States › Vermont

Missisquoi Valley Rail Trail

Rail-trail in Vermont · OpenStreetMap relation

Runs through Town of St. Albans, Town of Swanton, Sheldon, Enosburg Falls, Enosburgh, Berkshire and Richford · Franklin County

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Missisquoi Valley Rail Trail (MVRT) is a rail trail in northwestern Vermont. The trail is owned by the State of Vermont and maintained by the Department of Forest, Parks, and Recreation, the Vermont Agency of Transportation, and volunteers. The Northwest Vermont Rail Trail Council advises the State on management and use issues. Only non-motorized uses are permitted with the exception of snowmobiles, motorized wheelchairs, and maintenance vehicles. Motorbikes, ATVs, and ORVs are not permitted on the trail.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
26.1 mi 42.0 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Kane Road mile 14.7 directions to trailhead 1
  2. Parking at Vermont Route 105 mile 15.3 directions to trailhead 2
  3. MVRT - LVRT Parking mile 17.1 directions to MVRT - LVRT Parking
  4. Sheldon Junction Trailhead mile 17.1 directions to Sheldon Junction Trailhead
  5. Parking at Shawville Road mile 18.6 directions to trailhead 5
  6. Parking at Sheldon Road mile 22.9 directions to trailhead 6
  7. Missisquoi Valley Rail Trail St. Albans Trailhead mile 26.1 directions to Missisquoi Valley Rail Trail St. Albans Trailhead
  8. Missisquoi Valley Rail Trail Trailhead Parking St. Albans mile 26.1 directions to Missisquoi Valley Rail Trail Trailhead Parking St. Albans
  9. Parking at Swanton Road mile 26.2 directions to trailhead 9
  10. Parking at Swanton Road mile 26.3 directions to trailhead 10
  11. Parking at Rewes Drive mile 26.3 directions to trailhead 11

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Missisquoi Valley Rail Trail.JPG (opens in a new tab)
Missisquoi Valley Rail Trail.JPG · Photo: ElliotRosewater · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Missisquoi Valley Rail Trail (MVRT) is a rail trail of about 26 miles in Franklin County, northwestern Vermont, between St. Albans and Richford. It is owned by the State of Vermont and maintained by the Vermont Agency of Transportation (VTrans) and volunteers; the Northwest Vermont Rail Trail Council, made up of representatives of the communities along the trail and of its users, advises the state on management and use. The trail follows a line built in the 1870s as the Missisquoi Railroad and later operated as the Central Vermont Railway's Richford Branch. In June 1984 a derailment damaged the bridge over the Missisquoi River at Sheldon Junction, and it was not repaired; the western section was abandoned in 1990 and the eastern section in 1992. Trail work began in fall 1994 and was completed the next year except for the Sheldon Junction bridge, which was repaired in October 2002.

From its western trailhead in St. Albans the trail runs through Swanton, Fairfield, Sheldon, Enosburg and Berkshire to Richford, passing the villages of Sheldon Springs, Sheldon Junction, Enosburg Falls and East Berkshire through forest and farmland. Along much of its eastern half it parallels the Missisquoi River. At Sheldon Junction it meets the Lamoille Valley Rail Trail, which shares a trailhead there.

The 10-foot surface is mostly crushed stone with stone dust, with asphalt at most farm crossings and a one-third-mile asphalt section in Enosburg Falls; grades do not exceed 3 percent except at some road crossings. All non-motorized uses are allowed, including e-bikes and horses; in winter local clubs groom the trail for snowmobiles, and ATVs are not permitted. In 2023 VTrans received $1.44 million in federal funds to rehabilitate the trail, replacing its surface with the same material and extending it toward downtown St. Albans at Lower Newton Street.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 98% of this route as a trail on former railroad right-of-way.

The line; owned by the State of Vermont. From VTrans Rail Lines.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Enosburg Falls, 4.6 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303342577077828072604735
Low °F8919324353585649382816
Precipitation, in2.422.53.23.74.44.24.444.23.12.9
Snow, in17.919.317.14.5000000.74.918.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1920 Franklin Pond sheet (1:62,500); the 1953 Enosburg Falls sheet (1:62,500) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in July 2024 said the Lamoille Valley trail could be ridden to Sheldon Junction and linked to the Missisquoi trail to reach Richford, where the border crossing connects to Route Verte 4. r/bikepacking, Jun 2024
  • Two riders in October 2025 who rode the Lamoille and Missisquoi trails described the gravel as in great or nearly flawless shape and the trail as lightly travelled. r/bicycletouring, Oct 2025
  • In October 2025, two riders said the start at St. Johnsbury on the Lamoille trail needed a road detour; one described the roughly 10 miles to Danville as mostly closed, with steep unpaved climbs. r/bicycletouring, Oct 2025
  • One rider in October 2025 said the stretch between Morrisville and St. Albans was sparsely populated and suggested packing lunch, and that St. Albans lodging was decent but pricey. r/bicycletouring, Oct 2025
3 Reddit threads about this trail, Jun 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9679206, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Missisquoi Valley Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q6878932, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Lamoille Valley Rail Trail — Vermont Rail Trails (Vermont Agency of Transportation) · government source · checked Oct 13, 2026
    Supports: state trail list giving the Missisquoi Valley Rail Trail as 26.4 miles in northwestern Vermont; MVRT/LVRT trailhead at Sheldon Junction
  5. Missisquoi Valley Rail Trail — Wikipedia · organization · checked Oct 13, 2026
    Supports: St. Albans to Richford; towns Swanton, Fairfield, Sheldon, Enosburg, Berkshire; villages Sheldon Springs, Sheldon Junction, Enosburg Falls, East Berkshire; forest and farmland; parallels the Missisquoi River in the east; built in the 1870s as the Missisquoi Railroad, later Central Vermont Railway Richford Branch; June 1984 derailment and unrepaired bridge; abandonment 1990 and 1992; trail work fall 1994–1995; bridge repaired October 2002; state ownership
  6. Trail Facts & Regulations — Missisquoi Valley Rail Trail (Northwest Vermont Rail Trail Council) · organization · checked Oct 13, 2026
    Supports: 26.4 miles St. Albans–Richford; 10-ft surface of crushed stone with stone dust, asphalt at most agricultural crossings, one-third-mile asphalt in Enosburg Falls; 3% maximum grade; state ownership, VTrans and volunteer maintenance, council advises the state; non-motorized uses, e-bikes and horses allowed; snowmobiles groomed by local clubs; ATVs prohibited
  7. Missisquoi Valley Rail Trail — Northwest Vermont Rail Trail Council · organization · checked Oct 13, 2026
    Supports: 26.4 miles through Franklin County; council's links to Facebook and Instagram
  8. Missisquoi Valley Rail Trail upgrades to provide links with regional network — WCAX (February 13, 2023) · press · checked Oct 13, 2026
    Supports: $1.44 million in federal funds to VTrans for rehabilitation; surface replaced with the same material; extension toward downtown St. Albans on Lower Newton Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.