NC 55 Streetside Trail
Greenway in North Carolina
Runs through Cary · Wake County
Conditions now
Loading the weather near Cary…
Forecast by the National Weather Service for Cary · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Parkscene Lane mile 0.4 directions to trailhead 1
- Parking at Parkscene Lane mile 0.4 directions to trailhead 2
- Parking at Parkscene Lane mile 0.4 directions to trailhead 3
- Parking at Wellesley Trade Lane mile 0.7 directions to trailhead 4
- Parking at Wellesley Trade Lane mile 0.7 directions to trailhead 5
- Parking at Connemara Drive mile 0.9 directions to trailhead 6
- Parking at Connemara Drive mile 1 directions to trailhead 7
- Parking at Connemara Drive mile 1 directions to trailhead 8
(opens in a new tab) About this trail
The NC 55 Street-Side Trail is a paved shared-use path beside NC 55 in western Cary, North Carolina. It is not a rail-trail. The Town of Cary's greenway inventory lists it in pieces on both sides of the highway: on the east side, an 8-foot concrete path from the White Oak Creek Greenway to Parkscene Lane, largely built by the town; on the west side, 8- to 10-foot concrete and asphalt sections built by developers as land along the road was developed, with completion dates from 2015 to 2026. The town owns and maintains the built segments. Several gaps remain listed as proposed, including stretches north of Morrisville Parkway toward Good Hope Church Road and from Green Hope School Road to Army property.
TrailLink describes the trail as about 1 mile of asphalt and concrete linking the Batchelor Branch Greenway to the north with the White Oak Creek Greenway to the south, with no dedicated parking. OpenStreetMap maps about 1.3 miles under the NC 55 Streetside Trail name, designated for bicycles and pedestrians.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Apex, 6.4 km from the trail's middle, 31 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 51 54 62 72 79 86 89 87 82 72 62 54 Low °F 31 33 39 48 57 65 69 68 62 50 40 34 Precipitation, in 3.6 3 4.1 3.6 3.8 4.3 5.1 4.6 5.3 3.7 3.5 3.7 Snow, in 2.9 1 0.4 0 0 0 0 0 0 0 0.3 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
Nearby trails
- White Oak Creek Greenway within 0.2 mi · 5.4 mi, paved
- Morrisville Parkway Streetside Trail within 0.2 mi · 2.4 mi, paved
- Green Hope School Greenway 0.4 mi away · 1.9 mi, paved
- Panther Creek Greenway 0.6 mi away · 2.4 mi, paved
- Highcroft Drive Streetside Trail 0.7 mi away · 1.5 mi, paved
- Morris Branch Greenway 1.1 mi away · 2.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenway Trails Existing and Proposed — Town of Cary Open Data · organization · checked Oct 17, 2026 Supports: NC 55 Street-Side Trail (East) White Oak Greenway to Parkscene Lane, 8-ft concrete, built by Cary; West segments built by developers, 8-10 ft concrete and asphalt, dates 2015-2026; owned and maintained by Cary; proposed segments Morrisville Pkwy north to Good Hope Church Rd and Green Hope School Rd to Army property
- NC-55 Street-side Trail — TrailLink · web · checked Oct 17, 2026 Supports: about 1 mile; asphalt and concrete; Batchelor Branch Greenway to White Oak Creek Greenway; no dedicated parking
- NC 55 Streetside Trail — OpenStreetMap way 113312675 (one of the record's ways) — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: name as mapped; bicycle and foot designated; mapped length about 1.3 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.