Osgood Canal Trail
Canal towpath in North Carolina
Runs through Burgaw · Pender County
Conditions now
Loading the weather near Burgaw…
Forecast by the National Weather Service for Burgaw · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Osgood Canal Greenway and Urban Trail is a loop of paved paths in the center of Burgaw, North Carolina, the Pender County seat. Pender County's tourism office describes it as a 2.2-mile loop of asphalt and concrete walking trails that follows the Osgood Canal through town, passing through woods along the canal and through the downtown, connecting to the town's schools and to both passive parks and playground parks, with access from several streets. The greenway is featured on Segment 14 of the Mountains-to-Sea Trail, which names Burgaw a trail community and points to its 1850s train depot as the oldest in North Carolina.
The Mountains-to-Sea Trail describes Segment 14 as a good place to explore by bicycle as well as on foot, since all of it except a river section and a one-mile loop in Moores Creek National Battlefield follows roads and multi-use trails; the county's listing itself speaks only of walking. Burgaw Now reported a State Parks and Recreation grant of $443,408, matched by the town for a total budget of $886,816, to extend the trail about two miles on the west side of town and reach neighborhoods that the railroad separates from downtown, with three years allowed to finish the work. The report shows no year, and the extension's status could not be confirmed.
The record's map line is about 2.75 miles in seven pieces in OpenStreetMap, forming loops along the canal through central Burgaw, somewhat longer than the county's 2.2-mile figure. No hours, fees or bicycle rules for the greenway itself were found on a fetched page.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Willard 4 SW, 16.6 km from the trail's middle, 3 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 59 66 75 81 87 89 87 82 74 65 58 Low °F 32 35 40 48 56 65 69 67 62 51 40 35 Precipitation, in 3.9 3.2 3.7 4 4 5.4 6.3 7.1 6.9 4.3 3.4 3.6 Snow, in 0.1 0.4 0 0 0 0 0 0 0 0 0 0.3 - On the National Register
- Burgaw Depot, Burgaw · building, listed 1986 · nomination file for Burgaw Depot
- Burgaw Historic District, Burgaw · historic district, listed 1999 · nomination file for Burgaw Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1942 Burgaw sheet (1:62,500); the 1954 Beaufort sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Segment 14 — Mountains-to-Sea Trail (Friends of the Mountains-to-Sea Trail) · organization · checked Oct 16, 2026 Supports: Burgaw, the Pender County seat, a trail community; 1850s Burgaw train depot, the oldest in North Carolina; segment suited to bicycle as well as foot, all but the river section and a one-mile loop in Moores Creek National Battlefield on roads and multi-use trails
- Unification Through Trails: The Osgood Canal Greenway & Urban Trail Grant — Burgaw Now · organization · checked Oct 16, 2026 Supports: State Parks and Recreation grant of $443,408, matched by the town for $886,816; extension of about two miles on the west side of town to connect a railroad-partitioned community; three years to complete
- Trails — Visit Pender (Pender County Tourism) · web · checked Oct 16, 2026 Supports: Osgood Canal Greenway and Urban Trail: 2.2-mile loop of asphalt and concrete walking trails in the central portion of the town limits; follows the Osgood Canal through town; wooded areas along the canal and urban areas downtown; connects to schools; passive and playground parks; several access streets; featured on MST Segment 14
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: record's map line of about 2.75 miles in seven pieces forming loops through central Burgaw
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.