States › Minnesota

Oak Park Heights Trail System

Greenway in Minnesota

Runs through Oak Park Heights · Washington County

Conditions now

Loading the weather near Oak Park Heights…

Forecast by the National Weather Service for Oak Park Heights · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Valley View Park Road mile 0.5 · restrooms directions to trailhead 1
  2. Parking at Valley View Park Road mile 0.6 · restrooms directions to trailhead 2
  3. Parking at 57th Street North mile 0.8 directions to trailhead 3
  4. Parking at 58th Street North mile 0.8 directions to trailhead 4
  5. Parking at 58th Street North mile 0.9 directions to trailhead 5
  6. Parking at 58th Street North mile 0.9 directions to trailhead 6
  7. Parking at 58th Street North mile 0.9 directions to trailhead 7
  8. Parking at 60th Street North mile 0.9 · water directions to trailhead 8
  9. Parking at 60th Street North mile 1 · water directions to trailhead 9
  10. Parking at 59th Street North mile 1.2 directions to trailhead 10
  11. Parking at 58th Street North mile 1.3 directions to trailhead 11
  12. Parking at 58th Street North mile 1.3 directions to trailhead 12
  13. Parking at 58th Street North mile 1.3 directions to trailhead 13
Phil's Tara Hideaway (opens in a new tab)
Phil's Tara Hideaway · Photo: McGhiever · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

This record covers about 2 miles of asphalt paths in and around Valley View Park and Oak Park Crossing Park, between 58th and 60th Streets North in Oak Park Heights, Minnesota. It is a small part of the city's trail system, which the 2018 comprehensive plan counts at 10.5 miles of separated off-street trails and 4.0 miles of on-street routes, built up since a 1995 bicycle and pedestrian trail plan. The city describes its paths as blacktop or gravel for walking and biking, opens them 5 a.m. to 10 p.m. from May through September and 6 a.m. to 10 p.m. otherwise, and bans motorized vehicles. Oak Park Crossing Park sits on a former Allen S. King plant ash disposal site.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

42% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Stillwater 1 SE, 0.9 km from the trail's middle, 41 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F273244607381858476624532
Low °F91425385060646255422816
Precipitation, in10.91.53.14.25.44.55.33.23.21.61.1
Old maps

USGS topographic maps of the trail's middle go back to the 1948 Stillwater sheet (1:62,500); the 1951 Stillwater sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Parks and Trails, Comprehensive Plan 2018 — City of Oak Park Heights · government source · checked Oct 15, 2026
    Supports: 10.5 miles of off-street trails and 4.0 miles of on-street routes; 1995 Comprehensive Bicycle and Pedestrian Trail System Plan; Oak Park Crossing Park is the newest park, on the former Allen S. King ash disposal facility, adjacent to Valley View Park
  3. City Parks — City of Oak Park Heights · government source · checked Oct 15, 2026
    Supports: comprehensive trail system; paths of blacktop or gravel for walking and biking; park and trail hours; motorized recreational vehicles prohibited
  4. Valley View Park — City of Oak Park Heights · government source · checked Oct 15, 2026
    Supports: Valley View Park on Osgood Avenue, a passive park with trails
  5. Oak Park Crossing Park — City of Oak Park Heights · government source · checked Oct 15, 2026
    Supports: 15125 60th Street North, adjacent to Valley View Park
  6. Oak Park Heights Trail System, way 428293801 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: name, asphalt surface, designated for bicycles and pedestrians; mapped extent of about 2 miles between 58th and 60th Streets North

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.