Old Champlain Canal Trail
Canal towpath in New York · OpenStreetMap relation
Runs through Kingsbury, Town of Fort Edward, Halfmoon, Town of Waterford and Village of Waterford · Washington and Saratoga counties
Conditions now
Loading the weather near Mechanicville…
Forecast by the National Weather Service for Mechanicville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Upper Newtown Road mile 0 directions to trailhead 1
- Parking at Brookwood Road mile 1.8 directions to trailhead 2
- Parking at Clute Street mile 3.4 directions to trailhead 3
- Parking at Division Street mile 5 directions to trailhead 4
- Parking at 6th Street mile 5 directions to trailhead 5
- Parking at Division Street mile 5.1 directions to trailhead 6
- Parking at Broad Street mile 5.1 directions to trailhead 7
- Parking at Broad Street mile 5.1 directions to trailhead 8
- Parking at South Street mile 5.2 directions to trailhead 9
- Parking at Tugboat Alley mile 5.3 · restrooms directions to trailhead 10
- Parking at South Street mile 5.3 directions to trailhead 11
- Parking at 1st Street mile 5.3 directions to trailhead 12
- Parking at South Street mile 5.3 directions to trailhead 13
- Parking at Tugboat Alley mile 5.3 · restrooms directions to trailhead 14
- Parking at Van Ness Street mile 5.7 directions to trailhead 15
- Parking at Rabideau Road directions to trailhead 16
Plan your visit
- By trainAmtrak: Fort Edward-Glens Falls, NY (FED) 1.2 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Old Champlain Canal Trail is the towpath of the original Champlain Canal in two places in eastern New York, both part of the Champlain Canalway Trail; the Empire State Trail follows the southern one. About 8.5 miles are mapped here: about 6.6 miles in Waterford and Halfmoon and about 1.9 miles in the Town of Kingsbury. Construction of the canal began in 1817, and it officially opened to boat traffic in 1822. Waterford, at the meeting of the Hudson and Mohawk Rivers and the Champlain and Erie Canals, is the start of the Champlain Canalway Trail.
The southern stretch is the Empire State Trail's 6-mile section from Waterford to Halfmoon. In Waterford the trail starts at Old Champlain Lock 4 at the town's southern edge and follows the canal north to the Fourth Street Bridge and Erie Canal Lock 2 Park, past the Old Champlain Canal Weighlock and under a railroad bridge, then about 1.9 miles to the Halfmoon line; the Empire State Trail's off-road segment begins at 5th Street and Broad Street (Route 32) after half a mile on village streets. From Clute Street the route uses Bells Lane to Schoolhouse Road, where the Halfmoon trail begins, and continues past wetlands, woods and abandoned stone locks to Upper Newtown Road. Parking is at Peebles Island State Park, Lighthouse Park in Halfmoon and Upper Newtown Road.
The northern stretch leaves the Glens Falls Feeder Canal Trail near the Five Combined locks and runs northeast toward State Route 196. In 2018 the Canal Corporation proposed a 3.5-mile project there: resurfacing a mile of existing trail with stone dust, new bridges over the Old Champlain Canal and Bond Creek, 2.5 miles on Towpath Road, and a culvert under Route 196 linking Rabideau Lane to Towpath Road. Most of the Waterford–Halfmoon trail is stone dust, with a short paved stretch between Lock 2 Park and Division Street.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Troy L&D, 12.2 km from the trail's middle, 22 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 46 60 72 80 86 84 77 64 51 40 Low °F 17 18 26 38 49 59 64 62 54 43 33 25 Precipitation, in 2.6 2.4 2.9 3.1 3.8 4.6 4.6 3.9 3.8 4.2 2.8 3.1 - On the National Register
- Glens Falls Feeder Canal, Glens Falls · structure, listed 1985 · nomination file for Glens Falls Feeder Canal
- Champlain Canal, Troy · historic district, listed 1976 · nomination file for Champlain Canal
- New York State Barge Canal, Multiple · historic district
- Peebles (Peobles) Island, Waterford · historic district, listed 1973 · nomination file for Peebles (Peobles) Island
- Northside Historic District, Waterford · historic district, listed 1975 · nomination file for Northside Historic District
- Waterford Village Historic District, Waterford · historic district, listed 1977 · nomination file for Waterford Village Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Cohoes sheet (1:62,500); the 1954 Troy North sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Feeder Canal Heritage Trail within 0.2 mi · 5.3 mi, dirt
- Delaware Avenue Trail 0.5 mi away · 1.3 mi, paved
- Uncle Sam Bikeway 0.7 mi away · 3.1 mi, paved
- Mohawk-Hudson Bike-Hike Trail 0.9 mi away · 33.1 mi, paved
- Champlain Canalway Trail 2.5 mi away · 5.5 mi, paved
- Zim Smith Trail 3.5 mi away · 11.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1698874, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Peebles Island State Park to Halfmoon — Empire State Trail (New York State) · government source · checked Oct 14, 2026 Supports: 6-mile section Waterford to Halfmoon, 5.5-mile off-road stonedust segment starting at 5th Street and Route 32 (Broad Street) after a half mile on village streets, towpath beside the historic Champlain Canal past wetlands, woods and abandoned stone locks, end at Upper Newtown Road, parking at Peebles Island, Lighthouse Park and Upper Newtown Road
- Public Meeting on Champlain Canalway Trail Project (March 14, 2018) — New York State Canal Corporation · government source · checked Oct 14, 2026 Supports: proposed 3.5-mile shared-use path in Kingsbury from the Glens Falls Feeder Canal Trail beside the Five Combined, one mile of existing trail to be regraded with stone dust, new bridges over the Old Champlain Canal and Bond Creek, 2.5 miles on Towpath Road, culvert under Route 196 linking Rabideau Lane to Towpath Road
- Champlain Canalway Trail Profile: Town of Waterford, Village of Waterford (2019 Action Plan) — Mohawk Towpath Scenic Byway · organization · checked Oct 14, 2026 Supports: Waterford at the junction of the Hudson, Champlain Canal, Mohawk and Erie Canal as start of the Champlain Canalway Trail, Empire State Trail follows the same path, route from Old Champlain Lock 4 to the Fourth Street Bridge, Lock 2 Park, weighlock, railroad bridge, 1.9 miles to the Halfmoon border, Clute Street–Bells Lane–Schoolhouse Road link, paved stretch Lock 2 Park to Division Street, stone dust and dirt farther north
- Glens Falls Feeder Canal — Hudson River Valley Institute (Marist College) · organization · checked Oct 14, 2026 Supports: Champlain Canal construction began 1817, officially opened to boat traffic 1822
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.