States › New Hampshire

Nashua Heritage Rail Trail

Rail-trail in New Hampshire

Runs through Nashua · Hillsborough County

Conditions now

Loading the weather near Nashua…

Forecast by the National Weather Service for Nashua · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
On former railbed
1.1 mi 84%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Tenth Street mile 0.3 directions to trailhead 1
  2. Parking at Pine Street mile 0.9 directions to trailhead 2
  3. Parking at West Hollis Street mile 0.9 directions to trailhead 3
  4. Parking at Palm Street mile 1 directions to trailhead 4
  5. Parking at Chestnut Street mile 1.1 directions to trailhead 5
  6. City Hall Parking Lot mile 1.2 directions to City Hall Parking Lot
  7. Maple Street Parking Lot mile 1.3 directions to Maple Street Parking Lot
  8. Parking at Garden Street mile 1.3 directions to trailhead 8
  9. Parking at West Hollis Street mile 1.3 directions to trailhead 9
  10. Parking at West Hollis Street mile 1.3 directions to trailhead 10
  11. Parking at Eldridge Street mile 1.3 directions to trailhead 11
  12. Parking at East Hollis Street mile 1.3 directions to trailhead 12
  13. Parking at Garden Street mile 1.3 directions to trailhead 13
Nashua Heritage Rail Trail, Nashua NH.jpg (opens in a new tab)
Nashua Heritage Rail Trail, Nashua NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Nashua Heritage Rail Trail is a paved rail trail of about 1.3 miles in Nashua, New Hampshire, running east–west across the south side of the city from beside City Hall on Main Street toward Mine Falls Park. The Nashua Telegraph describes it as part of the 45.3-mile rail corridor that once ran from central Massachusetts to Nashua, the corridor the Nashua River Rail Trail also follows. That line was the Worcester and Nashua Railroad, organized in 1845, which reached Nashua in December 1848 and was leased by the Boston and Maine in 1886; in 1942 the line was cut back from Hollis to about a mile from Nashua's Union Station, and the last mile of track, between Union Station and an industrial park, was abandoned in 1993.

From downtown the trail heads west, crossing many streets that a trail guide describes as well signed and not busy. A short path connects it to Mine Falls Park, a 300-acre park with trails along a canal and the Nashua River. The Nashua River Rail Trail begins in the southern part of the city and runs to Ayer, Massachusetts.

The surface is smooth asphalt with almost no grade, and the Telegraph reports that many residents use the trail year-round for recreation and as a shortcut. Free parking is available at several places near the trail, including nearby sports facilities. A planned extension, the Nashua Heritage Rail Trail East, would build a 10-foot-wide paved path along the former rail line from Main Street to the Denton Street intersection, with accessible crossings, lighting and restoration of the Commercial Street Bridge; in January 2024 it was in preliminary design, with construction scheduled for 2026–2027.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Worcester - Nashua- Rochester, Hollis Branch and Worcester - Nashua - Rochester. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Nashua 2 NNW, 4.1 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343745587078848375635140
Low °F141523344656615951393021
Precipitation, in3.43.24.34.23.94.33.63.944.83.94.5
Snow, in14.714.510.10.70000001.711.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Manchester sheet (1:62,500); the 1968 Nashua North sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Worcester and Nashua Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: organized 1845; reached Nashua December 1848; B&M lease 1886; 1942 cutback from Hollis to about a mile from Union Station; last mile between Union Station and an industrial park abandoned 1993; Nashua River Rail Trail on its right of way
  3. A look at rail trails: N.H. Senate OKs establishment of advisory committee — The Nashua Telegraph · press · checked Oct 13, 2026
    Supports: about 1.3 miles; begins beside City Hall on Main Street; part of the 45.3-mile corridor from central Massachusetts to Nashua shared with the Nashua River Rail Trail; year-round use; Nashua River Rail Trail from southern Nashua to Ayer
  4. Nashua Heritage Rail Trail, NH — Trailspotting · web · checked Oct 13, 2026
    Supports: east–west route on the south side of the city; smooth asphalt, no discernible grade; many well-signed, quiet crossings; short path to 300-acre Mine Falls Park; free parking including sports facilities; Heritage Rail Trail East plan and 2026/2027 construction schedule

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.