New River Linear Trail
Rail-trail in South Carolina
Runs through Bluffton · Beaufort County
Conditions now
Loading the weather near Bluffton…
Forecast by the National Weather Service for Bluffton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Tanners Run mile 1.8 directions to trailhead 1
- Parking at Heritage Parkway mile 2.2 directions to trailhead 2
- Parking at Heritage Parkway mile 2.2 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The New River Linear Trail is a rail-trail in Bluffton, South Carolina, owned and being rebuilt by the Town of Bluffton. It follows a corridor on which the Seaboard Air Line Railway ran trains about a century ago.
The trail runs about 3.2 miles between the New River and Sun City Hilton Head, and this record maps about the same distance. The town lists its trailhead at 3829 Okatie Highway; the Post and Courier reports that Bluffton opened a parking area for the trail in 2005. The route passes hardwood forest and swamp and runs beside an old rice field along the New River, with wildlife common along the way.
The trail has been unpaved. The state Department of Parks, Recreation and Tourism passed a $2,000,000 earmark to the town for ADA accessibility improvements on the trail; in June 2024 the town reported that permits were still pending, partly because of nearby high-voltage power lines, and estimated completion by September 30, 2026. In March 2025 the town sought bids for surface improvements, pier construction and bridge reconstruction on the trail, as phases 1 and 2 of the work, and in June 2025 town officials approved a $4.1 million contract to pave and refurbish it, over objections from some residents who wanted it left unpaved. By July 2025 the entrances were taped off with construction notices. Whether the work is finished and the trail reopened was not confirmed in this check.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Savannah International Airport, 23.7 km from the trail's middle, 13 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 61 65 71 78 85 90 92 91 86 79 70 64 Low °F 40 43 49 55 63 71 74 73 69 59 48 43 Precipitation, in 3.3 2.8 3.5 3.4 3.6 6.7 5.8 5.5 4.3 3.7 2.4 3.2 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1920 Bluffton sheet (1:62,500); the 1955 Pritchardville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- New River Trail Construction Improvements Phases 1 and 2 — South Carolina Business Opportunities (SCBO) · government source · checked Oct 16, 2026 Supports: Town of Bluffton as owner; bids for surface improvements, pier construction and bridge reconstruction on the New River Trail between the New River and Sun City Hilton Head; trailhead at 3829 Okatie Highway; 2025 bid walk
- New River Linear Trail (July 11, 2025) — The Post and Courier · press · checked Oct 16, 2026 Supports: Seaboard Air Line Railway ran trains on the corridor about a century ago; 3.2-mile trail beside a rice field and along the New River; hardwood forest, swamp, wildlife; parking area opened 2005; unpaved; $4.1 million contract to pave and refurbish approved June 2025; resident objections; entrances taped off with construction notice in July 2025
- Town of Bluffton — New River Linear Trail, State of South Carolina Fiscal Year Spending Report — SC Department of Parks, Recreation and Tourism · web · checked Oct 16, 2026 Supports: $2,000,000 earmark from SC PRT for New River Linear Trail ADA accessibility improvements, Phase I; as of June 28, 2024, no funds spent, permits pending (proximity to high-voltage lines, coastal zone consistency certification); estimated completion September 30, 2026
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.