Mudline Trail
Rail-trail in Illinois · OpenStreetMap relation
Runs through Carbondale · Jackson County
Conditions now
Loading the weather near Carbondale…
Forecast by the National Weather Service for Carbondale · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- By trainAmtrak: Carbondale, IL (CDL) 1.3 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Mudline Trail, also written Mud Line, is a multi-use path on an old railroad bed in Carbondale, Illinois. The City of Carbondale opened its first section, a paved path of about 1.1 miles, in 2023. It begins on North Oakland Avenue across from the Green Earth Oakland Preserve and runs to New Era Road. WSIU reported that the work was funded by an Illinois Department of Transportation Transportation Enhancement Program grant and that a ribbon cutting was set for September 27, 2023. No motorized vehicles are allowed.
This record runs about 2.4 miles because it includes the second phase. The city also acquired the railroad bed west from New Era Road to the bike tunnel at Route 13; in 2023 KFVS described that stretch as dirt, maintained by the city and awaiting funding for paving. The city's project page lists Phase II of the Northwest Multiuse Bike Path, from New Era Road to Highway 13, as in design as of January 2026. An Illinois Transportation Enhancement Program grant of $1,213,010 was received in June 2025, and construction and completion are expected in 2027. The paved phase is to connect Oakland Avenue with the existing bike trail at Airport Road.
The Saluki Greenway, a 10-foot-wide, 2.4-mile paved path along State Highway 13 between Carbondale and Murphysboro, connects with the Mud Line path. KFVS reported a ribbon cutting for the greenway set for November 17, 2025, as part of an effort to link Murphysboro, Carbondale, Carterville and Marion.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March, May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Carbondale Southern Il Airport, 3.6 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 42 47 57 68 77 86 88 87 81 70 56 46 Low °F 25 28 36 45 55 64 68 65 56 45 35 28 Precipitation, in 2.8 2.6 4.1 5.3 5 4.1 3.6 3 2.9 3.5 3.9 3.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1922 Carbondale sheet (1:62,500); the 1966 Carbondale sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Crab Orchard Greenway 1.6 mi away · 9.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17160544, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Carbondale is celebrating the completion of its newest bike path - WSIU (September 22, 2023) · organization · checked Oct 15, 2026 Supports: start on North Oakland Avenue across from the Green Earth Oakland Preserve, end at New Era Road, IDOT Transportation Enhancement Program grant, ribbon cutting September 27
- Northwest Multiuse Bike Path Phase II (New Era to Hwy 13) (CIP #OS1901) - City of Carbondale, IL · web · checked Oct 15, 2026 Supports: Phase II from New Era Road to Highway 13, design phase as of January 2026, ITEP grant of $1,213,010 received June 2025, start and completion expected 2027, paved surface, connection of Oakland Avenue to the existing bike trail at Airport Road
- Multi-use paved trail open for use in Carbondale - KFVS12 (October 3, 2023) · web · checked Oct 15, 2026 Supports: name Mudline Trail, about 1.1 miles of paved path from North Oakland Avenue to New Era Road on an old railroad bed, no motorized vehicles, city acquisition of the railroad bed west from New Era Road to the Route 13 bike tunnel, dirt and maintained by the city, paving when phase 2 funding arrives
- Ribbon cutting for new Saluki Greenway multi-use bike path set for Nov. 17 - KFVS12 (November 5, 2025) · web · checked Oct 15, 2026 Supports: Saluki Greenway 10 feet wide and 2.4 miles along State Highway 13 between Carbondale and Murphysboro, connection with the Mud Line bike path, ribbon cutting November 17, 2025, effort to connect Murphysboro, Carbondale, Carterville and Marion
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.