Monroe Loop Trail
Greenway in Michigan
Runs through Monroe Township (Monroe County), Frenchtown Township, Monroe and West Monroe · Monroe County
Conditions now
Loading the weather near Monroe…
Forecast by the National Weather Service for Monroe · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Lot 7 mile 0 directions to Lot 7
- Parking at North Custer Road mile 3 directions to trailhead 2
- Parking at North Custer Road mile 4.4 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Monroe Loop Trail, also called the Monroe Area Loop Trail, is a shared-use path being built around Monroe, Michigan. The Monroe News reported in June 2022 that the Community Foundation of Monroe County had received a $1.53 million grant from the Ralph C. Wilson, Jr. Foundation toward the 6.5-mile trail, more than 30 percent of its estimated $4.77 million cost. Bedford, Frenchtown and Monroe townships contributed funds, and the City of Monroe and the county road commission were among the partners.
As designed, the 10-foot path begins south of the River Raisin in Monroe and runs west along West Seventh Street and a former railroad corridor to Monroe County Community College on South Raisinville Road. From there it turns north to North Custer Road in Frenchtown Charter Township, reaches the county museum's North Territorial Park, and loops back east to the existing Mark Worrell pathway at Munson Park. The loop is part of the River Raisin Heritage Trail, and the paper reported plans to carry it north toward the Iron Belle Trail and south toward Toledo.
This record covers two asphalt sections, about 3.9 miles in all, that OpenStreetMap maps as newly built: about 2.5 miles running east-west and ending at a Monroe County Community College parking lot, and about 1.4 miles near North Custer Road. No source found gives a completion date for the full loop.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Newport 4sse, 14.7 km from the trail's middle, 10 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 43 56 68 78 83 82 75 62 48 37 Low °F 18 19 27 37 48 58 62 60 54 43 33 25 Precipitation, in 2.1 1.8 2.4 2.9 3.6 3.3 3.2 3.6 3.1 2.6 2.5 2.1 Snow, in 12.4 13.5 5.5 0.6 0 0 0 0 0 0 1 8.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1912 Monroe sheet (1:62,500); the 1952 Monroe sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- River Raisin Heritage Trail 2.6 mi away · 1.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- County awarded $1.5 million grant for loop trail — The Monroe News via Yahoo News (June 5, 2022) · press · checked Oct 15, 2026 Supports: names, $1.53 million grant, 6.5 miles, $4.77 million estimate, partners and contributing townships, 10-foot width, planned route, River Raisin Heritage Trail, planned links to the Iron Belle Trail and Toledo
- Monroe Loop Trail, way 1431405072 — OpenStreetMap · web · checked Oct 15, 2026 Supports: newly built asphalt path near North Custer Road
- Monroe Loop Trail, way 1431405823 — OpenStreetMap · web · checked Oct 15, 2026 Supports: newly built asphalt east-west section ending at a college parking lot
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.