States › Oklahoma

Oklahoma Greenway Trail (Preliminary)

Greenway in Oklahoma · OpenStreetMap relation

Runs through Oklahoma City · Oklahoma County

Conditions now

Loading the weather near Oklahoma City…

Forecast by the National Weather Service for Oklahoma City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.4 mi 7.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Lincoln Boulevard mile 0 directions to trailhead 1
  2. Parking A mile 0.2 directions to Parking A
  3. Parking B mile 0.3 directions to Parking B
  4. Parking at Greenway Trail Parking mile 3.3 directions to trailhead 4

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Centennial Land Run Monument, beside the trail (opens in a new tab)
Centennial Land Run Monument, beside the trail · Photo: MARELBU · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Oklahoma Greenway Trail is a paved path of about 4.4 miles in Oklahoma City, Oklahoma, mapped in OpenStreetMap as a relation named "Oklahoma Greenway Trail (Preliminary)" and tagged as a proposed bicycle route. The ways inside it are a different matter: they are named Greenway Trail or Oklahoma Greenway Trail and are tagged as cycleways designated for bicycles and pedestrians, mostly concrete, with some asphalt and one unpaved footway section, so the route appears to be built in large part. No manager page naming the trail was fetched.

Mapped parking areas sit near South Lincoln Boulevard and at a Greenway Trail parking lot at the east end of the route.

Press and tourism pages about the Eastern Avenue pedestrian bridge describe a four-mile Greenway River Trail on the north shore of the Oklahoma River in Oklahoma City's Horizons District, linking the North Oklahoma River Trail to the Katy Trail. The city closed part of that trail between the Boathouse District and Eastern Avenue from May 2024 during bridge construction, and the 614-foot bridge opened in September 2025. None of these pages uses the name Oklahoma Greenway Trail, so this record's relation to that trail is not confirmed by a fetched page.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Oklahoma City Will Rogers Airport, 13.5 km from the trail's middle, 33 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F495463717988939284736150
Low °F273140485866706962493830
Precipitation, in1.31.42.53.65.34.53.63.63.73.31.71.8
Snow, in1.81.80.800000000.51.8
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Moore sheet (1:62,500); the 1956 Midwest City sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10433877, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. OpenStreetMap · web · checked Oct 18, 2026
    Supports: relation name and proposed tag; way names, cycleway type, surfaces, designation; parking areas
  3. City cuts ribbon on MAPS 4 pedestrian bridge - Visit OKC · web · checked Oct 18, 2026
    Supports: four-mile Greenway River Trail on north shore at Eastern Avenue; 614-foot bridge; September 2025
  4. Construction begins on MAPS 4 pedestrian bridge over Oklahoma River - OKC VeloCity · web · checked Oct 18, 2026
    Supports: closure between Boathouse District and Eastern Avenue; May 2024; four-mile north-shore trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.