States › Pennsylvania

Naylor's Run Trail

Rail-trail in Pennsylvania · OpenStreetMap relation

Runs through Upper Darby Township · Delaware County

Conditions now

Loading the weather near Lansdowne…

Forecast by the National Weather Service for Lansdowne · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
0.8 mi 1.3 km1
On former railbed
0.5 mi 62%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Marshall Road mile 0.3 directions to trailhead 1
  2. Parking at East Marshall Road mile 0.3 directions to trailhead 2
  3. Parking at Powelton Avenue mile 1 directions to trailhead 3
Upper Darby, along the trail (opens in a new tab)
Upper Darby, along the trail · Photo: Mtruch · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Naylor's Run Trail is a multi-use trail being built in stages in Upper Darby Township, Delaware County, Pennsylvania, on the former Newtown Square Branch, a local freight line of the Pennsylvania Railroad. PECO owns the right-of-way, having placed power lines along the branch while the railroad still operated. The township's April 2011 feasibility study, funded in part by a PECO Green Region Grant, laid out a trail of about 2.25 miles from Manor Avenue in the north to Baltimore Pike in the south, costed as a 10-foot-wide paved path. It found the former railbed used by adjacent property owners in places, five missing railroad bridges over Naylor's Run, and a removed railroad bridge at Marshall Road, where a 10-foot concrete abutment blocks access from the road.

In a February 2024 update, Upper Darby reported Sections 7 and 8, about three-quarters of a mile, completed in summer 2023, connecting with the Cardington Branch, the Cobbs Creek Trail and Philadelphia. In the study, Segment 7 runs from the Marshall Road area to the Glenwood Avenue area north of Chapman Park and Segment 8 from there to Baltimore Pike. The trail belongs to the Circuit Trails, the Philadelphia region's network of more than 800 miles of multi-use trails. North of Garrett Road, an informal walking trail runs on the old railbed under the power lines from Monroe Avenue to Cedar Lane.

In 2024 the Delaware Valley Regional Planning Commission's Regional Trail Program awarded the township $200,000 to design a pedestrian bridge over Marshall Road, where trail users cross at a signalized intersection; it would link to about half a mile of existing trail toward 1.2 miles without road crossings. Section 6 was half funded through DCNR, and the full corridor awaited a Reconnecting Communities grant, a PECO agreement and preliminary engineering.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Phila Franklin Inst, 8 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424554667685898780685646
Low °F283036465666717063514133
Precipitation, in3.63.34.544.14.84.854.94.23.44.3
Snow, in6.4420.10000000.13.5
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Chester sheet (1:62,500); the 1956 Lansdowne sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 20299361, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. New Funding to Grow Circuit Trails — Pennsylvania Environmental Council (August 29, 2024) · organization · checked Oct 14, 2026
    Supports: DVRPC Regional Trail Program, $200,000 to Upper Darby for design and engineering of a pedestrian bridge over Marshall Road, signalized crossing, half a mile of existing trail, 1.2 miles without road crossings
  4. Naylor's Run Trail Feasibility Study (April 2011) — Upper Darby Township · web · checked Oct 14, 2026
    Supports: 2.25 miles, Manor Avenue to Baltimore Pike, former railroad bed owned by PECO, PECO Green Region Grant, encroachments, five missing bridges over Naylor's Run, removed bridge and 10-foot abutment at Marshall Road, 10-foot-wide paved surface, Segments 7 and 8 limits
  5. Upper Darby Trails — DelCo Trails Alliance Update, February 10, 2024 (Upper Darby Township, via havtrail.com) · web · checked Oct 14, 2026
    Supports: Sections 7-8 completed summer 2023, about 3/4 mile, connections to the Cardington Branch, Cobbs Creek Trail and Philadelphia; Circuit Trails 800+ miles; Section 6 50% funded through DCNR; corridor awaiting Reconnecting Communities grant, PECO agreement, preliminary engineering
  6. Plans and Studies Relevant to Upper Darby — Friends of U.D. Trails · web · checked Oct 14, 2026
    Supports: Newtown Square Branch was a local freight line of the old Pennsylvania Railroad; PECO owns the right-of-way and placed power lines along it while the railroad operated; 2011 feasibility study
  7. Trails in Upper Darby Township and Vicinity — Friends of U.D. Trails · web · checked Oct 14, 2026
    Supports: informal walking trail under the electric towers on the old Newtown Square Branch railbed from Monroe Avenue to Cedar Lane

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.