New Ulm Bike Circle Route
Greenway in Minnesota
Runs through Milford Township and New Ulm · Brown County
Conditions now
Loading the weather near New Ulm…
Forecast by the National Weather Service for New Ulm · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Westridge Road mile 0.1 directions to trailhead 1
- Parking at North Highland Avenue mile 0.3 directions to trailhead 2
- Parking at Karl Drive mile 0.4 directions to trailhead 3
- Parking at North Highland Avenue mile 0.4 directions to trailhead 4
- Parking at 23rd North Street mile 1 directions to trailhead 5
- Parking at 21st North Street mile 2.2 directions to trailhead 6
- Parking at 21st North Street mile 2.3 directions to trailhead 7
- Parking at North Front Street mile 3.3 directions to trailhead 8
- Trail Parking mile 4.1 directions to Trail Parking
- Parking at 6th North Street mile 4.1 directions to trailhead 10
- Parking at 3rd North Street mile 4.4 directions to trailhead 11
- Parking at North Valley Street mile 4.4 directions to trailhead 12
- Parking at 3rd North Street mile 4.4 directions to trailhead 13
- Parking at 2nd North Street mile 4.5 directions to trailhead 14
- Parking at 3rd North Street mile 4.5 directions to trailhead 15
- Parking at 3rd North Street mile 4.5 directions to trailhead 16
- Parking at 1st South Street mile 4.8 directions to trailhead 17
- Parking at South German Street mile 6.3 directions to trailhead 18
- Parking at 19th South Street mile 6.3 directions to trailhead 19
- Parking at South German Street mile 6.4 directions to trailhead 20
- Parking at South German Street mile 6.4 directions to trailhead 21
- Parking at South Bridge Street mile 6.4 directions to trailhead 22
- Parking at 20th South Street mile 6.5 directions to trailhead 23
- Parking at 20th South Street mile 6.5 directions to trailhead 24
- Parking at South Minnesota Street mile 6.5 directions to trailhead 25
- Parking at 2000 South mile 6.6 directions to trailhead 26
- Parking at 2000 South mile 6.6 directions to trailhead 27
- CROSS directions to CROSS
- CROSS directions to CROSS
- CROSS (Faculty/Staff) directions to CROSS (Faculty/Staff)
- CROSS Chapel/Commuter directions to CROSS Chapel/Commuter
- CROSS Visitor & Event Parking directions to CROSS Visitor & Event Parking
- FOOTBALL directions to FOOTBALL
- Handicapped directions to Handicapped
- Staff/Cafeteria directions to Staff/Cafeteria
- Parking at Waldheim Drive directions to trailhead 36
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The New Ulm Bike Circle Route is a loop around the city of New Ulm in Brown County, Minnesota. Explore Minnesota lists it as a 13-mile (21 km) loop on a paved recreation trail that is well marked and has several benches. The New Ulm Journal described it in July 2025 as a 12-mile (19 km) loop around the city, with half on dedicated pathway and the other half on shared road space.
The loop passes the Minnesota River, a few city parks and some farmland. The Hermann Monument, Schell's Brewery, the historic downtown, the Glockenspiel and Flandrau State Park are blocks off the trail, and a map is available at the Visitors Center at 1 North Minnesota Street. In July 2025 installation began on a new bike and pedestrian path segment behind the former Target building, running from 18th South Street through a portion of South Park and the Target parking lots to 20th South Street. The easement for the path, held by New Ulm, dates from 1998, and the path there was never paved or marked until 2025.
This record maps about 6.7 miles (10.7 km) in four pieces. OpenStreetMap tags them as cycleways, most designated for bicycles, with asphalt and concrete surfaces and a tunnel segment.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
New Ulm 2 SE, 3.4 km from the trail's middle, 22 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 29 41 57 69 79 82 80 73 60 43 28 Low °F 7 11 24 36 48 59 62 60 52 39 26 13 Precipitation, in 0.7 0.9 1.6 2.9 4.1 5 4.1 3.7 3.3 2.4 1.5 0.9 Snow, in 7.8 6.9 6 1.5 0.1 0 0 0 0 0.5 6.5 9 - On the National Register
- Chicago and North Western Railroad Depot, New Ulm · building, listed 1979 · nomination file for Chicago and North Western Railroad Depot
- Flandrau State Park CCC/WPA/Rustic Style Historic Resources, New Ulm · historic district, listed 1989 · nomination file for Flandrau State Park CCC/WPA/Rustic Style Historic Resources
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 New Ulm sheet (1:250,000); the 1964 New Ulm sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Extending the path — The Journal (New Ulm), July 9, 2025 · press · checked Oct 31, 2026 Supports: 12-mile loop around New Ulm, half on dedicated pathway and half on shared road spaces; installation of a new segment began in July 2025 behind the former Target building, from 18th S. Street through a portion of South Park and the Target parking lots to 20th S. Street; New Ulm holds the easement, put in place in 1998; path never paved or marked until this year
- Bike Circle Route — Explore Minnesota · web · checked Oct 31, 2026 Supports: 13-mile loop around New Ulm; paved recreation trail, well marked, with several benches; passes the Minnesota River, a few city parks and some farm land; Hermann Monument, Schell's Brewery, Historic Downtown, Glockenspiel and Flandrau State Park blocks off the trail; map at the Visitors Center, 1 N Minnesota St
- New Ulm Bike Circle Route — OpenStreetMap way 200529294 · web · checked Oct 31, 2026 Supports: cycleway designated for bicycles, asphalt surface; the same name on way 454415107, a paved tunnel segment, and on concrete segments (most designated for bicycles)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.