Osage Cuestas Trail
Rail-trail in Kansas
Runs through Fredonia and Benedict · Wilson and Neosho counties
Conditions now
Loading the weather near Benedict…
Forecast by the National Weather Service for Benedict · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Osage Cuestas Trail is a rail-banked corridor being developed as a trail in Wilson and Neosho counties, Kansas, running from Fredonia north and east toward Chanute. It was formerly known as the Western Sky Trail. The Sunflower Foundation, which announced grants for the trail in May 2026, gives the corridor as 20 miles (32 km); the mapped line covers about 22.6 miles (36.4 km), from Fredonia past Benedict into Neosho County.
KGGF Radio reported a ribbon cutting for the first two miles (3.2 km) of the trail in Fredonia, with the trailhead near 5th and Polk Streets, and described the expansion as a partnership between the Stay Strong, Live Long Wilson County Coalition and the Sunflower Rail-Trails Conservancy; the page is undated. The foundation's May 2026 grant list says construction began in Fredonia and 7 miles (11 km) are nearing completion in Wilson County, with the trail to continue another 13 miles (21 km) north and east toward Chanute. OpenStreetMap maps the corridor as paths on an abandoned railway, tagged proposed=cycleway, including a bridge.
In May 2026 the foundation awarded $10,000 Trail Steward grants to the conservancy, for repair work on a 150-foot section of bridge on the trail, and to the City of Fredonia, which plans to seek a solution and future state funding for a physical trail crossing over U.S. 400 and to build a repair station and wayfinding kiosk at the trailhead. A post dated October 15, 2026 on a directory listing for the conservancy says a supporter donated $500 toward replacing the burned bridge in Fredonia.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chanute Martin Johnson Airport, 17.4 km from the trail's middle, 7 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 44 50 60 70 78 87 92 91 83 72 58 47 Low °F 23 27 36 46 56 66 70 68 59 47 36 27 Precipitation, in 1.2 1.6 2.5 4.2 5.9 5.6 4.4 3.8 4.1 3.3 2.4 1.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Fredonia sheet (1:125,000); the 1959 Buffalo sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/kansas
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Paving the Way – From Blazing Trails to Community Grant Recipients — Sunflower Foundation · organization · checked Oct 31, 2026 Supports: Osage Cuestas Trail is a 20-mile rail-banked corridor being developed in Wilson and Neosho counties; construction began in Fredonia and 7 miles are nearing completion in Wilson County; another 13 miles north and east toward Chanute; funds for repair of a 150-foot section of bridge; City of Fredonia plans a solution and future funding for a physical crossing of U.S. 400 and a repair station and wayfinding kiosk at the trailhead; Trail Stewards Grants ($10,000 each)
- Sunflower Rail-Trails Conservancy — govserv.org · organization · checked Oct 31, 2026 Supports: post dated 10/15/2026: an Osage Cuestas Trail supporter recently donated $500 to help with replacing the burned bridge in Fredonia
- Sunflower Foundation Announces Area Grant Awards for Public-Access Trail Projects — Ad Astra Radio · web · checked Oct 31, 2026 Supports: article of May 28, 2026: $10,000 Trail Steward grants to Sunflower Rail-Trails Conservancy (Osage Cuestas Trail Bridge Project, repair of a 150-foot section of bridge) and to the City of Fredonia (Osage Cuestas Trail Enhancements); seven miles nearing completion in Wilson County; the rail-banked trail will extend from Fredonia towards Chanute
- Ribbon Cutting For Osage Cuestas Trail Set For Monday — KGGF Radio · web · checked Oct 31, 2026 Supports: ribbon cutting for the first two miles of the Osage Cuestas Trail in Fredonia; formerly known as the Western Sky Trail; expansion is a partnership between the Stay Strong, Live Long Wilson County Coalition and the Sunflower Rails-Trails Conservancy (spelling on the page); trailhead near 5th and Polk Streets in Fredonia; the page shows no calendar date
- Way: Osage Cuestas Trail (689165673) — OpenStreetMap · web · checked Oct 31, 2026 Supports: name=Osage Cuestas Trail, alt_name=Western Sky Trail, highway=path, railway=abandoned, proposed=cycleway, bridge=yes
- Way: Osage Cuestas Trail (1570264621) — OpenStreetMap · web · checked Oct 31, 2026 Supports: name=Osage Cuestas Trail, alt_name=Western Sky Trail, highway=path, railway=abandoned, proposed=cycleway; at the south end of the mapped corridor in Fredonia
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
