Obern Trail
Greenway in California
Runs through Eastern Goleta Valley · Santa Barbara County
Conditions now
Loading the weather near Eastern Goleta Valley…
Forecast by the National Weather Service for Eastern Goleta Valley · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- By trainAmtrak: Goleta, CA (GTA) 1.5 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Obern Trail, formerly the Atascadero Creek Bikeway, is a paved path for walking, cycling and horseback riding along Atascadero Creek east of Goleta Beach, in Santa Barbara County, California. Vie and George Obern first proposed the bikeway in 1967, and it became the first of many local bikeways; Vie Obern, a founding board member of the Santa Barbara County Trails Council, started the project and helped raise the millions of dollars needed to build it. A 1975 photograph shows her on the bikeway along the creek. It was renamed the Obern Trail in the couple's honor in 2004.
This record maps about 3.8 miles, from Sandspit Road in Goleta Beach Park east along the creek to the Modoc Road area. A route from the University of California, Santa Barbara campus passes through Goleta Beach Park to the west end. Along the creek a dirt path for pedestrians runs beside the paved trail. East of Arroyo Road the route continues on streets, by Nueces Drive, to a wide separated bike path on Modoc Road toward Santa Barbara. OpenStreetMap tags the trail as an asphalt cycleway shared with pedestrians and horses, with several wooden bridges.
In October 2022 the Goleta City Council approved a San Jose Creek path that will connect two existing path segments into a network of about 3 miles from Calle Real to the Atascadero Creek Bikeway.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Santa Barbara Municipal Airport, 3.6 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 64 64 66 68 69 70 73 74 74 73 69 64 Low °F 41 44 46 48 51 54 58 58 56 51 44 40 Precipitation, in 3.8 3.9 3.1 0.9 0.4 0.1 0 0 0.1 0.7 1.3 2.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1942 Goleta sheet (1:62,500); the 1951 Goleta sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Modoc Road Multiuse Path within 0.2 mi · 2.0 mi, paved
- Las Positas Road Multiuse Path 1.9 mi away · 1.5 mi, paved
- California Mission Trail 4.8 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Rooted in Trail Advocacy (Our History) — Santa Barbara County Trails Council · organization · checked Oct 16, 2026 Supports: Vie and George Obern first proposed the Atascadero Creek Bikeway in 1967, first of many local bikeways, renamed the Obern Trail in 2004 to honor them, Vie Obern a founding board member of the Trails Council
- Vivian 'Vie' Marie Hapeman Obern: 1921 – 2015 — Santa Barbara Independent · press · checked Oct 16, 2026 Supports: she initiated the bikeway project in Goleta and helped raise the millions of dollars to build it, named the Obern Trail in their honor in 2004, 1975 photograph on the bikeway along Atascadero Creek
- Goleta's San Jose Creek Pedestrian and Bike Path Moves Forward With Council Approval — Noozhawk (October 5, 2022) · web · checked Oct 16, 2026 Supports: council approval, path to connect two existing segments into a network of about 3 miles from Calle Real to the Atascadero Creek Bikeway, Obern Trail near Goleta Beach
- Santa Barbara, CA: Obern Trail Bike Path — Great Runs · web · checked Oct 16, 2026 Supports: route from the UCSB campus through Goleta Beach Park, dirt pedestrian path alongside the paved trail by Atascadero Creek, beyond Arroyo Road the route is on roads via Nueces Drive to a wide separated bike path on Modoc Road
- Obern Trail (way 711547355 and 22 sibling ways) — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: mapped extent of about 3.8 miles from Sandspit Road to the Modoc Road area, cycleway with bicycle and foot designated and horse=yes, asphalt surface, wooden bridges, name:etymology Vivian Obern
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.