States › North Carolina

NC 55 Streetside Trail

Greenway in North Carolina

Runs through Cary · Wake County

Conditions now

Loading the weather near Cary…

Forecast by the National Weather Service for Cary · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Parkscene Lane mile 0.4 directions to trailhead 1
  2. Parking at Parkscene Lane mile 0.4 directions to trailhead 2
  3. Parking at Parkscene Lane mile 0.4 directions to trailhead 3
  4. Parking at Wellesley Trade Lane mile 0.7 directions to trailhead 4
  5. Parking at Wellesley Trade Lane mile 0.7 directions to trailhead 5
  6. Parking at Connemara Drive mile 0.9 directions to trailhead 6
  7. Parking at Connemara Drive mile 1 directions to trailhead 7
  8. Parking at Connemara Drive mile 1 directions to trailhead 8
NC 55 Streetside Trail (opens in a new tab)
Photo: hamzakhan · CC BY-SA 4.0 · Mapillary

About this trail

The NC 55 Street-Side Trail is a paved shared-use path beside NC 55 in western Cary, North Carolina. It is not a rail-trail. The Town of Cary's greenway inventory lists it in pieces on both sides of the highway: on the east side, an 8-foot concrete path from the White Oak Creek Greenway to Parkscene Lane, largely built by the town; on the west side, 8- to 10-foot concrete and asphalt sections built by developers as land along the road was developed, with completion dates from 2015 to 2026. The town owns and maintains the built segments. Several gaps remain listed as proposed, including stretches north of Morrisville Parkway toward Good Hope Church Road and from Green Hope School Road to Army property.

TrailLink describes the trail as about 1 mile of asphalt and concrete linking the Batchelor Branch Greenway to the north with the White Oak Creek Greenway to the south, with no dedicated parking. OpenStreetMap maps about 1.3 miles under the NC 55 Streetside Trail name, designated for bicycles and pedestrians.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Apex, 6.4 km from the trail's middle, 31 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F515462727986898782726254
Low °F313339485765696862504034
Precipitation, in3.634.13.63.84.35.14.65.33.73.53.7
Snow, in2.910.400000000.30.2
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: NC 55 Streetside Trail (opens in a new tab)
  1. 360° view 1 of 2, photo by hamzakhan
  2. 360° view 2 of 2, photo by hamzakhan
360° panorama · Photo: hamzakhan · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenway Trails Existing and Proposed — Town of Cary Open Data · organization · checked Oct 17, 2026
    Supports: NC 55 Street-Side Trail (East) White Oak Greenway to Parkscene Lane, 8-ft concrete, built by Cary; West segments built by developers, 8-10 ft concrete and asphalt, dates 2015-2026; owned and maintained by Cary; proposed segments Morrisville Pkwy north to Good Hope Church Rd and Green Hope School Rd to Army property
  3. NC-55 Street-side Trail — TrailLink · web · checked Oct 17, 2026
    Supports: about 1 mile; asphalt and concrete; Batchelor Branch Greenway to White Oak Creek Greenway; no dedicated parking
  4. NC 55 Streetside Trail — OpenStreetMap way 113312675 (one of the record's ways) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: name as mapped; bicycle and foot designated; mapped length about 1.3 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.