States › Ohio

Norwlak Multi-Use Path

Greenway in Ohio · OpenStreetMap relation

Runs through Norwalk · Huron County

Conditions now

Loading the weather near Norwalk…

Forecast by the National Weather Service for Norwalk · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Akron Road mile 1.1 directions to trailhead 1
Norwalk, along the trail (opens in a new tab)
Norwalk, along the trail · Photo: User:OHWiki · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Norwlak Multi-Use Path is a paved path of about 1.7 miles in Norwalk, Huron County, Ohio. Its name comes from an OpenStreetMap bicycle route created in August 2025; the name as tagged spells the city "Norwlak". OpenStreetMap maps the path as asphalt and concrete sections designated for bicycles and walkers, running from Gallup Avenue southeast to Akron Road, past the Norwalk Area Contractors Park, with a short tunnel and several road crossings. Parking is mapped near the Akron Road end. No city or county page describing the path, its builder or its opening date was found.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Norwalk Wwtp, 2.2 km from the trail's middle, 16 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333646597079838176635038
Low °F192028385060646254433425
Precipitation, in2.72.32.943.94.34.23.53.53.32.82.6
Snow, in9.78.25.11.60000001.56.6
Old maps

USGS topographic maps of the trail's middle go back to the 1915 Norwalk sheet (1:62,500); the 1960 Norwalk sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19417745, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Norwlak Multi-Use Path, relation 19417745 (ways 1228759767-1228759769, 1419314118-1419314138, 1419419825, 1419419826) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: route name and spelling; created August 2, 2025 (relation history); asphalt and concrete cycleway designated for bicycles and walkers; tunnel (way 1228759769); crossings; Gallup Avenue to Akron Road in Norwalk, Huron County (Nominatim reverse geocoding); Norwalk Area Contractors Park (way 1419419823); parking near Akron Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.