap · web · checked Oct 18, 2026
    Supports: concrete surface, lit, bicycle and foot designated; source of the trail name

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.