States › Colorado

Orchard Trail

Greenway in Colorado

Runs through Westminster · Adams County

Conditions now

Loading the weather near Westminster…

Forecast by the National Weather Service for Westminster · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West 144th Avenue mile 0 directions to trailhead 1
  2. Parking at West 144th Avenue mile 0 directions to trailhead 2
  3. Parking mile 0.1 directions to trailhead 3
  4. Parking mile 0.2 directions to trailhead 4
  5. Parking mile 0.2 directions to trailhead 5
  6. Parking at North Orchard Parkway mile 0.5 directions to trailhead 6
  7. Parking at West 136th Avenue mile 1.4 directions to trailhead 7
  8. Parking mile 1.5 directions to trailhead 8
Orchard Trail (opens in a new tab)
Photo: dgrinbergs · CC BY-SA 4.0 · Mapillary

About this trail

The Orchard Trail is a 1.7-mile concrete shared-use path in Westminster, Colorado, running north from the Big Dry Creek Trail beside Interstate 25 to West 144th Avenue. No city page naming the path was found; the name and route come from OpenStreetMap, which maps it as a designated bicycle and foot path and marks part of it as a local cycle route.

From its south end, where a wooden bridge carries it next to the Big Dry Creek Trail junction by I-25, the path heads north and passes under West 136th Avenue in a lit underpass. It continues north alongside North Orchard Parkway, crosses another bridge, and drops under West 142nd Avenue before reaching West 144th Avenue, where the last stretch runs as a sidewalk-style path along the street. The Quail Creek Trail branches off near the south end.

The surface is concrete for its whole length apart from the wooden bridge deck, and OpenStreetMap shows lighting on some sections. The northern end lies beside the retail district on Orchard Parkway at 144th Avenue, and the I-25 Trail continues north of 144th Avenue nearby.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Northglenn, 5.8 km from the trail's middle, 72 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485058647285918982675648
Low °F192028354453595749372719
Precipitation, in0.50.51.21.92.41.51.71.31.21.10.70.5
Snow, in67.68.26.51.20000.12.46.95.9
Old maps

USGS topographic maps of the trail's middle go back to the 1890 East Denver sheet (1:125,000); the 1957 Eastlake sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Way: Orchard Trail (bridge) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: wooden bridge at south end by I-25, designated bike/foot, local cycle route
  3. Way: Orchard Trail (underpass) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: concrete, lit, tunnel under West 136th Avenue
  4. Way: Orchard Trail (underpass) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: tunnel near West 142nd Avenue and North Orchard Parkway
  5. Way: Orchard Trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: sidewalk-style section at West 144th Avenue
  6. Way: Big Dry Creek Trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: Big Dry Creek Trail at the south end
  7. Way: Quail Creek Trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: Quail Creek Trail near the south end
  8. Way: I-25 Trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: I-25 Trail north of 144th Avenue

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.