States › Michigan

MSU to Lake Lansing Trail

Greenway in Michigan

Runs through Okemos and Meridian Township · Ingham County

Conditions now

Loading the weather near Okemos…

Forecast by the National Weather Service for Okemos · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.1 mi 3.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Hagadorn Road mile 0 directions to trailhead 1
  2. Parking at South Hagadorn Road mile 0 directions to trailhead 2
  3. Parking at South Hagadorn Road mile 0 directions to trailhead 3
  4. Parking at South Hagadorn Road mile 0.1 directions to trailhead 4
  5. Parking at East Grand River Avenue mile 0.1 directions to trailhead 5
  6. Parking at Northwind Drive mile 0.3 directions to trailhead 6
  7. Parking at Northwind Drive mile 0.4 directions to trailhead 7
  8. Parking at Northwind Drive mile 0.4 directions to trailhead 8
  9. Parking at Northwind Drive mile 0.4 directions to trailhead 9
  10. Parking at Northwind Drive mile 0.5 directions to trailhead 10
  11. Parking at Northwind Drive mile 0.5 directions to trailhead 11
  12. Parking at Northwind Drive mile 0.5 directions to trailhead 12
  13. Parking at Northwind Drive mile 0.6 directions to trailhead 13
  14. Parking at Dawn Avenue mile 0.6 directions to trailhead 14
  15. Parking at Dawn Avenue mile 0.6 directions to trailhead 15
  16. Parking at Dawn Avenue mile 0.7 directions to trailhead 16
  17. Parking at East Grand River Avenue mile 0.9 directions to trailhead 17
  18. Parking at Park Lake Road mile 1 directions to trailhead 18
  19. Parking at East Grand River Avenue mile 1 directions to trailhead 19
  20. Parking at East Grand River Avenue mile 1 directions to trailhead 20
  21. Parking at Campus Hill Drive mile 1.3 directions to trailhead 21
  22. Parking at Campus Hill Drive mile 1.4 directions to trailhead 22

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

MSU to Lake Lansing Trail (opens in a new tab)
Photo: treestryder · CC BY-SA 4.0 · Mapillary

About this trail

The MSU to Lake Lansing Trail is a trail for walking and cycling in Meridian Township, Michigan, being built in phases to form a continuous route from the Lansing River Trail through the Michigan State University campus to the Ingham County parks around Lake Lansing. Meridian Township leads the project. The trail had been discussed in concept since at least the 1990s; a 2006 attempt with Ingham County failed, in part because the needed easements could not be secured. It is not a rail-trail, though part of it runs beside the CN railroad tracks.

Phase I, about 1 mile, opened on December 8, 2023. It begins at Hagadorn Road and Shaw Lane, crosses the Red Cedar River on a bridge behind the MSU Community Music School, follows the riverbank north to the CN tracks and ends at Grand River Avenue and Park Lake Road. It cost $3.37 million, paid for by a federal Transportation Alternatives Program grant, the Ingham County Trails and Parks Millage and the township pathway millage. Phase II, 1.2 miles of asphalt from near Grand River Avenue and Campus Hill Drive through township land preservation property along the south side of the CN tracks to Okemos Road, opened in September 2024; the township estimated its cost at about $730,000. This record maps about 2.1 miles covering those two phases.

From the end of Phase II, a widened 10-foot pathway on the east side of Okemos Road continues to the Inter-Urban pathway. Phase III, still in planning and design, would run from Marsh Road to Lake Lansing Park North. The township says the completed system will add about 6.75 miles of trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

45% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
East Lansing 4 S, 6.8 km from the trail's middle, 8 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323445587079838176624837
Low °F181927374858616052423224
Precipitation, in2.11.61.73.54.43.83.43.53.23.12.51.6
Snow, in14.17.34.20.9000000.31.87.4
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Mason sheet (1:62,500); the 1958 Grand Rapids sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. MSU to Lake Lansing Trail Project — Meridian Township · government source · checked Oct 15, 2026
    Supports: continuous route from the Lansing River Trail through MSU to the Ingham County parks at Lake Lansing; Phase I opened December 2023 and Phase II September 2024; Phase III in planning and design; Phase I about one mile from Hagadorn Road/Shaw to Grand River Avenue/Park Lake Road; Phase II 1.2 miles of asphalt from Grand River/Campus Hill Drive along the south side of the CN tracks through township land preservation property to Okemos Road, about $730,000 from county and township millages; widened 10-foot pathway on east side of Okemos Road to the inter-urban pathway; about 6.75 miles when complete
  3. First Phase of New Trail Connecting MSU to Lake Lansing Opens — East Lansing Info (December 12, 2023) · press · checked Oct 15, 2026
    Supports: December 8, 2023 opening, bridge over the Red Cedar River behind the MSU Community Music School, route along the riverbank to the CN tracks, concept since at least the 1990s, failed 2006 effort and easements, $3.37 million Phase I cost and funding sources, Phase III from Marsh Road to Lake Lansing Park North

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.