Milwaukee Road Transportation Trailway
Rail-trail in Indiana · OpenStreetMap relation
Runs through Williams and Bedford · Lawrence County
Conditions now
Loading the weather near Bedford…
Forecast by the National Weather Service for Bedford · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 16th Street mile 9.5 directions to trailhead 1
- Parking at 16th Street mile 9.6 directions to trailhead 2
- Parking at U Street mile 10 directions to trailhead 3
- Parking at John A Williams Boulevard mile 10.2 directions to trailhead 4
- Parking at John A Williams Boulevard mile 10.4 directions to trailhead 5
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Milwaukee Road Transportation Trailway, also known as the Milwaukee Trail, is a crushed-limestone rail-trail in Lawrence County, Indiana, on the former Milwaukee Road railroad corridor west of Bedford. Limestone Country, Lawrence County's visitor guide, describes it as an 11-mile trail with views of the White River and old railroad bridges. TrailLink reports that as of August 2023 more than 10 miles were open from Lincoln Avenue in Bedford to the Williams Dam State Recreational Area at Williams, and that the trail is planned to reach 20 miles, from Bedford to Indian Springs. No managing agency or trail group was identified.
In Bedford, parking is available at John Williams Boulevard and Lincoln Avenue and at the Bedford National Guard armory, with the trail on its south side; TrailLink also lists on-street spaces along 9th Street between Lincoln Avenue and O Street, linked to the trailhead by a paved alley. The trail passes under 16th Street, one of Bedford's main roads, before heading southwest into the countryside through limestone rock cuts, woods and a series of creek crossings. The other end has parking at the Williams Dam lot. Mile markers line the route, and the visitor guide advises noting the nearest one when calling 911.
E-bikes are allowed; ATVs and UTVs are not. Riders' reports on TrailLink describe a compacted gravel surface that is rougher near Williams, no services along the way, and washouts from heavy rain that have needed repair.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as an abandoned rail line.
- Shade
59% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Oolitic Purdue Ex Fm, 6.4 km from the trail's middle, 44 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 42 53 64 74 82 85 84 79 67 54 42 Low °F 20 23 31 41 52 60 64 62 54 42 33 25 Precipitation, in 3.4 2.8 3.9 5.1 5.6 5.2 4.3 3.6 3.4 3.5 3.8 3.5 Snow, in 5.1 4.7 2.1 0.1 0 0 0 0 0 0 0.2 4.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1935 Oolitic sheet (1:48,000); the 1957 Bedford West sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Indiana
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9392185, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Milwaukee Trail – Limestone Country (Lawrence County visitor guide) · web · checked Oct 15, 2026 Supports: 11-mile crushed limestone trail in Lawrence County on a former railroad; views of the White River and old railroad bridges; parking at John Williams Blvd & Lincoln, Bedford National Guard armory (trail on its south side), Williams Dam parking lot; note mile number and call 911 in an emergency
- Milwaukee Road Transportation Trailway | Indiana Trails | TrailLink · web · checked Oct 15, 2026 Supports: also known as the Milwaukee Trail; former Milwaukee Road Railroad route; planned 20 miles from Bedford to Indian Springs; as of August 2023 over 10 miles open from Lincoln Avenue in Bedford to Williams Dam State Recreational Area; limestone rock cuts, tree canopy and creek crossings; e-bikes allowed, ATVs/UTVs not; parking along 9th Street between Lincoln Ave and O Street with paved-alley connection; user reviews: passes under 16th Street, rougher near Williams, no services, compacted gravel, flood washouts repaired
- Milwaukee Road Transportation Trailway, relation 9392185 — OpenStreetMap · web · checked Oct 15, 2026 Supports: the mapped route's name and extent between Bedford and Williams
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.