States › Texas

Old Number 9 Trail

Rail-trail in Texas

Runs through Boerne · Kendall County

Conditions now

Loading the weather near Boerne…

Forecast by the National Weather Service for Boerne · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.3 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Old Number 9 Trail Esser Road Trailhead mile 0 directions to Old Number 9 Trail Esser Road Trailhead
  2. Parking at River Road mile 0 directions to trailhead 2
Old No 9 Trail Boerne Texas 2026 (opens in a new tab)
Old No 9 Trail Boerne Texas 2026 · Photo: Larry D. Moore · CC BY 4.0 · Wikimedia Commons

About this trail

The Old No. 9 Trail is a 1.4-mile trail in Boerne, Texas, on the former Southern Pacific Railroad right-of-way, which the city acquired in 1973. The city describes the San Antonio and Aransas Pass line between San Antonio and north Boerne as closely following the Pinta Trail, an early Native American route. The name does not come from a railroad: no railroad had a designated No. 9 route through the Hill Country. It recalls State Highway 9, whose unused roadway segment was renamed Old Number 9.

The city applied for a TxDOT grant in 1993, and city crews built the trail with a stabilized base. Construction on the trailheads and amenities ran from fall 2002 to late summer 2003, with amenities installed through fall 2004. The surface was upgraded from stabilized base to concrete in summer 2015. A bridge added in summer 2018 connects the trail to the Patrick Heath Public Library. The Blanco Road depot shade pavilion replicates the outline of the smaller railroad depots of the line, and OpenStreetMap names an Esser Road trailhead.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boerne, 1.1 km from the trail's middle, 10 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F626672798490929488807063
Low °F374047546369717065564538
Precipitation, in2.32.22.82.55.33.82.82.83.93.92.92.3
Snow, in000000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1954 San Antonio sheet (1:250,000); the 1964 Boerne sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. History and Development - City of Boerne · government source · checked Oct 17, 2026
    Supports: 1973 acquisition, railroad and Pinta Trail, name origin, 1993-2004 timeline, 2015 concrete, Blanco Road pavilion, 1.4 miles
  3. Old No. 9 Trail - City of Boerne · government source · checked Oct 17, 2026
    Supports: 1.4 miles, 2018 library bridge
  4. OpenStreetMap · web · checked Oct 17, 2026
    Supports: Esser Road trailhead name (record trailheads)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.