old railroad grade
Rail-trail in Colorado
In Dolores County
Conditions now
Loading the weather near Rico…
Forecast by the National Weather Service for Rico · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Rio Grande Southern Trail is a dirt trail on the abandoned grade of the Rio Grande Southern railroad along the Dolores River south of Rico, Colorado, in the San Juan National Forest. COTREX, the state's trail database, lists it as Trail #238, managed by the Forest Service's Dolores Ranger District, and gives a length of 2.4 miles at elevations between 8,431 and 8,597 feet. OpenStreetMap labels the path only "old railroad grade" and maps about 3.4 miles.
The Rico Trails Alliance, working with the Town of Rico and the Forest Service since 2017, calls the route the RGS River Trail and plans it as 4.7 miles from Rico south to the Montezuma/Dolores county line; it says much of the trail is already built. A Forest Service decision signed on April 2, 2025 approved a trail of about 2 miles linking the south end of Rico to the existing Rio Grande Southern Trail. The last major piece is a bridge over the Dolores River where the railroad's Bridge 68A once crossed, which the alliance aims to build with the two remaining northern sections in 2026 and 2027. The alliance notes railroad ties, telegraph poles and charcoal kilns along the way, and links to the Colorado Trail by the Ryman Creek and Salt Creek trails.
COTREX opens the trail to hiking, biking, horseback riding and dogs, and closes it to motorcycles, ATVs and other motor vehicles. The alliance describes a gentle grade suited to beginner and intermediate cyclists, with the northern 2 miles accommodating handcycles, and says the trail can be groomed in winter for Nordic skiing, fat biking and snowshoeing.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Telluride 4wnw, 36 km from the trail's middle, 32 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 38 44 51 60 72 77 74 68 57 45 36 Low °F 0 5 13 22 29 34 41 40 34 23 13 2 Precipitation, in 1.4 1.4 1.6 1.7 1.6 0.8 2.4 2.6 2.3 1.6 1.5 1.4 Snow, in 23.6 22 22.7 13.1 5.1 0.3 0 0 0.7 5.3 18.7 19.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1897 Rico sheet (1:62,500); the 1960 Rico sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationRico Trails Alliance: RGS Trail/Bridge Project
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Rio Grande Southern Trail | COTREX · government source · checked Oct 17, 2026 Supports: name, Trail #238, manager USFS Dolores Ranger District, 2.4 miles, dirt, elevation 8,431 to 8,597 feet, San Juan National Forest, allowed and barred uses
- Rico Trails - Rico Rio Grande Southern Trail Construction Project (#64538) — San Juan National Forest, Forest Service · government source · checked Oct 17, 2026 Supports: trail of about 2 miles south from the southern end of Rico to the existing Rio Grande Southern Trail, proposed by the Rico Trails Alliance and the Town of Rico, decision signed April 2, 2025
- RGS Trail/Bridge Project — Rico Trails Alliance · organization · checked Oct 17, 2026 Supports: RGS River Trail name, 4.7 miles from Rico to the Montezuma/Dolores county line on the abandoned Rio Grande Southern grade along the Dolores River, project since 2017 with the Town of Rico and Forest Service, much already built, bridge at the site of historic Bridge 68A, bridge and two northern sections planned for 2026/27, gentle grade, uses including handcycling on the northern 2 miles and winter grooming, Ryman Creek and Salt Creek connections to the Colorado Trail
- Rico Trails Alliance — ColoradoGives.org · organization · checked Oct 17, 2026 Supports: trail suited to beginner and intermediate cyclists, railroad ties, telegraph poles and charcoal kilns along the route
- old railroad grade (way 1135019485) — OpenStreetMap · web · checked Oct 17, 2026 Supports: OSM name 'old railroad grade', ground surface path open to bicycles, about 3.4 miles along the abandoned Rio Grande Southern line south of Rico
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.