Old Creamery Nature Trail
Rail-trail in Iowa
Runs through Dysart and Garrison · Tama and Benton counties
Conditions now
Loading the weather near Garrison…
Forecast by the National Weather Service for Garrison · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Holsted Street mile 1 directions to trailhead 1
Plan your visit
More stops from state data
- Trailhead: Old Creamery Trail Trailhead mile 9.7directions to Old Creamery Trail Trailhead
- Trailhead: Old Creamery Trail Trailhead mile 15directions to Old Creamery Trail Trailhead
Links checked Oct 18, 2026. Sources: Iowa DOT Trail Amenities (CC BY 4.0).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Old Creamery Nature Trail is a rail-trail of about 15 miles in Benton County, Iowa, connecting Vinton, Garrison and Dysart. Benton County Conservation manages it. The trail follows part of a former railroad that connected Cedar Rapids to South Dakota. The Iowa Trails Council bought the 15-mile section in 1994, and after hundreds of volunteer hours the trail opened to the public in 2000. On April 22, 2010, after the volunteer trail committee made its final payment to the Iowa Trails Council, the deed was given to the Benton County Conservation Board. The committee still meets monthly from about September through March at the Benton County Nature Center outside Vinton.
The Dysart trailhead is off Highway 21, just east of Casey's; in Vinton the trailhead is near the trail parking at Highway 218 and West 8th Street. Garrison, the halfway point, is the site of the former Garrison creamery and has a rest area with an open-air shelter. Portions of the route are shaded by mature trees, while others pass corn and bean fields and pasture. The mapped line on this page covers about 15 miles of the trail, from Vinton west past Garrison to Dysart.
The surface is crushed limestone, and KCRG counted 13 bridges along the mostly flat route in 2020. Motorized vehicles and horses are not allowed without permits and approval from the Benton County Conservation Board or the trail committee. The county lists a bike fix-it station at the Garrison rest area as coming soon.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 95% of this route as a trail on former railroad right-of-way.
Former Iowa Northern / Chicago, Rock Island & Pacific line, built 1873, abandoned 1985–1994 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Vinton, 14.4 km from the trail's middle, 24 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 26 30 44 59 69 78 81 79 74 60 44 31 Low °F 8 12 24 35 47 57 60 58 50 37 25 14 Precipitation, in 1.2 1.2 2 3.9 5 5.6 4.2 4.2 3.7 3.2 2 1.6 Snow, in 8.3 8.5 4.4 1.4 0 0 0 0 0 0.4 1.8 8.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Waterloo sheet (1:250,000); the 1955 Waterloo sheet (1:250,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesBenton County Conservation trails
- FacebookOld Creamery Nature Trail (Facebook)
- RedditSearch Reddit: r/Iowa
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — Benton County Conservation, Benton County, Iowa · government source · checked Oct 15, 2026 Supports: 15-mile length, Vinton, Garrison and Dysart, crushed limestone surface, former railroad from Cedar Rapids to South Dakota, 1994 Iowa Trails Council purchase, opened to the public in 2000 after volunteer work, donated to Benton County Conservation in 2010, Garrison rest area shelter and planned fix-it station
- The Old Creamery Nature Trail: Basic Information — Benton County Conservation · government source · checked Oct 15, 2026 Supports: trailheads in Dysart and Vinton, shaded portions and fields, motorized vehicle and horse rule, committee meetings, April 22, 2010 donation and final payment to the Iowa Trails Council
- Railroad route from 1872 transformed into Old Creamery Nature Trail — KCRG (August 4, 2020) · web · checked Oct 15, 2026 Supports: Garrison as the halfway point and site of the former creamery, mostly flat route, 13 bridges
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.