North Columbia Boulevard Path
Greenway in Oregon
Runs through Portland · Multnomah County
Conditions now
Loading the weather near Portland…
Forecast by the National Weather Service for Portland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The North Columbia Boulevard Path is a paved shared path of about 1.4 miles beside North Columbia Boulevard in north Portland, Oregon. The name and surface come from OpenStreetMap, which maps its segments as paved paths designated for bicycles and pedestrians, with marked and signalized crossings, and a separate concrete sidewalk of the same name.
Portland Parks and Recreation says Columbia Boulevard is a corridor the Portland Bureau of Transportation has identified as a high-crash corridor. The city is designing a grade-separated bicycle and pedestrian bridge over the boulevard at Chimney Park as part of the North Portland Greenway, linking Pier Park and Chimney Park with St. Johns Prairie, the Smith and Bybee Wetlands Natural Area and Kelly Point Park. Its project page lists construction from spring 2027 to summer 2028.
No manager page for this specific path was found, and the sources do not say whether the bridge project changes it.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
27% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Vancouver Pearson Airport, 5 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 51 56 61 68 74 81 82 76 64 53 46 Low °F 34 35 38 42 48 53 57 57 52 45 39 35 Precipitation, in 5.3 3.8 4 2.9 2.5 1.6 0.4 0.5 1.4 3.4 5.5 6.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1897 Portland sheet (1:62,500); the 1954 Portland sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Peninsula Crossing Trail within 0.2 mi · 2.2 mi, paved
- Marine Drive Trail 1.1 mi away · 16.1 mi, paved
- North Portland Greenway Trail 1.4 mi away · 2.7 mi, paved
- Lewis & Clark Discovery Greenway Trail 2.5 mi away · 5.5 mi, paved · Washington
- Columbia Riverfront Renaissance Trail 2.5 mi away · 3.4 mi, paved · Washington
- Rivergate Trail 2.6 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Bridge over Columbia Boulevard - Portland Parks & Recreation · government source · checked Oct 17, 2026 Supports: bridge project, route Pier Park to St. Johns Prairie, schedule
- PP&R receives Metro funding for three projects - Portland Parks & Recreation · government source · checked Oct 17, 2026 Supports: high crash corridor, North Portland Greenway, Chimney Park to Cathedral Park
- OpenStreetMap ways named North Columbia Boulevard Path · web · checked Oct 17, 2026 Supports: name, paved surface, bicycle and foot designation, crossings, concrete sidewalk
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.