States › Maine

Narrow Gauge Pathway

Rail-trail in Maine

Runs through Carrabassett Valley · Franklin County

Conditions now

Loading the weather near Kingfield…

Forecast by the National Weather Service for Kingfield · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.9 mi 8.0 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Narrowgaugetrail.jpg (opens in a new tab)
Narrowgaugetrail.jpg · Photo: Willbike18 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Narrow Gauge Pathway is a non-motorized, four-season rail trail of the Town of Carrabassett Valley, Maine, along the Carrabassett River. It follows the bed of the two-foot-gauge Kingfield and Dead River Railroad, which the Franklin and Megantic formed in 1894 to extend rails up the Carrabassett River from Kingfield to Carrabassett. The line was extended to the sawmill at Bigelow around 1899–1900, and in 1927 the rails were removed between Bigelow Station and Huston Brook. The town built the pathway in 2001 with help from the State of Maine.

The town gives the length as about 6 miles; the mapped trail is about 4.9 miles. Trailheads with parking are at Campbell Field, the Anti-Gravity Complex and the Carrabassett Valley Town Park. The grade rises gently from the southernmost trailhead at the town office, so starts from Campbell Field or the Anti-Gravity Complex give a downhill ride out and a harder return. Along the way are picnic areas and a long bridge over wetlands and a small pond. The pathway also links the Sugarloaf Outdoor Center trails with the Maine Huts and Trails system.

The surface is gravel and crushed stone, and in winter the trail is groomed for classic and skate cross-country skiing. In May 2023 the town warned of heavy damage, with culverts and soil washed out, and on November 15, 2024 it announced that the whole trail had reopened to foot and non-motorized traffic. In October 2025 the town sought bids to clear vegetation along about 6,000 feet of the corridor.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

73% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Long Falls Dam, 15.5 km from the trail's middle, 5 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F232635476272777668544029
Low °F4514284050555346352514
Precipitation, in2.82.433.83.64.543.63.24.63.83.8
Snow, in22.722.922.27.6000002.67.223.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1928 Stratton sheet (1:48,000); the 1956 Stratton sheet (1:62,500) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Narrow Gauge Pathway — Town of Carrabassett Valley · government source · checked Oct 13, 2026
    Supports: non-motorized four-season multi-use trail, approximately 6 miles, trailheads at Campbell Field, the Anti-Gravity Complex and the Town Park, grade rising from the town office, downhill from the northern trailheads, picnic areas
  3. UPDATE! The Narrow Gauge is OPEN! — Town of Carrabassett Valley (November 15, 2024) · government source · checked Oct 13, 2026
    Supports: entire trail reopened to foot and non-motorized/electric traffic
  4. Please use caution on the Narrow Gauge Pathway 5-2-2023 — Town of Carrabassett Valley · government source · checked Oct 13, 2026
    Supports: heavy damage, washed-out culverts and soil, May 2023
  5. Invitation to Bid – Recreation Pathway Corridor Maintenance — Town of Carrabassett Valley (October 15, 2025) · government source · checked Oct 13, 2026
    Supports: vegetation clearing along about 6,000 feet of the Narrow Gauge pathway, bids due October 27, 2025
  6. Franklin and Megantic Railway — Wikipedia · organization · checked Oct 13, 2026
    Supports: two-foot gauge Kingfield and Dead River Railroad formed 1894 to extend rails up the Carrabassett River from Kingfield to Carrabassett, extension to the Bigelow (Crockertown) sawmill in 1899
  7. Origins of the Narrow Gauge Pathway — Sun Journal (November 28, 2024) · press · checked Oct 13, 2026
    Supports: Bigelow Station 1900, rails removed between Bigelow Station and Huston Brook in 1927, town project with state help in 2001
  8. Narrow Gauge Pathway — Maine Trail Finder · web · checked Oct 13, 2026
    Supports: gravel and crushed stone surface, groomed for classic and skate skiing, long bridge over wetlands and a pond, link between Sugarloaf Outdoor Center and Maine Huts and Trails

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.