Oxford Depot Trail
Rail-trail in Mississippi
Runs through Oxford · Lafayette County
Conditions now
Loading the weather near Oxford…
Forecast by the National Weather Service for Oxford · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Washington Avenue mile 0.6 directions to trailhead 1
- Parking at Washington Avenue mile 0.6 directions to trailhead 2
- Parking at Presidential Debate Way mile 1 directions to trailhead 3
- Parking at Presidential Debate Way mile 1 directions to trailhead 4
- Parking at Presidential Debate Way mile 1 directions to trailhead 5
(opens in a new tab) About this trail
The Oxford Depot Trail is a paved trail in Oxford, Mississippi, built along an old railroad bed. A University of Mississippi news item dated October 29, 2007 announced a ceremony, set for Friday, October 26, at the Ole Miss-Oxford Depot for Phase I of the city and university's Pathway project. The ceremony was to include the opening of a pedestrian bridge over Jackson Avenue, followed by a pedestrian and bicycle parade along the Oxford Depot Trail to the Boys and Girls Club on Washington Avenue. The item said Phase I included full access to 6.25 miles of infrastructure for walkers, runners and cyclists. The city of Oxford and the Mississippi Department of Transportation funded the project, and the university provided an easement along the old rail bed.
The mapped line covers about 1.0 mile (1.7 km), from Molly Barr Road in the north, across Jackson Avenue on a bridge, to Gertrude Ford Boulevard; OpenStreetMap tags the ways as paved cycleway. In November 2022 HottyToddy.com reported that the Oxford Planning Commission had approved variances for a proposed development off Molly Barr Road that would add a trailhead entry onto the Depot Trail; the developers still had to present a site plan for final approval. The present Oxford Depot dates from 1872; the university bought it in 1983, and it returned to community service in fall 2003.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
University, 0.5 km from the trail's middle, 10 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 57 66 74 82 89 91 91 86 76 64 55 Low °F 31 34 41 49 59 67 70 69 62 49 40 33 Precipitation, in 5.1 5.8 5.6 6.3 5.3 5.2 4.3 3.9 4 4.1 4.3 6.5 Snow, in 0.8 0.2 0.1 0 0 0 0 0 0 0 0 0.1 - On the National Register
- South Lamar Historic District, Oxford · historic district, listed 2009 · nomination file for South Lamar Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1940 Oxford sheet (1:62,500); the 1943 Oxford sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- South Campus Rail Trail 1.2 mi away · 3.0 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City, UM Officials to Celebrate Grand Opening of Oxford Depot Trail — Ole Miss News · organization · checked Oct 31, 2026 Supports: page dated October 29, 2007; ceremony for Phase I of the Pathway project set for Friday, October 26 at the Ole Miss-Oxford Depot, including the opening of a pedestrian bridge over Jackson Avenue; pedestrian/bicycle parade along the Oxford Depot Trail to the Boys and Girls Club on Washington Avenue; full access to 6.25 miles of infrastructure in Phase I; funding by the city of Oxford and the Mississippi Department of Transportation; university easement along the old rail bed for the trail
- Oxford Depot - History — University of Mississippi Libraries · organization · checked Oct 31, 2026 Supports: present depot dates from 1872; university purchased the depot in 1983; depot returned to community service in the fall of 2003
- Oxford Planning Commission Gives Nod to New Development That Proposes Improvements to the Depot Trail Entry — HottyToddy.com · web · checked Oct 31, 2026 Supports: November 15, 2022 article: proposed Trail Head development off Molly Barr Road would add a trailhead entry onto the Depot Trail; the commission approved its variances; developers must present a site plan to the Planning Commission and the Board of Aldermen for final approval
- Oxford Depot Trail (way 41934915) — OpenStreetMap · web · checked Oct 31, 2026 Supports: name Oxford Depot Trail; highway=cycleway, surface=paved, foot=yes; was:railway=abandoned; the connected ways 594768850, 247384466 and 247384465 carry the same name and tags, and on the map the chain runs between Molly Barr Road and Gertrude Ford Boulevard
- Oxford Depot Trail (way 247384466) — OpenStreetMap · web · checked Oct 31, 2026 Supports: bridge=yes, highway=cycleway, surface=paved; the way lies beside Jackson Avenue on the map
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.