States › Kentucky

Muhlenberg County Rail Trail

Rail-trail in Kentucky · OpenStreetMap relation

Runs through Central City, Powderly and Greenville · Muhlenberg County

Conditions now

Loading the weather near Powderly…

Forecast by the National Weather Service for Powderly · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.8 mi 9.3 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Main Street mile 5.8 directions to trailhead 1
Central City, along the trail (opens in a new tab)
Central City, along the trail · Photo: Jan Davis Ruthig · CC BY-ND · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Muhlenberg County Rail-Trail is an asphalt rail-trail of about 6 miles in Muhlenberg County, Kentucky, linking Central City, Powderly and Greenville. Kentucky's state tourism site says the trail was completed in 2002 and describes it as the state's most extensive rails-to-trails conversion. The corridor was established by the Illinois Central Railroad in the late 1800s and carried coal from nearby mines; as the need for coal waned the line was abandoned. The Paducah and Louisville Railway was a later owner of the right of way.

For most of its length the trail runs beside U.S. 62, passing through woods, marshland and the three towns. Railroad remnants line the route, including old signal towers, mile markers, trestles and whistle signs, and an antique caboose donated by the Paducah and Louisville Railway serves as a railroad museum near the Central City trailhead. Midway along the trail a platform overlooks the water, and a birding guide produced by a local Boy Scout troop helps identify the species seen along the path.

The trail is mostly flat, with a hilly section near Powderly, and the asphalt surface is suitable for wheelchairs. Runners, cyclists, dog walkers and equestrians use it, and benches stand along the way. Parking is at both ends: the southern trailhead lot is on U.S. 62 just north of downtown Greenville, and at the north end parking is on West 3rd Street in Central City or at the convention center. This record maps about 5.8 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 99% of this route as a trail on former railroad right-of-way.

Elizabethtown & Paducah RR (P&L), built 1869, abandoned 1996. From Abandoned Railroad in Kentucky (Kentucky Transportation Cabinet, CC0).

Shade

47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rochester Ferry, 24 km from the trail's middle, 12 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444858697886898882715848
Low °F242634435261656356433427
Precipitation, in3.444.25.15.14.74.73.93.64.13.84.5
Snow, in1.31.40.50.200000001
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Central City sheet (1:62,500); the 1953 Central City West sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9736023, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Top 10 Trails in Kentucky — Rails to Trails Conservancy · organization · checked Oct 15, 2026
    Supports: Illinois Central Railroad established along the corridor in the late 1800s; 6-mile asphalt trail suitable for wheelchairs; mostly flat with a hilly section near Powderly; caboose museum at the Central City trailhead
  3. Cycling the Muhlenberg Rail Trail — Kentucky Tourism (Kentucky Department of Tourism; article originally by RootsRated) · web · checked Oct 15, 2026
    Supports: completed 2002; most extensive rails-to-trails conversion in Kentucky; 6-mile asphalt trail; line hauled coal, abandoned as need waned; parallels U.S. 62 through woods, marshland and small towns; signal towers, mile markers, trestles, whistle signs; caboose donated by Paducah and Louisville Railway, old owner of the right of way, now a railroad museum near Central City trailhead; wetland overlook platform midway; Boy Scout birding guide; Central City, Powderly, Greenville; users incl. equestrians; benches; parking on US 62 north of Greenville and on W 3rd St or at the convention center

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.