Newport/Dover-Foxcroft Rail Trail
Rail-trail in Maine
Runs through Dover-Foxcroft, Sangerville, Dexter, Corinna and Newport · Piscataquis and Penobscot counties
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Dwelley Avenue mile 0.4 directions to trailhead 1
- Parking at Church Street mile 14.2 directions to trailhead 2
- Parking at Main Street mile 28.7 directions to trailhead 3
- Parking at Main Street mile 28.7 directions to trailhead 4
- Parking at Main Street mile 28.7 directions to trailhead 5
- Parking at Main Street mile 28.8 directions to trailhead 6
- Parking at Main Street mile 28.8 directions to trailhead 7
- Parking at Main Street mile 28.8 directions to trailhead 8
- Parking at Main Street mile 28.8 directions to trailhead 9
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Newport/Dover-Foxcroft Rail Trail, also known as the Four Seasons Adventure Trail, is a 29.0-mile multi-use trail in Penobscot and Piscataquis counties, Maine, running from Route 7 in Newport to Fairview Street in Dover-Foxcroft; the Natural Resources Council of Maine gives its length as 27 miles. It follows the former Dexter and Newport Railroad, completed in 1868 north from Newport Junction on the Maine Central main line to Dexter and then leased to the Maine Central. An extension from Dexter north to Foxcroft on the Piscataquis River was completed in 1889 as the Dexter and Piscataquis Railroad. The branch was a major pulpwood loading point through the 1970s and was abandoned in 1990; the rails and ties were removed in 1993.
After the rails came out, local residents began using the corridor, and the state negotiated with the landowners to buy it while public use continued. A grant from the Land for Maine's Future program, with community contributions, secured the trail. In September 2004 Senators Olympia Snowe and Susan Collins announced a $138,074 Land and Water Conservation Fund grant, awarded by the Bureau of Parks and Lands under the National Park Service, toward acquiring 11.3 miles of the abandoned railroad between Newport and Dover-Foxcroft. The corridor covers 260 acres.
From Newport the route runs north through Corinna and Dexter to Dover-Foxcroft, the former railroad's stations at mileposts 7.0, 15.3 and 29.5. It passes farms and forest and skirts the shores of Sebasticook, Corundel and Wassookeag lakes. The surface is gravel and dirt on near-level grades. Permitted uses include hiking, biking, mountain biking, horseback riding, wildlife watching, snowshoeing, cross-country skiing, walking dogs on a leash, ATV riding and snowmobiling. Four area snowmobile clubs have maintained the bridges and groomed the trail each winter.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 28% of this route as a trail on former railroad right-of-way.
- Shade
61% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Corinna, 12.5 km from the trail's middle, 43 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 28 32 41 54 67 75 80 80 72 59 46 34 Low °F 6 7 18 31 42 52 58 56 48 37 27 16 Precipitation, in 3.4 2.8 3.4 3.8 3.6 4 3.2 3.6 3.6 4.8 4.1 4.3 Snow, in 16.6 17.2 13.4 3.4 0 0 0 0 0 0.3 4.1 16.5 - On the National Register
- Bank Block, Dexter · building, listed 1999 · nomination file for Bank Block
- Old maps
USGS topographic maps of the trail's middle go back to the 1933 Guilford sheet (1:62,500); the 1954 Millinocket sheet (1:250,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Maine
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Snowe, Collins Announce Nearly $140,000 in Rail Trail Acquisition — U.S. Senator Susan Collins (September 24, 2004) · government source · checked Oct 13, 2026 Supports: $138,074 Land and Water Conservation Fund grant awarded by the Bureau of Parks and Lands under the National Park Service to acquire 11.3 miles of abandoned railroad from Newport to Dover-Foxcroft
- Newport/Dover-Foxcroft Rail Trail — Natural Resources Council of Maine · organization · checked Oct 13, 2026 Supports: also known as Four Seasons Adventure Trail; 27 miles; Route 7 in Newport to Fairview Street in Dover-Foxcroft; rails and ties removed in 1993 from the old Maine Central line; residents' use and state negotiation to buy; Land for Maine's Future grant with community contributions; 260 acres; Penobscot and Piscataquis counties; farms, forests and Sebasticook, Corundel and Wassookeag lakes; gravel/dirt, near level; permitted uses; four snowmobile clubs maintaining bridges and grooming
- Dexter and Newport Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: completed 1868 from Newport Junction to Dexter and leased to the Maine Central; 1889 extension to Foxcroft as the Dexter and Piscataquis Railroad; pulpwood loading point through the 1970s; abandoned 1990; stations at Corinna (milepost 7.0), Dexter (15.3), Dover and Foxcroft (29.5)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.