Old Eastern Marsh Trail
Rail-trail in Massachusetts
Runs through Salisbury · Essex County
Conditions now
Loading the weather near Salisbury…
Forecast by the National Weather Service for Salisbury · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Friedenfels Street mile 0.1 directions to trailhead 1
- Parking at Friedenfels Street mile 0.1 directions to trailhead 2
About this trail
The Old Eastern Marsh Trail is a paved rail trail in Salisbury, Massachusetts, mapped here as about 3.4 miles from Friedenfels Street, on the north bank of the Merrimack River, to the Massachusetts–New Hampshire line. It is one of the converted sections of the former Eastern Railroad, whose main line was extended to Newburyport on August 28, 1840 and completed to the New Hampshire line on November 9, 1840. The trail is maintained by the Town of Salisbury and Coastal Trails Coalition volunteers and is part of the developing Border to Boston Trail and the East Coast Greenway.
The first section, from the Merrimack River to Mudnock Road, opened in 2010, and the extension to the state line opened in fall 2021. At the south end the Gillis Bridge Connector, under Route 1, links the trail to the Clipper City Rail Trail in Newburyport. Heading north, it crosses the Great Marsh on a tidal river crossing and a wooden boardwalk, uses about 0.2 mile of Gardner Street, and meets the Salisbury Point Ghost Trail at Lion's Park, which runs about 2 miles west to Elm Street in Amesbury. It then crosses US Route 1 on a trail bridge and passes Salisbury Elementary School and Partridge Brook Park. At the state line the 0.2-mile stone dust Seabrook-Salisbury Trail Connector continues to a fire station lot on Collins Street in Seabrook, New Hampshire.
TrailLink lists asphalt, boardwalk and concrete surfaces, and notes that the southern 2.3 miles are also signed as the Salisbury Rail Trail. Structures include a granite railroad bridge near the Friedenfels Street parking and an old railroad bridge on Route 286 near the state line. Parking is at Friedenfels Street, Lion's Park, the Hilton Senior Center, Salisbury Elementary School and the Seabrook fire station lot; Partridge Brook Park and Lion's Park have restrooms.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
67% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Groveland, 17.9 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 46 58 69 78 83 81 73 62 51 41 Low °F 17 19 26 36 46 56 62 60 52 40 32 23 Precipitation, in 3.7 3.6 5 4.2 3.8 4.2 3.6 3.4 4.1 4.9 3.9 4.7 Snow, in 17.9 17.2 14.4 2.4 0 0 0 0 0 0.4 1.8 13 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Newburyport sheet (1:62,500); the 1952 Newburyport East sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationCoastal Trails Coalition: Old Eastern Marsh Trail
Nearby trails
- Salisbury Ghost Trail within 0.2 mi · 2.2 mi, gravel
- Clipper City Rail Trail 0.2 mi away · 3.8 mi, paved
- William Lloyd Garrison Trail 1.7 mi away · 2.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Old Eastern Marsh Trail — Coastal Trails Coalition · organization · checked Oct 13, 2026 Supports: paved, Friedenfels Street to the state line, maintenance by the Town of Salisbury and Coalition volunteers, East Coast Greenway, 2010 and fall 2021 openings, Gillis Bridge Connector, Great Marsh, tidal crossing, boardwalk, Route 1 bridge, Ghost Trail to Elm Street in Amesbury, Seabrook-Salisbury connector, granite railroad bridge, Route 286 railroad bridge, parking locations
- Eastern Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: Old Eastern Marsh Rail Trail among converted sections; main line to Newburyport August 28, 1840, to the New Hampshire line November 9, 1840
- Old Eastern Marsh Trail — TrailLink · web · checked Oct 13, 2026 Supports: Border to Boston Trail, surfaces, Salisbury Rail Trail name for the southern 2.3 miles, 0.2 mile on Gardner Street, Partridge Brook Park and Lions Park restrooms, Collins Street fire station lot
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.