States › Indiana

North Judson Erie Trail

Rail-trail in Indiana · OpenStreetMap relation

In Starke County

Conditions now

Loading the weather near Bass Lake…

Forecast by the National Weather Service for Bass Lake · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The North Judson Erie Trail is a multi-use rail trail located in North Judson, Indiana. The trail was established in partnership with Prairie Trails Club and follows the former JK Line Railroad. The North Judson Erie Trail is part of the American Discovery Trail System.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
11.2 mi 18.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. North Judson Trailhead mile 0 directions to North Judson Trailhead
  2. North Judson Erie Trail Trailhead mile 1.1 directions to North Judson Erie Trail Trailhead
  3. US 35 Trailhead mile 9 directions to US 35 Trailhead
Trail access 9853 (opens in a new tab)
Trail access 9853 · Photo: Chris Light · CC BY-SA · Wikimedia Commons

About this trail

The North Judson Erie Trail, called the Erie Trail by the group that maintains it, is a paved multi-use rail-trail in Starke County, Indiana, running eleven miles southeast from North Judson to Starke County Road 700 East near Bass Lake. It occupies a 100-foot-wide railbanked corridor of the former Erie Lackawanna Railroad, which Wikipedia and the Hoosier Valley Railroad Museum identify as the former JK Line Railroad. The Prairie Trails Club, an all-volunteer 501(c)(3) nonprofit with no paid staff, supports and maintains the trail. In 2008 the Town of North Judson received a $450,000 grant from Governor Mitch Daniels to build a North Judson–Monterey trail.

The western trailhead is in North Judson just west of the intersection of Main and Simmons streets, and the Hoosier Valley Railroad Museum serves as a trailhead. From town the trail heads southeast, crossing State Road 39/10 and Range Road, passing through unincorporated Aldine and crossing U.S. 35 south of Bass Lake before ending on S 700 E just north of E 900 S in Ora. Parking is available at SR 39/10 and S 250 W in North Judson and off U.S. 35 between E 800 S and E 850 S at Bass Lake.

The Erie Trail is part of the Great American Rail-Trail, the northern branch of the American Discovery Trail and U.S. Bike Route 35. Motor vehicles are prohibited except qualified e-bikes and emergency, maintenance or ADA-approved use. A separate unpaved equestrian trail shares the corridor from Starke County Road 100 West to Road 700 East. Starke County has approved five paved share-the-road connectors to the trail. Another mile is under construction in North Judson, where the Erie Trail will continue north as the Grand Kankakee Marsh Trail. A separate Monterey Erie Trail lies on the same corridor in Monterey, and plans call for linking the two into a 16-mile corridor.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Knox Wwtp, 12.4 km from the trail's middle, 7 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323547607180828174634937
Low °F161828384959626052423222
Precipitation, in2.72.42.53.84.54.74.34.53.53.63.22.6
Snow, in9.77.53.40.200000025.7
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Chicago sheet (1:250,000); the 1962 Denham sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9715963, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “North Judson Erie Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q139073470, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Prairie Trails Club | Non-Profit Charitable Trail Club | Indiana, USA · organization · checked Oct 15, 2026
    Supports: Erie Trail extends eleven miles southeast from North Judson to Starke County Road 700 East near Bass Lake; 100-foot railbanked corridor of the former Erie Lackawanna Railroad; Prairie Trails Club 501(c)(3), no paid staff, volunteers; paved; separate unpaved equestrian trail from Road 100 West to 700 East; motor vehicles prohibited except qualified e-bikes, emergency, maintenance, ADA; part of Great American Rail-Trail, northern branch of American Discovery Trail, US Bike Route 35; five share-the-road connectors approved by county commissioners; another mile under construction in North Judson to become the Grand Kankakee Marsh Trail
  5. North Judson Erie Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: former JK Line Railroad; 2008 $450,000 grant from Governor Mitch Daniels to the Town of North Judson; western trailhead west of Main and Simmons; crosses SR 39/10, Range Road, Aldine, US 35 south of Bass Lake; eastern trailhead on S 700 E north of E 900 S in Ora; 12 road crossings and six ditches; parking at SR 39/10 and S 250 W and off US 35 between E 800 and 850 S
  6. Trails & Recreation — Hoosier Valley Railroad Museum · organization · checked Oct 15, 2026
    Supports: railbanked right-of-way of the former JK Line Railroad; separate Monterey Erie Trail on the same corridor; plans to connect into a 16-mile corridor; museum is a trailhead; Kankakee sand country, oak groves, sand prairies; trail mostly away from major roads

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.