States › New York

O&W Pedestrian Promenade and Bikeway

Rail-trail in New York

Runs through Oswego · Oswego County

Conditions now

Loading the weather near Oswego…

Forecast by the National Weather Service for Oswego · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East 2nd Street mile 0.1 directions to trailhead 1
  2. Parking at East 3rd Street mile 0.2 directions to trailhead 2
  3. Parking at East 2nd Street mile 0.2 directions to trailhead 3
  4. Parking at East Oneida Street mile 0.3 directions to trailhead 4
  5. Parking at East 2nd Street mile 0.4 directions to trailhead 5
  6. Parking at East 2nd Street mile 0.4 directions to trailhead 6
  7. Parking at East 2nd Street mile 0.4 directions to trailhead 7
  8. Parking at East Oneida Street mile 0.4 directions to trailhead 8
  9. Parking at East 2nd Street mile 0.4 directions to trailhead 9
  10. Parking at East Oneida Street mile 0.4 directions to trailhead 10
  11. Parking at East Oneida Street mile 0.5 directions to trailhead 11
  12. Parking at East 2nd Street mile 0.5 directions to trailhead 12
  13. Parking at East Mohawk Street mile 0.5 directions to trailhead 13
  14. Parking at West 1st Street mile 0.7 directions to trailhead 14
  15. Parking at West Utica Street mile 0.7 directions to trailhead 15
  16. Parking at West 1st Street mile 0.7 directions to trailhead 16
  17. Parking at West 1st Street mile 0.7 directions to trailhead 17
Oswego Armory, beside the trail (opens in a new tab)
Oswego Armory, beside the trail · Photo: Smerdis · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The O&W Railroad Pedestrian Promenade and Bikeway is a short rail-trail of about half a mile on the east side of the city of Oswego, Oswego County, New York; 0.7 miles are mapped here. It was built on portions of the former line of the New York, Ontario and Western Railway through the city. That railroad began as the New York and Oswego Midland Railroad, organized in 1868 by Dewitt C. Littlejohn of Oswego to run from the docks opposite New York City to Lake Ontario at Oswego, and became the O&W in 1880. Its last train ran on March 29, 1957, and it was the first Class I railroad in the United States to be abandoned in its entirety.

The trail runs between East Cayuga Street and East Mohawk Street and passes through a short tunnel built for the railroad; the tunnel is the one part of the O&W in Oswego still in use, as part of the trail.

The surface is asphalt and concrete, and the trail is used for bicycling, inline skating and walking and is wheelchair accessible. There is no dedicated trail parking; access is from the local streets the trail crosses. In 2026 TrailLink reported that access through the tunnel was interrupted while canal projects were under way, with no date for reopening, and a June 2026 review said the tunnel was still closed.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

NYC Ontario Secondary and Oswego Industrial Track (Conrail). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Oswego, 2.6 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313341536675807872594737
Low °F192027374857636255453526
Precipitation, in3.82.933.53.33.43.43.53.94.64.13.9
Snow, in44.735.317.12.8000000.29.430.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Oswego sheet (1:62,500); the 1954 Oswego West sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. New York, Ontario and Western Railway — Wikipedia · organization · checked Oct 14, 2026
    Supports: New York and Oswego Midland Railroad organized 1868 by Dewitt C. Littlejohn of Oswego, mainline from opposite New York City to Oswego on Lake Ontario, O&W from 1880, last train March 29, 1957, first Class I US railroad abandoned in its entirety
  3. Oswego, New York — Wikipedia · organization · checked Oct 14, 2026
    Supports: nothing remains of the O&W in Oswego except the tunnel, which is used as a rail trail
  4. O&W Railroad Pedestrian Promenade and Bikeway — TrailLink · web · checked Oct 14, 2026
    Supports: trail name, 0.5 miles, built on portions of the former Ontario and Western line through the City of Oswego, East Cayuga St. to East Mohawk St., short railroad tunnel, asphalt and concrete surface, biking, inline skating, walking, wheelchair accessible, no dedicated parking, 2026 closure notice for the tunnel during canalway projects, June 2026 review reporting the tunnel still closed

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.