Mitch Park Trail
Greenway in Oklahoma
Runs through Edmond · Oklahoma County
Conditions now
Loading the weather near Edmond…
Forecast by the National Weather Service for Edmond · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Big Cedar Avenue mile 0.1 directions to trailhead 1
- Parking mile 0.2 directions to trailhead 2
- Parking mile 0.4 directions to trailhead 3
- Parking at West Covell Road mile 0.4 directions to trailhead 4
- Parking at West Covell Road mile 0.6 directions to trailhead 5
- Parking at West Covell Road mile 0.6 directions to trailhead 6
- Parking at West Covell Road mile 0.6 directions to trailhead 7
- Parking at West Covell Road mile 0.6 directions to trailhead 8
- Parking mile 1.9 directions to trailhead 9
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Mitch Park Trail is a network of paved paths, about 4.7 miles in all, in Mitch Park in Edmond, Oklahoma. The park and its trails are run by the City of Edmond, which lists Mitch Park among its multiple-use city park trails and posts a trail map for it. The city's trails page states that all of its trails are open from sunrise to sunset, seven days a week.
OpenStreetMap maps the trail as a set of cycleways, most of them asphalt and one section concrete, each marked as designated for both bicycles and pedestrians, with mapped trailheads at parking areas on Big Cedar Avenue and West Covell Road. The record is a park path network rather than a rail-trail, and no railroad history is attached to it.
In March 2023 the city closed the park's trails for renovation. Crews were to rebuild the trail base and lay new asphalt on the outer loop, widening it and strengthening the base for heavier use, with work on the inner loop to follow that summer. The project, paid for with city money and American Rescue Plan Act funds, was announced as leaving visitors with 5 to 6 miles of new trails.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Guthrie 5s, 17.5 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 49 54 63 72 79 87 93 93 84 74 61 50 Low °F 25 28 37 46 56 66 71 69 61 48 37 28 Precipitation, in 1.4 1.8 2.7 3.6 5.1 5.3 3 3.9 3.5 3.6 2.5 1.9 Snow, in 2.4 1.7 1.1 0 0 0 0 0 0 0 0.1 1.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Kingfisher sheet (1:125,000); the 1966 Bethany NE sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesCity of Edmond trails page and Mitch Park trail map
Nearby trails
- Coffee Creek Trail within 0.2 mi · 1.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails - City of Edmond, OK · government source · checked Oct 18, 2026 Supports: city lists Mitch Park Trail map among multiple-use park trails; open sunrise to sunset daily
- Mitch Park Trails Closing March 13 For Renovations - News 9 · press · checked Oct 18, 2026 Supports: 2023 renovation, outer-loop asphalt, inner loop, funding, 5 to 6 miles, City of Edmond
- OpenStreetMap · web · checked Oct 18, 2026 Supports: cycleway ways, asphalt and concrete surface, bicycle and foot designated, trailhead streets
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.