States › California

Newhall Ranch Road Path

Greenway in California

Runs through Santa Clarita · Los Angeles County

Conditions now

Loading the weather near Santa Clarita…

Forecast by the National Weather Service for Santa Clarita · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.0 mi 4.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Newhall Ranch Road mile 1.3 directions to trailhead 1
  2. Parking at Newhall Ranch Road mile 1.5 directions to trailhead 2
  3. Parking at Newhall Ranch Road mile 2.5 · restrooms directions to trailhead 3
Santa Clarita, along the trail (opens in a new tab)
Santa Clarita, along the trail · Photo: Jeffrey Beall · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Newhall Ranch Road Path is the name OpenStreetMap gives to the paved bicycle and pedestrian path beside Newhall Ranch Road, a major arterial in Santa Clarita, Los Angeles County, California. The City of Santa Clarita counts about 80 miles of trails and 20 miles of paseos for commuting and recreation, with the Santa Clara River trail as the backbone of the system. The city defines a Class I bike path as a completely separated right of way for bicycles and pedestrians, and opens its Class I trails from sunrise to 10 p.m.; motorized vehicles are prohibited and dogs must be leashed.

This record maps about 3.0 miles. The line follows Newhall Ranch Road for about 1.4 miles from Vanderbilt Way east to Copper Hill Drive and Rye Canyon Road, continues about 0.8 mile from there to Avenue Tibbitts and Dickason Drive, and then runs about half a mile across San Francisquito Creek to McBean Parkway, with a short link down to the creek trail. The line has only a short break near Copper Hill Drive. OpenStreetMap shows asphalt and concrete surfaces and signalized crossings at Copper Hill Drive and McBean Parkway.

The creek crossing comes from the city's Newhall Ranch Road Bridge Widening Project, which widened the bridge on its south side to carry eight through lanes between Avenue Tibbitts/Dickason Drive and McBean Parkway and added a combined 16-foot Class I bike trail and sidewalk on the south side of the bridge. The project also connected the west side of the San Francisquito Creek Trail under the bridge. Work on the $16 million project began in May 2017, with completion expected by October 2018.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Newhall 5nw, 5.7 km from the trail's middle, 198 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F636570748187949691817162
Low °F474547495457636462564944
Precipitation, in4.24.42.90.80.30000.10.50.82.6
Snow, in0.100000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Santa Susana sheet (1:62,500); the 1952 Newhall sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Santa Clarita Trails — Parks Division · government source · checked Oct 16, 2026
    Supports: about 80 miles of trails and 20 miles of paseos, river trail as backbone, Class I definition, Class I trail hours sunrise to 10 p.m., no motorized vehicles, dogs leashed
  3. Newhall Ranch Road Bridge Widening Project — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026
    Supports: City of Santa Clarita lead agency; widening to eight through lanes between Avenue Tibbitts/Dickason Drive and McBean Parkway, south side only; combined 16-foot Class I bike trail and sidewalk on the south side; San Francisquito Creek Trail connection under the bridge
  4. Newhall Ranch Road Bridge Widening Begins — SCVNews.com · press · checked Oct 16, 2026
    Supports: construction start May 2017, $16 million cost, protected sidewalk and bike path on the south side, completion expected October 2018
  5. OpenStreetMap ways named Newhall Ranch Road Path — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: trail name, mapped pieces and their end streets, short break near Copper Hill Drive, surfaces, signalized crossings

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.