Missouri Greenway
Greenway in Missouri · OpenStreetMap relation
Runs through Chesterfield, St. Charles, Bridgeton and Hazelwood · St. Charles and St. Louis counties
Conditions now
Loading the weather near Maryland Heights…
Forecast by the National Weather Service for Maryland Heights · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Trailhead at Missouri Greenway Parking Aisle mile 2.8 directions to trailhead 1
- Parking mile 3.7 directions to trailhead 2
- Trailhead at Charbonier Road mile 7.7 directions to trailhead 3
- Parking at Truman Park mile 9.1 directions to trailhead 4
- Trailhead at Missouri Bluffs Access Road restrooms directions to trailhead 5
- Parking at North Main restrooms directions to trailhead 6
- Parking directions to trailhead 7
- Parking directions to trailhead 8
- Parking directions to trailhead 9
- Parking at Missouri Bluffs Access Road restrooms directions to trailhead 10
(opens in a new tab) About this trail
The Missouri Greenway is a planned 55-mile (river mile) greenway corridor along the Missouri River in the St. Louis region, from the confluence with the Mississippi west to Boone's Crossing in Chesterfield, Missouri. It is a project of Great Rivers Greenway, the regional greenway district, and is not a rail-trail. Built sections are managed with local cities, which set the rules, parking and hours. The longest built section, the Monarch Chesterfield Levee trail in the Chesterfield Valley, has its own page; this record covers the other mapped pieces, about 8.2 miles in all.
The main piece is the Earth City Levee section, which Great Rivers Greenway lists as a 4.7-mile paved trail. Its trailhead is in Bridgeton's Riverwoods Park, near Earth City Parkway (Highway 141) and St. Charles Rock Road, and the City of Bridgeton manages the park segment. The trail runs through hardwood forest and wetlands with nearly 3 miles of shade in the park, then continues in the sun along the Earth City Levee to a parking lot just past the Highway 370 bridge, with views across the river to historic St. Charles. At the north end, a separated walking and biking lane on the Highway 370 bridge crosses the Missouri River toward the Katy Trail. Another mapped piece is at Truman Park in Hazelwood, where the City of Hazelwood maintains a paved trail of a little over a third of a mile from the park's fishing pond toward the St. Stanislaus Conservation Area, with a bridge over Audubon Creek; a short piece off Missouri Bluffs Access Road also carries the name.
The middle of the Riverwoods Trail, along the river, is permanently closed after repeated flooding, so the park section is ridden as an out-and-back. The bridge path on westbound Highway 370 is closed from December 2025 to December 2027 for a Missouri Department of Transportation project; the greenway stays open under the bridge.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March, June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
St Charles Elm Pt, 5.5 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 45 55 67 76 84 88 87 80 69 55 44 Low °F 22 25 34 44 55 64 68 66 57 46 35 26 Precipitation, in 2.7 2.9 3.6 5.1 5.5 4.3 4.2 4.1 3.1 3.5 3.7 3 Snow, in 4.3 2.6 0.5 0 0 0 0 0 0 0 0.1 1.5 - On the National Register
- St. Charles Historic District, St. Charles · historic district, listed 1970 · nomination file for St. Charles Historic District
- Charbonier Bluff, Hazelwood · site, listed 1995 · nomination file for Charbonier Bluff
- Old maps
USGS topographic maps of the trail's middle go back to the 1924 Robertson sheet (1:24,000); the 1954 St. Charles sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationGreat Rivers Greenway: Missouri Greenway, Earth City Levee
- RedditSearch Reddit: r/missouri
Nearby trails
- Monarch-Chesterfield Levee Trail within 0.2 mi · 12.1 mi, paved
- Katy Trail within 0.2 mi · 240 mi, crushed stone
- Boschert Greenway 0.4 mi away · 4.4 mi, paved
- Busch Greenway 0.9 mi away · 4.7 mi, paved
- Sunset Greenway 1.3 mi away · 4.3 mi, paved
- I-270 North Multiuse Path 1.4 mi away · 4.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14283031, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Missouri Greenway Plan — Great Rivers Greenway · organization · checked Oct 15, 2026 Supports: 55-mile (river mile) corridor from the Mississippi-Missouri confluence west to Boone's Crossing in Chesterfield
- Missouri Greenway: Earth City Levee — Great Rivers Greenway · organization · checked Oct 15, 2026 Supports: 4.7-mile paved trail; Riverwoods Park trailhead near Earth City Parkway (Highway 141) and St. Charles Rock Road; City of Bridgeton manages the Riverwoods Park segment; municipalities set rules, parking and hours; hardwood forest, wetlands, close to 3 miles of shade; Earth City Levee to the lot past the Highway 370 bridge; views of historic St. Charles; separated lane over the Missouri River to the Katy Trail; middle section permanently closed after flooding, out-and-back; westbound 370 bridge path closed December 2025-December 2027 for MoDOT project, greenway open under 370
- Missouri Greenway: Truman Park — Great Rivers Greenway · organization · checked Oct 15, 2026 Supports: Truman Park in Hazelwood; managed and maintained by the City of Hazelwood; a little more than a third of a mile of paved trail from the fishing pond toward St. Stanislaus Conservation Area; bridge with views of Audubon Creek
- Missouri Greenway, relation 14283031 — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped pieces carried under the Missouri Greenway name, including the Monarch-Chesterfield Levee Trail child route and a piece off Missouri Bluffs Access Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.